FLOOR SLAB Sample Clauses

FLOOR SLAB. All Tenant's with rest room facilities or food preparation areas shall install a floor slab waterproofing membrane in the Premises at Tenant's expense. All floor penetrations must be sleeved and waterproofed, except slabs on grade.
AutoNDA by SimpleDocs
FLOOR SLAB. No penetrations shall be allowed for electrical outlets in floor slabs. All tenants with restroom facilities or food preparation areas shall install a floor slab waterproofing membrane in the Premises. All floor penetrations must be sleeved and waterproofed.
FLOOR SLAB. The following is subject to structural requirements unknown at the time of authoring these specifications. Floor slab to be determined by soils and structural engineers. Floor slab to be a hard trowel finish. Control joints will be caulked. Floor will be installed utilizing a laser screed operation.
FLOOR SLAB. Landlord shall furnish a 4" thick slab on-grade with smooth trowelled concrete surface. The floor elevation may be 3/4" below finished floor elevation in the mall areas adjacent to the Leased Premises. The slab will be designed to support a load of not less than 125 pounds per square foot.
FLOOR SLAB. Where required, tenants shall provide 3000 PSI concrete ---------- slab with welded wire mesh reinforcing.
FLOOR SLAB. The following specification is subject to approval by the structural engineer. It will provide a strong, high quality industrial floor of superior strength and flatness suitable for warehousing and distribution. The concrete floor slab shall be 6" thick, 4,000 psi compressive strength concrete placed over compacted native soil. In the office area, a visqueen vapor barrier will be used under a 6" slab of 4,000 psi compressive strength concrete on compacted native soil or as recommended by soils engineer. Slab slope to be 0.5% or less. The concrete will be placed with a laser screed and finished with riding power trowels to a burnished finish to meet or exceed Ff50 and Fl 30.
FLOOR SLAB. All floor joints in Bays 1.5, 1.7 and 2.7 adjacent to all the outside walls, as well as any floor joints in the heavy trafficked areas, will be caulked. Such caulking to be completed by 4/30/13 for Bays 1.5, 1.7 and 2.7. · Warehouse floors in Bays 1.5, 1.7 and 2.7 to be delivered in broom clean condition. All damage or defects to be repaired at Landlord’s expense. All floor work to be completed by 4/30/13 for Bays 1.5, 1.7 and 2.7. HVAC · Provide: (i) cooling to Bays 1.5, 1.7, and 2.7, pursuant to the agreed upon warehouse cooling standards, (ii) heating and cooling to the Office Space in Bay 2.8, the Lobby, and the Lobby Offices pursuant to the agreed upon general office standards; all pursuant to and in accordance with the terms and conditions in Section 3.9 of the Lease. All HVAC work to be completed by 7/31/13; provided, however, Landlord will provide Tenant with an estimated completion date for all HVAC work as soon as reasonably practicable after the full execution of this Lease by both Landlord and Tenant, and Landlord will nevertheless use commercially reasonable efforts to complete all HVAC work by 6/30/13. Notwithstanding the foregoing, for clarification, Landlord will not provide heating, ventilation or air conditioning to the Bonus Space or Corridor. · Landlord will provide the existing ductwork in the Leased Premises in good working condition; and Tenant shall be responsible, at Tenant’s sole cost and expense, for the addition, modification or relocation of any ductwork within the Leased Premises. Elevators & Escalators · Provide access to both of the existing elevators located in the lobby area outside of Bay 1.8 for access to Bay 2.8. Activate the existing escalators located in the lobby area outside of Bay 1.8 for access to Bay 2.8. All elevator and escalator work to be completed by 6/30/13.
AutoNDA by SimpleDocs
FLOOR SLAB. A reinforced concrete slab will be provided for approximately the first two feet of the space. Uncompacted granular fill shall be provided for the balance of the space.
FLOOR SLAB. (a) Without limiting the provisions of Section 6 above, Purchaser acknowledges that it has reviewed the Floor Slab Reports and all matters in connection therewith, including without limitation the potential costs of correcting any known or unknown defects or movement in, or caused by the movement of, the floor slabs of the Property, any expansive soil problems and any moisture movement (the "FLOOR SLAB DEFECTS"), and that Seller has agreed to make available the maximum sum of Five Hundred Thousand Dollars ($500,000) to Purchaser as set forth herein to reimburse Purchaser for reasonable costs incurred by Purchaser during the Holdback Limitation Period to correct the Floor Slab Defects.
FLOOR SLAB. The reinforced concrete floor slab shall be constructed as slab-on-grade over a minimum 4” thick aggregate base. Floor slab shall be smooth and level, and otherwise ready for carpet and tile finishes. Building Facade Furnish and install the building facade, including brick, aluminum and glass windows, cast stone, EIFS cornice, and necessary supporting systems (including, but not limited to, metal studs and sheathing). For avoidance of doubt, the shell building construction will not include any windows on the rear wall of the Premises. Furnish and install R13 rigid insulation at the building perimeter (adjacent to exterior sheathing).