Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 104 contracts

Samples: Contract, Software License Agreement, Consulting Services

AutoNDA by SimpleDocs

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 58 contracts

Samples: Support Services And, For Custodial Services, Support Services And

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager Manager, in consultation and agreement with the County, shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager Manager, in consultation and agreement with the Director, shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 13 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 13 contracts

Samples: Model Contract, Contract, Costa Mesa Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 9 contracts

Samples: Maintenance and Repair Services, Cooperative Agreement, Contract

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 8 contracts

Samples: Maintenance Consultant Services, Maintenance Consultant Services, Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 8 contracts

Samples: Special Services, License Agreement, Contract Number

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 8 contracts

Samples: The Urban Institute, Language Interpretation and Translation Services, media.governmentnavigator.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Managerproject manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Contractors Project Manager from providing further services to the County under the this Contract.

Appears in 8 contracts

Samples: Agreement, Hosting Services, Hosting Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.Contract.(Note: this provision is optional for commodities and applicable for services)

Appears in 7 contracts

Samples: cams.ocgov.com, voiceofoc.org, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which whose consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 6 contracts

Samples: cams.ocgov.com, cams.ocgov.com, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 4 contracts

Samples: Contract, cams.ocgov.com, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project ManagerContract coordinator, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager Contract coordinator shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Contract coordinator shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project ManagerContract coordinator. The County’s Project Manager Contract coordinator shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 4 contracts

Samples: cams.ocgov.com, Agreement, Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager and key personnel shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. Key personnel are those individuals who report directly to the Contractor’s Project Manager. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 3 contracts

Samples: Inmate Communication Services, cams.ocgov.com, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services Services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services Services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services Services under the Contract.

Appears in 3 contracts

Samples: Regional Cooperative Agreement, Regional Cooperative Agreement, Regional Cooperative Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. County of Orange MA-042-21011330 The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.Contract.(Note: this provision is optional for commodities and applicable for services)

Appears in 2 contracts

Samples: voiceofoc.org, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s ofContractor's Project Manager from providing further services under the Contract.

Appears in 2 contracts

Samples: cams.ocgov.com, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project Contract for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have has the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Samples: Northeast Laboratory Services, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right right, in a reasonable manner, to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Samples: cams.ocgov.com, Laboratory Equipment Maintenance and Laboratory Supplies

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which whose consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Samples: cams.ocgov.com, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 2 contracts

Samples: cams.ocgov.com, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time linestimelines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Samples: cams.ocgov.com, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which whose consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 2 contracts

Samples: cams.ocgov.com, cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Managerproject manager, which whose consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five fourteen (514) business calendar days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. Said approval shall not be unreasonably withheld. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Contractors Project Manager from providing further services to the County under the this Contract.

Appears in 2 contracts

Samples: Storage and Retrieval Services, Storage and Retrieval Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time linestimelines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager Folder: 626663 17 Contractor’s Initial: Wescraft, Inc. Contract #MA-060-13011719 shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling fulf xxxxxx Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing f romproviding services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five f ive (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Managerproject manager, which whose consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five fourteen (514) business calendar days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. Said approval shall not be unreasonably withheld. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Contractors Project Manager from providing further services to the County under the Contract.this Contract.‌

Appears in 1 contract

Samples: Storage and Retrieval Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. Contractor shall notify County’s Project Manager in the event the Contractor’s Project Manager is changed for any reason. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional informationinfonnation, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably umeasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct d irect the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The T he Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager M anager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within w ithin five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: Cooperative Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager and key personnel shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. Key personnel are those individuals who report directly to the Contractor’s Project Manager. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days immediately after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the ofthe Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager M anager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The CountyC ounty’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This The Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Project Manager from providing further services to the County under the this Contract.

Appears in 1 contract

Samples: Service Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Program Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Program Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project Program manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Program Manager. The County’s Project Program Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: Administrative Services Agreement

AutoNDA by SimpleDocs

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to reasonable approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract, provided such removal is lawful. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The T he Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager M anager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within w ithin five (5) business days after written notice by the County’s Project Manager. The County’s Project P roject Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager M anager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the ContractorC ontractor’s Project Manager from providing services to the County under this Contract. The T he County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional informationreason, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Unless noted in this Contract, this Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the from County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.. (Note: this provision is optional for commodities and applicable for services)

Appears in 1 contract

Samples: Csu Fullerton Auxiliary Services Corporation

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: Development and Managed Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in :fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager and key personnel shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. Key personnel are those individuals who report directly to the Contractor's Project Manager. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days immediately after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have has the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager and any other Contractor personnel from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the ContractorC ontractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County C ounty under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager M anager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The T he Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager M anager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within w ithin five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager and/or key personnel from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project ManagerManager and/or key personnel. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager and/or key personnel from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The ATTACHMENT B Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: Fuel Modification Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This The Contractor’s Project Manager shall be is subject to approval by the County and shall not County of Orange, Health Care Agency Folder #: C026022 Contractor: Xxxxxxxx Xxxxx Xxxx Foundation Contract #: MA-042-2001555 be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have has the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts 's eff01ts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by xxxxxx.xx the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further fmther services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's County of Orange SherljfCoroner Department Consultant ServMicAe-s0f6o0r-I1n9m0a1t1e52T8elephone System File No. C021378 9IPage Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project Project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: Legal Process Services

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s 's efforts in fulfilling Contractor’s 's obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s 's Project Manager, which consent shall not be unreasonably withheld. The Contractor’s 's Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s 's Project Manager from providing further futiher services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County County, and shall not be changed without the written consent of the County’s Project Manager, Manager which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time linestimelines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: Business Associate Agreement

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager project manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager project manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Managerproject manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the this Contract and shall diligently pursue all work and services to meet the project time lines. The County’s 's Project Manager shall have the right to require the removal and replacement of the Contractor’s 's Project Manager from providing services to the County under this Contract. The County’s 's Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five three (53) business days after written notice by the County’s 's Project Manager. The County’s 's Project Manager shall review and approve the appointment of the replacement for the Contractor’s 's Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required elects to provide any additional information, reason or rationale in the event it requires request the removal of Contractor’s Project Manager from providing further services to the County under the this Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the express prior written consent approval of the County’s Project Manager, which consent approval shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have the right to require the removal and replacement of the Contractor’s Project Manager and key personnel from providing services to the County under this Contract. The County’s Project manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract. Further, Contractor warrants that all persons employed to provide services under this Contract have satisfactory past work records indicating their ability to adequately perform the work under this Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Contractor’s Project Manager and Key Personnel. Contractor shall appoint a Project Manager to direct the Contractor’s efforts in fulfilling Contractor’s obligations under this Contract. This Project Manager shall be subject to approval by the County and shall not be changed without the written consent of the County’s Project Manager, which consent shall not be unreasonably withheld. The Contractor’s Project Manager shall be assigned to this project for the duration of the Contract and shall diligently pursue all work and services to meet the project time lines. The County’s Project Manager shall have has the right to require the removal and replacement of the Contractor’s Project Manager from providing services to the County under this Contract. The County’s Project manager Manager shall notify the Contractor in writing of such action. The Contractor shall accomplish the removal within five (5) business days after written notice by the County’s Project Manager. The County’s Project Manager shall review and approve the appointment of the replacement for the Contractor’s Project Manager. The County is not required to provide any additional information, reason or rationale in the event it The County is not required to provide any additional information, reason or rationale in the event it requires the removal of Contractor’s Project Manager from providing further services under the Contract.

Appears in 1 contract

Samples: cams.ocgov.com

Time is Money Join Law Insider Premium to draft better contracts faster.