Installation, Testing, Preliminary Acceptance Test, Trial Run And Final Acceptance Test Sample Clauses

Installation, Testing, Preliminary Acceptance Test, Trial Run And Final Acceptance Test. 9.1 The Buyer, the End-user and the Seller/System Integrator will proceed with various tasks ranging from site survey, network planning/design, and equipment installation/optimization/test to acceptance in accordance with the Schedule of Project Progress set out Appendix 4. Within the term of this Equipment Contract, each of the Buyer, the End-user and the Seller/System Integrator should designate a representative in charge of dealing with technical issues in connection with this Equipment Contract, with their work plans to be determined through consultation among representatives of all parties. In the event that any technical problem is identified or a dispute on technical problem arises, representatives of the parties should analyze the reasons, clarify the responsibilities and coordinate to re-design. Day-to-day work and solutions shall be recorded in the work log during the design, commissioning and acceptance period. The daily record therein shall be confirmed by the respective representatives of the Parties by signature and each Party shall keep one copy.
AutoNDA by SimpleDocs

Related to Installation, Testing, Preliminary Acceptance Test, Trial Run And Final Acceptance Test

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • Final Acceptance 1. Within thirty (30) days of the date of receipt by Purchaser and Independent Engineer of the Final Commissioning Report, the Purchaser shall issue a Certificate of Final Acceptance or reject such Report. If the Purchaser neither issues a Certificate of Final Acceptance nor rejects such Report within such thirty (30) day period, then the Date of Final Acceptance of the System shall be deemed to be the date such Final Commissioning Report was received by the Purchaser.

  • Technical Specifications Each Bloom System is an integrated system comprised of a fuel cell stack assembly and associated balance of plant components that converts a fuel into electricity using electrochemical means that (i) has a Nameplate Capacity of at least 0.5 kilowatts of electricity using an electrochemical process and (ii) has an electricity-only generation efficiency greater than thirty percent (30%).

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Facility Type    Call Sign    Exp Date TV Broadcast Station License WBRE-TV 08/01/2007 (Channel 28, Xxxxxx-Xxxxx, Pennsylvania) DTV Facility WBRE-DT 08/01/2007 (Channel 11, Xxxxxx-Xxxxx, Pennsylvania) TV Translator Station License W24BL 08/01/2007 TV Translator Station License W30AN 08/01/2007 TV Translator Station License W51BP 08/01/2007 TV Translator Station License W64AL 08/01/2007 Transmit-Only Earth Station License E910642 11/01/2011 Transmit-Receive Earth Station License E020058 05/03/2017 TV Pickup KA35201 08/01/2007 TV Pickup KA35245 08/01/2007 TV Pickup KA74870 08/01/2007 TV Pickup KC62824 08/01/2007 Broadcast Auxiliary KF5726 08/01/2007 TV Studio Transmitter Link KGH66 08/01/2007 R/P Base Mobile System KGU973 08/01/2007 TV Pickup KK4138 08/01/2007 TV Pickup KL2535 08/01/2007 TV Pickup KP4407 08/01/2007 R/P Base Mobile System KQB618 08/01/2007 TV Pickup KR7688 08/01/2007 TV Pickup KR7693 08/01/2007 TV Pickup KR7771 08/01/2007 TV Pickup KS2001 08/01/2007 TV Pickup KY2899 08/01/2007 R/P Mobile KY5608 08/01/2007 TV Studio Transmitter Link KZO21 08/01/2007 TV Intercity Relay WFW575 08/01/2007 TV Intercity Relay WGI290 08/01/2007 TV Intercity Relay WHB674 08/01/2007 TV Intercity Relay WLI324 08/01/2007 TV Intercity Relay WLI325 08/01/2007 TV Intercity Relay WLI337 08/01/2007 TV Intercity Relay WMF322 08/01/2007 TV Intercity Relay WMF323 08/01/2007

  • Delivery; Acceptance of Premises; Commencement Date Landlord shall use reasonable efforts to deliver the Premises to Tenant on or before the Target Commencement Date, with Landlord’s Work Substantially Completed (“Delivery” or “Deliver”). If Landlord fails to timely Deliver the Premises, Landlord shall not be liable to Tenant for any loss or damage resulting therefrom, and this Lease shall not be void or voidable except as provided herein. If Landlord does not Deliver the Premises within 90 days of the Target Commencement Date for any reason other than Force Majeure delays and Tenant Delays, this Lease may be terminated by Landlord or Tenant by written notice to the other, and if so terminated by either: (a) the Security Deposit, or any balance thereof (i.e., after deducting therefrom all amounts to which Landlord is entitled under the provisions of this Lease), shall be returned to Tenant, and (b) neither Landlord nor Tenant shall have any further rights, duties or obligations under this Lease, except with respect to provisions which expressly survive termination of this Lease. As used herein, the terms “Landlord’s Work,” “Tenants’ Work,” and “Force Majeure Delays” shall have the meanings set forth for such terms in the Work Letter. If neither Landlord nor Tenant elects to void this Lease within 10 business days of the lapse of such 90 day period, such right to void this Lease shall be waived and this Lease shall remain in full force and effect; provided, however, that if Landlord does not Deliver the Premises within 150 days of the Target Commencement Date for any reason other than Force Majeure delays and Tenant Delays, this Lease may be terminated by Tenant by written notice to Landlord, in which case subsections (a) and (b) of this paragraph shall apply. If Tenant does not elected to void this Lease within 10 business days of the lapse of such 150 day period, such right to void this Lease shall be waived and this Lease shall remain in full force and effect.

  • Project Scope This section should contain SOW summary information including: o Project definition and expected duration o Project goals, objectives, o Priorities & expectations o Project approach & responsibilities o Overall coordination and assumptions

  • Commissioning preparation of a system or systems to allow hydrocarbons or other process fluids to be safely introduced into the system or systems for processing. In this phase testing will focus on systems, including utilities.

  • Project Completion Within five (5) days after the delivery by Supplier to Purchaser of a Commissioning Certificate for the Project’s final Turbine, Supplier shall also deliver to Purchaser a completion certificate for all Turbines in the Project (the “Project Completion Certificate”), in the form attached hereto as Exhibit N, together with a list of any remaining Punch List Work on any Turbine, a schedule for completing the Punch List Work and an estimate of the cost of each item of Punch List Work. Supplier shall thereafter promptly complete all Punch List Work.

  • Project Plan Based on the Project Specifications, Omnicare CR has provided a description of services to be performed for Sponsor’s “A multi-center, randomized, double-blind, double-dummy, vehicle-controlled sequential cohort study to determine the safety of PEP005 0.025% and 0.05% topical gel in patients with actinic keratoses” (hereinafter “the Project”) and associated costs. Changes made in the Project scope, at any time during the Project, will result in a corresponding adjustment to the Project costs.