Brought Forward R. OLD MATERIALS NOT TO BE RE-USED: None of the old materials are to be used for new work except where specifically described as being set aside for re-use. OLD MATERIALS TO BECOME THE PROPERTY OF THE CONTRACTOR: Old materials from alterations, except where described to be re-used or handed over, become the property of the Contractor who must allow credit for same in the Final Summary. HANDING OVER OF MATERIALS: Where certain materials or articles from demolitions or articles are described as to be handed over by the Contractor to the Regional Representative or Representative/Agent, such materials or articles shall be properly stored by the Contractor, until handing over thereof. The Contractor must obtain an official receipt listing the materials or articles and dates of handing over. If the Contractor fails to submit the receipt when requested, it shall be deemed that the materials or articles are still in his possession and he will be held liable to the Department for the full replacement value thereof, which amount will be deducted from any monies due to the Contractor. REMOVAL OF EXISTING WORK Taking up and removing vinyl floor coverings, carpeting, etc 1 Vinyl tile floor covering including preparing screed for new floor covering m2 147 Taking out and removing sundry joinery work 2 Timber skirtings from brickwork m 84 Carried Forward R Brought Forward R Taking out and removing doors, windows, etc including thresholds, xxxxx, etc including making good face brickwork on both sides 3 Timber single door and frame 813 x 2032mm high No 3 4 Steel gate to single door 813 x 2032mm high No 3 Taking out and removing glass and mirrors 5 Carefully remove cracked or broken glazing in panes exceeding 0,1m2 and not exceeding 0,5m2 in existing metal windows and doors including scraping out putty on reveals and prepare windows and or doors to receive new glazing (New glazing elsewhere measured) No 2 Taking down and removing roofs, etc 6 Carefully take out and remove existing IBR roofing sheet and make good trusses to receive new roof covering m2 220 7 Remove existing barge boards m 20 8 Remove insulation m2 220 Taking out and removing classroom fittings 9 1200 x 4000mm Long Chalkboard glued to timber framework No 3 10 Pin-up Board No 6
AutoNDA by SimpleDocs
Brought Forward R. 12.1.7 Previous work - Dimensional accuracy (B3.5) No
Brought Forward R. The steel shall have a minimum yield strength of 228MPa and a minimum ultimate tensile strength of 330MPa. The corrosion resisting coating shall be not less than 275g/m2 commercial class hot dipped galvanising as per SABS 934 before stamping All connector plates shall have been tested by the CSIR and be of a size capable of transmitting the forces between members of a truss without exceeding the design values published in the CSIR report Truss construction Trusses shall be constructed in jigs specially designed to unsure the correct profile, overhangs and cambers Where metal connector plates are used all joints are to be close fitted butt joints made by precision pressing of the metal connector plates into each side of the joint Truss design All trusses shall be designed by a registered Professional Engineer in accordance with SABS 0163 ("Design of Timber Structures") and Code 0160 ("Loadings")
Brought Forward R. Note that the text of the Standard System of Measuring Building Work (seventh edition) and that of the Standard Method of Measuring Building Work for Africa 2015 (first edition) is the same The latest version of the General Preambles for Trades should be referred to should the General Preambles for Trades 2017 be revised in future Supplementary preambles and/or specifications are incorporated in these bills of quantities to satisfy the requirements of this project. Such supplementary preambles and/or specifications shall take precedence over the provisions of the General Preambles The contractor's prices for all items throughout these bills of quantities shall take account of and include where applicable for all of the obligations, requirements and specifications given in the General Preambles and in any supplementary preambles and/or specifications
Brought Forward R. Allow for the preparation and submission of the following documents in respect of all buildings 1 Detailed shop drawings indicating truss sizes, truss positions, bracings, details, etc. to be submitted for approval prior the commencement of any fabrication Item 2 Design certificate indicating the licensed programme used, SANS specifications adhered to, general procedures and loadings adopted, sizes and grading of timber components, details, etc. Item 3 Erection guarantee certificate after the whole completed roof truss structure have been inspected, all defective work have been taken out and made good, etc. to the full satisfaction of the Principal Agent Item Sawn softwood attached to these bills of quantities) No 2 Sawn softwood grade 4 5 38 x 114mm Wall plates m 188 6 50 x 220mm Timber Beam m 68 Sundries 7 Two coats creosote on sawn timbers m2 58 EAVES, VERGES, ETC "Everite FC77" pressed fibre-cement 8 15 x 250mm Fascias and barge boards including galvanised steel H-profile jointing strips m 180 Carried Forward R Brought Forward R
Brought Forward R. External access: adequate access must be provided and any communal goods lift to be operative. - Roofs: complete and waterproofed. - General: all internal finishes complete. No scaffolding allowed in the permises. Or as stipulated in the tenant lease wherin the Principal Agent will instruct. In the event that the Contractor fails to achieve the dates referred to in THE SCHEDULE (or within any extended period in accordance with Clause A29), the Contractor shall be liable to pay to the Employer, penalties as stated in THE SCHEDULE, Clause A4.2, for the period during which any tenancy remains, in the opinion of the Principal Agent, incomplete. Sectional completion of general tenant areas will only be achieved when each of such areas have, in the opinion of the Principal Agent, reached a sufficient state of completion where the tenant has continuous, secure and unimpeded use of the premises. F:.......................... V:......................... T:......................... Section No. 1 PRELIMINARIES AND GENERAL Bill No. 1 Preliminaries & General Mzamasi Solutions Item
Brought Forward R. Double veneer faced hollow core flush panel door with concealed edges all round.
AutoNDA by SimpleDocs
Brought Forward R. Section B : A recital of the headings of the individual clauses in the aforementioned JBCC General Preliminaries
Brought Forward R. The principal agent reserves the right to attend and participate in all contractor/subcontractor's meetings, to invite other employer's agents to attend such meetings at his discretion and to converse and chair any such meetings if the contractor is derelict in his duty in arranging such meetings to the degree of frequency and comprehensiveness dictated in the opinion of the project manager by the circumstances and exigencies of the construction process 6 Site representative (clause 6) F:........................ V:........................ T:........................ Item 7 Compliance with regulations (clause 7) F:........................ V:........................ T:........................ Item 8 Works risk (clause 8) F:........................ V:........................ T:........................ Item 9 Indemnities (clause 9) F:........................ V:........................ T:........................ Item 10 Works insurances (clause 10) F:........................ V:........................ T:........................ Item 11 Liability insurances (clause 11) F:........................ V:........................ T:........................ Item 12 Effecting insurance (clause 12) F:........................ V:........................ T:........................ Item Carried Forward R Brought Forward R 13 NO CLAUSE N/A 14 Security (clause 14) F:........................ V:........................ T:........................ Item Execution (A15-A23) 15 Preparation for and execution of the works (clause 15) F:........................ V:........................ T:........................ Item 16 Access to the works (clause 16) F:........................ V:........................ T:........................ Item 17 Contract instructions (clause 17) F:........................ V:........................ T:........................ Item 18 Setting out of the works (clause 18) F:........................ V:........................ T:........................
Brought Forward R. At the end of each week the contractor shall provide the principal agent with a written record, in schedule form, reflecting the number, type and capacity of all plant, excluding hand tools used on the works each day of that week 105 Guarantees F:........................ V:........................ T:........................