AND PHASE 2 Sample Clauses

AND PHASE 2. Complete a Phase 1 Environmental Site Assessment in a manner consistent with the American Society of Testing and Materials standard for a Phase 1 ESA Conduct a visual (existing structures) assessment for typical suspect asbestos containing materials (ACM) Assess the presence of PCB’s at the subject site Collect and evaluate available historical information to determine if evidence exists indicating an existing release, a past release, or a material threat of a release of hazardous substances, hazardous materials or petroleum products to the Property Environmental Grant Writing, EAWs Lead Based Paint Investigations, Mold Assessments, Water Well Location Services Prepare a work plan the Phase 2 Environmental Site Assessment in a manner consistent with the American Society of Testing and Materials standard for a Phase 1 ESA to determine if potential sources of contamination identified during the Phase 1 Investigation are causing a release or threatened release of hazardous substances, contaminants or pollutants to the soil, surface water and ground water on the property in question Prepare a site safety and contingency plan in a manner consistent with the American Society of Testing and Materials standard for a Phase 1 ESA Conduct Phase 2 Environmental Site Assessment in accordance with approved work plan and in a manner consistent with the American Society of Testing and Materials standard for a Phase 1 ESA Other: Geoprobe Subsurface Investigations, Air Quality Monitoring and Permitting, Wastewater Sampling, Soil and Groundwater Sampling, Soil Vapor Investigations, Wetland Delineations, Stormwater Infiltration Assessments, Stormwater Dredge Sampling, UST Assessments, Petrofund Limited Site Investigations and Femedial Investigations, Ag-Chemical Remedial Investigations REMEDIATION SERVICES Prepare and, upon approval, implement the Response Action Plan (RAP) and in a manner consistent with the American Society of Testing and Materials standard for a Phase 1 ESA Following completion of the RAP’s, prepare an Implementation Report for submission for review and approval in a manner consistent with the American Society of Testing and Materials standard for a Phase 1 ESA Brownfields, Cleanups, Feasibility Studies, Asbestos Emission Control Plans, Soil Management Plans, Remediation Bid Specifications, Brownfields Cleanup Grant Writing, EPA Quality Assurance Project Plans ROOFING/WATERPROOFING SERVICES Roofing/Waterproofing Testing and Inspection Services STRUCTURAL S...
AutoNDA by SimpleDocs

Related to AND PHASE 2

  • Phase 2 Phase 2 is expected to consist of Member Nodes and a select number of Nodes operated by non-Members. The non-Member Nodes will be required to comply with Node hosting terms as set forth by the Council, which may be amended from time to time (the “General Node Terms”).

  • Post-Construction Phase A. Upon written authorization from Owner during the Post-Construction Phase, Engineer shall:

  • Construction Phase Part 1 –

  • Design Phase All Basic Services set forth in the Agreement with the exception of Interdisciplinary Document Coordination Review, conducting a Card Trick session, Value-Engineering services, Estimating services. Bidding Phase • All Basic Services set forth in the Agreement. Construction Phase • All Basic Services set forth in the Agreement. Post-Construction • All Basic Services set forth in the Agreement.

  • Pre-Construction Phase Employer’s Liability, Workers’ Compensation, Comprehensive General Liability and Comprehensive Automobile Liability in the amounts as set forth in the UGSC.

  • Commencement Date and Term 1.1 This Agreement shall come into force on [insert date] (the “Commencement Date”) and, subject to paragraph 1.2 below, shall continue in full force and effect until [insert date] OR [until all Services have been completed and all Deliverables have been delivered to the British Council’s satisfaction as set out in Schedule 2 (Terms of Reference)] (the “Term”).

  • Access to Work District representatives shall at all times have access to the Work, wherever it is, in preparation or in progress. Contractor shall provide safe and proper facilities for such access.

  • PRE-CONSTRUCTION PHASE FEE The Pre-Construction Phase Fee is the total compensation payable to Contractor for the performance of Pre-Construction Phase Services, except for Additional Pre-Construction Phase Services approved in advance and in writing by Owner. The Pre-Construction Phase Fee shall be a lump sum amount based on the AACC established in this Agreement.

  • Production Phase contract period in which the Development and the Production are to be performed.

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

Time is Money Join Law Insider Premium to draft better contracts faster.