Construction Programme and Method Sample Clauses

Construction Programme and Method. The Project construction works are anticipated to commence in 2021 and for completion by 2025. The upgrading works are to be carried out by conventional method of open-cut excavation to minimize impact and ensure road safety to the existing traffic as concerned by the relevant authorities. The construction sequence is to shift in stages with two-way traffic maintained throughout the construction period. Highways Department –Works Division CE 76/2017 (HY) Upgrading of Remaining Sections of Kam Tin Road and Xxx Xxx Road
AutoNDA by SimpleDocs

Related to Construction Programme and Method

  • Construction Methods No four course of brick-work, with three joints, shall exceed in height, when built, one inch more than the same bricks piles upon one another without mortar. The bricks are to be well soaked in water before use on works, in proper through so as to be thoroughly wet when layed. The Cessation of the bubbles through the water is an irldication of saturation being complete. For ensuring thorough soaking of the bricks every one or two bricklayers or more as necessary, shall be provided with tubs for use The wall of structures shall be carried up regularly in all cases 1` when the nature of the work will admit of it not leaving any part 915mm (3 feet) lower than another. Horizontal courses shalI be straight, level and even and faces of walls smooth and plumb. A straight edge and a plumb- xxx shall be used for constant checking during progress of the work. No brick-bats shall be permitted to be used except when necessary for obtaining the dimension of the different course or for obtaining the specified bond. All unfinished work must be raked back in course unless otherwise directed arid when new work is to be jointed to it the surface of unfinished work must be cleaned and wetted. The bricks shall be laid by placing sufficient mortar on the wall and forcing every brick into it in such a manner as to completely fill every joint with moratar whether at the bottom, side or end of the brick. The mortar to be used shall be that specified for the relevant schedule items and shall comply with the specification for the mortar specified. The bound used shall be English and shall be carried throughout the work. At all angles forming the junction of any two walls, the bricks shall, at each alternate course be carried into each of the respective walls, so as to thoroughly unite the work. V'Jhen the faces are to be plastered, the joints shall be well raked out before any plaster is laid on should the plaster from want of proper joint ranking detach and 7 fall off from the brick work, the contractor shall strip off the plaster bodily to the extent ordered by Superintending Engineer and shall re-do the work properly at his own expense. All requisite scaffolding shall be provided at the contractor's expense and shall be double i.e., must it have two sets of upright supports Care must be taken to ensure the safety of the work people and the contractor must comply with such instructions as the Superintending Engineer may issue to ensure such safety. The contractor will be entirely responsible for any damage or injuries to person or property resulting from ill-erected scaffolding, defective ladders, or otherwise arising out of his default in this respect. The brick work for the retaining wall shall proceed side by side with the depositing and compacting of earth between the retaining walls. At no time shall the brick-work be constructed more than 405mm (1'-4") above Y the compacted earth. In the retaining wall weep-holes shall be provided at suitable intervals as instructed during execution, with the inner surface of the weep-holed plastered 20mm (3/4") thick in cement mortar 1:4 crouched rock of grades in different layer shall be provided at the inner end of the weep-holes to prevent the choking of the weep-holes to have full drainage. No extra payment will be made for this and no deductions will be made for this in the brick-work.

  • Other Methods of Procurement of Goods and Works The following table specifies the methods of procurement, other than International Competitive Bidding, which may be used for goods and works. The Procurement Plan shall specify the circumstances under which such methods may be used: Procurement Method

  • Construction Progress Schedule A schedule indicating proposed activity sequences and durations, milestone dates for receipt and approval of pertinent information, preparation, submittal, and processing of Shop Drawings and Samples, delivery of materials or equipment requiring long-lead time procurement, and proposed date(s) of Material Completion and Occupancy and Final Completion. The schedule will be developed to represent the sixteen or seventeen CSI Specification Divisions. It shall have a minimum number of activities as required to adequately represent to Owner the complete scope of work and define the Project’s critical path and associated activities. If the Project is to be phased, then each individual Phase should be identified from start through completion of the overall Project and should be individually scheduled and described, including any Owner’s occupancy requirements and showing portions of the Project having occupancy priority. The format of the schedule will have dependencies indicated on a monthly grid identifying milestone dates such as construction start, phase construction, structural top out, dry-in, rough-in completion, metal stud and drywall completion, equipment installation, systems operational, Material Completion and Occupancy Date, final inspection dates, Punchlist, and Final Completion date.

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Construction Change Directives 7.3.1 A Construction Change Directive is written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

  • Project Implementation 2. The Borrower shall:

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Purchase Order Flip via Ariba Network (AN) The online process allows suppliers to submit invoices via the AN for catalog and non- catalog goods and services. Contractors have the ability to create an invoice directly from their Inbox in their AN account by simply “flipping” the purchase order into an invoice. This option does not require any special software or technical capabilities. For the purposes of this section, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider of MFMP the right and license to use, reproduce, transmit, distribute, and publicly display within the system the information outlined above. In addition, the Contractor warrants and represents that it is authorized and empowered to and hereby grants the State and the third-party provider the right and license to reproduce and display within the system the Contractor’s trademarks, system marks, logos, trade dress, or other branding designation that identifies the products made available by the Contractor under the Contract.

  • Particular Methods of Procurement of Goods and Works International Competitive Bidding. Goods and works shall be procured under contracts awarded on the basis of International Competitive Bidding.

  • Construction Change Directive A written order prepared and issued by the District, the Construction Manager, and/or the Architect and signed by the District and the Architect, directing a change in the Work.

Time is Money Join Law Insider Premium to draft better contracts faster.