Parking and Laydown Areas: The location of Contractor parking and laydown areas shall be as agreed upon by the Owner and the Engineer.
The construction laydown areas for the Proposed Scheme are made up of the East Construction Laydown Area, which is situated to the east of the Drax Power Station, across New Road and the Drax Power Station Site Construction Laydown Areas, which are several parcels of land within the Drax Power Station Site.
Contractor shall maintain the Laydown Areas, temporary on-Site roads that it uses for Work until Substantial Completion.
Site Compounds and Pipe Laydown Areas are also proposed as part of the development.
Memorandum, Inland Empire Energy Center Power Project (01-AFC-17C) Staff Analysis Of Proposed Modifications To Change To GE 107H Combined-Cycle Systems, Increase Generation and Add Additional Laydown Areas, From Connie Bruins, CEC Compliance Division Manager, to Interested Parties (Jun.
During construction it may be necessary to fence in the Contractor’s Site Camp (to avoid theft of construction equipment and materials) and the PV Laydown Area/s (to avoid theft of the solar panels and associated infrastructure).
Contractor to complete all Work for fill placing in the Earthfill Dam fill of Laydown Area 32B and Laydown Area 31 to the final required elevation as shown on the Drawings, in accordance with Section 31 70 00 of Appendix 6-2 [Technical Specifications], and extend the Shared Road described in Note 22 of this Appendix 4-1 [BC Hydro Project Schedule] to such Laydown Areas and commence sharing such Laydown Areas with Other Contractors.
The Gas Connection (Work No. 2), Electrical Connection (Work No. 3); Water Supply Connection Corridor (Work No. 4); Water Discharge Connection Corridor (Work No. 5); Laydown Areas (Work No. 9); and Access and Highway Works (Work No. 10); will support the construction and operation of the NSIP and also the Specified Elements and are therefore considered to be associated development for the purpose of Section 115(1)(b) of the PA 2008.
The risk is associated with construction activities for the new Carbon Dioxide Delivery Terminal Compound (if Option 1 is pursued as described in paragraph 2.2.44 of Chapter 2 (Project and Site Description) of Volume 1 of the ES (document reference 6.1.2) and the Drax Power Station Site Construction Laydown Areas.
Contractor shall maintain the Laydown Areas, temporary on-Site roads, Duck Blind Road and Center Levee Road that it uses for Work until Substantial Completion of Subproject 5.