Pooling Substation/ Pooling Point definition

Pooling Substation/ Pooling Point means a point where more than one Project may connect to a common Transmission System. Multiple Projects can be connected to a pooling substation from where common transmission system shall be constructed and maintained by the WPD(s) to get connected to the ISTS substation. The voltage level for such common line shall be 220 kV or above. Further, the metering of the pooled power shall be done at the injection point, i.e. the ISTS substation. However, the voltage level of transmission system of individual projects up to the pooling substation may be at 33 kV and above. Sub-meters shall be installed at the pooling substation for metering and forecasting and scheduling of individual Projects. The losses in the common transmission system up to the injection point shall be apportioned to the individual Projects for the purpose of billing.
Pooling Substation/ Pooling Point. Means a point where more than one Solar Power projects may connect to a common transmission system. Multiple projects can be connected to a pooling substation from where common transmission system shall be constructed and maintained by the developer(s) to get connected to the ISTS substation. The voltage level for such common line shall be 220 kV and above. Further, the metering of the pooled power shall be done at the injection point, i.e. the ISTS substation. However, the voltage level of transmission system of individual projects up to the pooling substation may be at 33 kV and above. Sub-meters shall be installed at the pooling substation for metering and forecasting and scheduling of individual projects. The losses in the common transmission system up to the injection point shall be apportioned to the individual projects for the purpose of billing.
Pooling Substation/ Pooling Point means a point where more than one solar PV project may connect to a common transmission system within a Solar Park prior to their interconnection with the Grid. The pooling point voltage and metering arrangement shall be as per ISA.

More Definitions of Pooling Substation/ Pooling Point

Pooling Substation/ Pooling Point means a point where more than one Wind Power projects may connect to a common transmission system. Multiple projects can be connected to a pooling substation from where common transmission system shall be constructed and maintained by the WPD(s) to get connected to the ISTS substation. The voltage level for such common line shall be 220 kV and above. Further, the metering of the pooled power shall be done at the injection point, i.e. the ISTS substation. However, the voltage level of transmission system of individual projects up to the pooling substation may be at 33 kV and above. Sub-meters shall be installed at the pooling substation for metering and forecasting and scheduling of individual projects. The losses in the common transmission system up to the injection point shall be apportioned to the individual Projects for the purpose of billing. In such case, it shall be responsibility of the WPD to obtain and furnish the meter reading jointly by the WPD and any competent authority (State Government or Central Government) (if applicable).
Pooling Substation/ Pooling Point means a point where more than one Solar Power Project may connect to a common transmission system. Multiple Projects can be connected to a pooling substation from where common transmission system shall be constructed and maintained by the SPD(s) to get connected to the Delivery Point. The voltage level for such common line shall be as per the voltage level specified in “Interconnection Point”. Further, the metering of the pooled power shall be done at the injection point, i.e. the ISTS substation. However, the voltage level of transmission system of individual projects up to the pooling substation may be at 33 kV and above. Sub-meters shall be installed at the pooling substation for metering and forecasting and scheduling of individual projects. The losses in the common transmission system up to the injection point shall be apportioned to the individual Projects for the purpose of billing. In such case, it shall be responsibility of the SPD to obtain and furnish the meter reading jointly by the SPD and any competent authority (State Government or Central Government) (if applicable).
Pooling Substation/ Pooling Point means the 220 kV Solar Park Pooling Substation along with the metering infrastructure to be constructed and maintained by the Solar Power Developer at his own cost;
Pooling Substation/ Pooling Point means the pooling point voltage and metering arrangement shall be as prescribed by the SPIA.
Pooling Substation/ Pooling Point means a point where more than one solar PV project may connect to a common transmission system within the park. The pooling point voltage and metering arrangement shall be as per ISA.
Pooling Substation/ Pooling Point means a point / substation as identified by the SPIA where more than one solar PV project may connect to a common transmission system. The losses in the common transmission system up to the Delivery point shall be apportioned to the individual projects for the purpose of billing, based on generation side meter reading i.e. at the interconnection point of the pooling substation. In such case, it shall be responsibility of the SPD to obtain and furnish the meter reading jointly by the SPD, SPIA and any competent authority (State Government or Central Government) (if applicable).
Pooling Substation/ Pooling Point means the pooling point voltage and metering arrangement