Pile driving Sample Clauses

Pile driving. Any crane operator who operates a crane equipped with attachments required to install molding walls shall receive an hourly premium of $1.50 over and above his wage rate for every hour so worked. This premium may not apply concurrently with any other premium specified in Article 22.10.
AutoNDA by SimpleDocs
Pile driving. (a) All pile driving and load testing when done by the Contractor shall be the work of xxx xxxxxxxxxx.
Pile driving. ‌ For the term of the Agreement when pile driving work or anchor handling or anchor placement is required, a vessel operated by CMSG bargaining unit Officers will accompany the barge.
Pile driving. Developer shall use means other than hammer pile driving to install soldier piles, sheeting and shoring, and other below-grade support structures.
Pile driving. A. The piles shall be driven to the tip elevations shown on the applicable Final Design, or to an elevation determined by a Professional Engineer, that achieves the required pile stability and specified minimum bearing capacity.
Pile driving. Where a mobile crane of in excess of fifteen tonnes is required to perform pile driving on any site or installation, or is required to be involved in the extraction process, the operator shall receive an additional disability allowance of $4.22 per day or part thereof.
Pile driving. A. Steel driving frames shall be used for driven pile installations.
AutoNDA by SimpleDocs
Pile driving. Any crane operator who operates a crane equipped with attachments required to install molding walls shall receive an hourly pre- mium of $1.50 over and above his wage rate for every hour so worked. This premium may not apply concurrently with any other premium specified in Article 22.10.
Pile driving. The Contractor shall keep spill kits and cleanup materials at pile driving locations; park pile driving equipment over drip pans, absorbent pads, or plastic sheeting with absorbent material; protect pile driving equipment by parking on plywood and covering with plastic whenever precipitation is forecasted. The Contractor shall store pile driving equipment on level ground and protect it from stormwater run-on when not in use. Use vegetable oil instead of hydraulic fluid if practicable.
Pile driving. The laying out and driving of all pile must be done by Carpenters / Pile Drivers. Maintaining and repairing the hammer will be done by the pile driver /xxxxxxxxx. All piling will be unloaded by xxxxxxxxx / pile driver. (Cutting off pile and welding of pile by pile driver / xxxxxxxxx)