Brush-Up and Cast Replacement Rehearsals Sample Clauses

Brush-Up and Cast Replacement Rehearsals. Brush-up and cast replacement rehearsals must take place within the ten (10) hour work day and the fifty (50) hour work week specified herein. There may be no rehearsal on a two-presentation day and up to two (2) hours of rehearsal on a one-presentation day.
AutoNDA by SimpleDocs
Brush-Up and Cast Replacement Rehearsals. Brush-up and cast replacement rehearsals must take place within the ten (10) hour work day and the fifty (50) hour work week specified herein. There may be no rehearsal on a two-presentation day and up to two (2) hours of rehearsal on a one-presentation day. Canadian Opera Agreement 2016-2019 Page | 75

Related to Brush-Up and Cast Replacement Rehearsals

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Required Procurement Procedures for Obtaining Goods and Services The Grantee shall provide maximum open competition when procuring goods and services related to the grant-assisted project in accordance with Section 287.057, Florida Statutes.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Tool Replacement Personal tools worn out and/or broken on the job will be replaced on a like- for-like basis by the Employer, provided the tool is turned in to the Employer and the Employer had knowledge the tool was being used on the job. If an employee has his/her tools stolen from a state vehicle, the Employer will replace those tools, as long as no employee negligence has occurred.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Replacement of Key Personnel The Engineer must notify the State in writing as soon as possible, but no later than three business days after a project manager or other key personnel is removed from association with this contract, giving the reason for removal.

  • State Approval of Replacement Personnel The Engineer may not replace the project manager or key personnel without prior consent of the State. The State must be satisfied that the new project manager or other key personnel is qualified to provide the authorized services. If the State determines that the new project manager or key personnel is not acceptable, the Engineer may not use that person in that capacity and shall replace him or her with one satisfactory to the State within forty-five (45) days.

  • Network Resource Interconnection Service (check if selected)

Time is Money Join Law Insider Premium to draft better contracts faster.