Examples of Sandusky Facility in a sentence
GM has agreed, pursuant to section B and Attachment A to the UAW MOU, to, among other things, provide certain support so that Delphi shall no longer have responsibility for production operations or for employment of UAW-represented employees by dates specified in the UAW MOU in respect of the Saginaw Steering Facility, the Sandusky Facility, the Adrian Facility, the Flint East Facility, the Needmore Road Facility, and the Saginaw E&C Facility.
The test(s) shall be conducted while the emissions unit is operating at its21 Delphi Chassis Systems Sandusky Facility ID: 0322020045pplication: 03-17045PTI Aed: 5/25/2006IssuEmissions Unit ID: B001 maximum capacity, unless otherwise specified or approved by the appropriate Ohio EPA District Office or local air agency.
The purpose of the inspections is to determine the need for implementing the control measures17 pplication: 03-16319National Lime and Stone, Upper Sandusky Facility ID: 0388010031 PTI Ad: 6/9/2005IssueEmissions Unit ID: F004specified in this permit for load-in and load-out of a storage pile, and wind erosion from the surface of a storage pile.
As specified in OAC Rule 3745-31-05, all new sources must employ Best Available8Delphi Chassis Systems Sandusky Facility ID: 0322020045PTI Application: 03-17045 Issued: 5/25/2006 Technology (BAT).
E14.6 Foundation and Bedding and Initial BackfillFoundation and Bedding to be Class B, Type 2 Bedding for shafts with PVC pipe and Type 3 Bedding for shafts with concrete pipe, in accordance with City of Winnipeg standard detail SD-001.
The emission testing shall be conducted on emissions units B002 prior to employing a control efficiency for the use of fuel additive for the purposes of41 Delphi Chassis Systems Sandusky Facility ID: 0322020045pplication: 03-17045PTI Aed: To be entered upon final issuanceIssuEmissions Unit ID: B002calculating HCl emissions (see A.III.7).
The certification shall be provided to Ohio EPA upon completion of construction but14Delphi Chassis Systems Sandusky Facility ID: 0322020045PTI Application: 03-17045Issued: To be entered upon final issuanceprior to startup of the source.
Each counterpart may consist of a number of copies, facsimiles or facsimiles of copies hereof each signed by less than all, but together signed by all of the Parties hereto.
The permittee shall perform or require the supplier to perform the coal sampling in accordance with ASTM method D2234, Collection of a Gross Sample of Coal and21 Delphi Chassis Systems Sandusky Facility ID: 0322020045pplication: 03-17045PTI Aed: To be entered upon final issuanceIssuEmissions Unit ID: B001 analyze the coal sample for ash content (percent), sulfur content (percent), chlorine content (percent), and heat content (Btu/pound of coal).
If no deviations occurred during a calendar quarter, the permittee shall submit a quarterly report,9 Delphi Chassis Systems Sandusky Facility ID: 0322020045PTI Application: 03-17045 Issued: 5/25/2006 which states that no deviations occurred during that quarter.