Front End Loader Sample Clauses

Front End Loader. The cost of permits or licences required to drive a front end loader will be paid by the Company.
AutoNDA by SimpleDocs
Front End Loader. Supply a high performance 250 HP front end loader with bucket capacity of at least 2 CUM.
Front End Loader. (FEL) Run Of Mine (ROM) Operation An employee must be competent in the following: • Operate the FEL equipment in a safe and efficient manner within the quarry and around the location. • Complete FEL operations effectively to manage run of mine kiln stone quality and sizing selection and complete blending activities to ensure required sizing and grade control is maintained for in- process and finished products. • Ensure the equipment is always kept in a neat and tidy condition. • Completion of maintenance requests. • Basic plant maintenance. • Identifying breakdown and process upsets and conduct troubleshooting. • Assist maintenance personnel with breakdowns and repairs if required. • Hold a certificate of competency to operate the FEL. • Refuelling FEL as required. • Maintain full xxxxxx levels. • Minimisation of airborne dust through application of sprinklers on stockpiles or additional road base where appropriate. • Load and dispatch sales and internal transfers. • Clean rocks and spillage on roads. • Cleanliness of stockpile areas and direction of products. • Complete a daily pre-start checklist, report and time sheet.
Front End Loader. All work associated with the operation of front end loading within a worksite and including general duties.
Front End Loader. The candidate will demonstrate their ability to properly load a dump truck. They will be judged on how they place the truck, how they enter the stockpile, the angle of their bucket, whether they spin the loader tires, how full the bucket is, and how the load looks when they are finished loading.
Front End Loader. When a Heavy Equipment Operator (HEO) is not available, due to operational need to load trucks in Streets Operations yards and a Street Maintenance Worker, Grounds Maintenance Worker, or Equipment Operator, who is qualified, is assigned to load their truck with a front end loader, with approval of management, they will be set-up to HEO pay. The upgrade will be paid for a minimum of one (1) hour; thereafter, actual pay will be in one- tenth (1/10) hour increments. If a qualified Street Maintenance Worker, Grounds Maintenance Worker, or Equipment Operator, is assigned to load their truck with a front end loader at the Asphalt Plant, with approval of management, they will be set-up to Asphalt Plant Operator (APO) pay. The upgrade will be paid for a minimum of one (1) hour; thereafter, actual pay will be in one-tenth (1/10) hour increments.
Front End Loader. Supply a high performance 250 HP front end loader with bucket capacity of at least 2 CUM. Hour 19 Batch Machin (Concrate Mixer) 200 liters: Supply a high performance one bag tilting drum concrete mixer with driver (operator) to the construction site, according to the specification and complete satisfaction of the office engineer. Day 20 Excavator Works for Excavation and Back filling Hour Lot 3 : Pamir Handpump spare parts Pamir Handpump SN Unit Item Name Specs Photo 1 pcs (Pamir Handpump) T-bar handle Stronger Heavy-Duty Handle, Includes Ball Bearing with different pints and hosting to be used in this handpump part instead of plating bearings. With Adjustable nut to allow the adjustment with desirable handle length. With minimum stroke length 225mm. 2 pcs (Pamir handpump) Long pedestal Pedestal, long, 16kg 3 pcs (Pamir handpump) pump rod , 2.9m long 2.9m Long- SS Connecting Rod Diameter 10mm, Double Hook 4 pcs (Pamir handpump) Pump head with cover Pump Head (Cover),19- 21kg, handpump 5 pcs (Pamir handpump) uPVC pressure pipe, Rising main. uPVC pressure pipe, 63mm diameter (OD), 4.7mm thick wall, to glue, 2.9m long 6 pcs (Pamir handpump) Cone plate, steel cone Thickness 3 mm 7 pcs Pamir handpump) Hex nut, Hex bolt, Flat washer Pamir handpump) Hex nut M16, Hex bolt M16 x 40mm long, Flat washer M16 8 pcs (Pamir handpump) Cylinder assembly containing cylinder, foot valve, rod and plunger. Complete ss, length,970 mm thickness,6mm 9 pcs (Pamir handpump) Pipe Centralizer Internal Dia 62 mm thickness 22 mm 10 pcs (Pamir handpump) Rod centralizer Slot length 29.5-30.5 mm O.D47.8-48.5 mm 11 pcs (Pamir handpump) Rubber cone Dia 62 mm 12 Roll Rope Rope, polypropylene, 10mm thickness, roll of 200m 13 pcs PVC Glue Weld-On PVC Glue, 470ml, for PVC pipe, “Weld-on 717 PVC” minimum 2 year expiry 14 pcs (Pamir handpump) Rubber flapper Thickness 6mm dia,97 mm hole dia 10 mm
AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.