Work Arising definition

Work Arising means further maintenance and repair work and procedures required to be carried out on a Fleet Vehicle to prepare such Fleet Vehicle for service and arising from Vehicle Maintenance as specified in Appendix 1 to Schedule 5.
Work Arising means further maintenance and repair work and procedures required to be carried out on a railway vehicle to prepare such railway vehicle for service and arising from Vehicle Maintenance.

Examples of Work Arising in a sentence

  • The provisions of Annex B of the honorary consultant contract (England) replace Schedule 4 for clinical academics.Schedule 5Recognition for Emergency Work Arising from On-CallDutiesShall apply.Schedule 6Extra Programmed Activities and Spare Professional CapacityShall apply.

  • Contract Work Arising (CWA); This describes materiel removed from a CWI in accordance with a MOD Contract.

  • Year 5 –………………………… 212.6 Expenses Supply includes expenses, equipment, consumables, plus travel and subsistence 212.7 Rates for Work Arising from Additional Scope of Work 213 Rate for additional scope of work such as Change Control and additional Software Maintenance and Support Services shall be: (i) Project Manager …………………..

  • This act regulates the use and development of coastal resources, and establishes the CAFRA zone as the boundaries of CAFRA regulation, consistent with the goals and policies of the CZMA and New Jersey’s CMP.

  • The Contractor shall include on the updates to the production chart any Work Arising from PWGSC 1379 action and indicate how the additional work will impact the completion schedule for the vessel..3 A critical path of work shall be identified, which shows critical tasks that may delay the completion of the refit if they are not completed within the estimated time frame.

  • Consequently, since t0 = 1, the given series isΣ 2kΣ− Σ k≥0k!2 = 0F1; 2 .1Q The hypergeometric series lookup algorithm Σ1.

  • CBM – Condition Based Maintenance UBM - Usage Based MaintenanceRTF – Run To Failure DIM – Design Improvement MaintenanceCM – Condition Monitoring WA – Work Arising FFT – Failure Finding TaskFig.

  • Pursuant to Article IV, paragraph 3, of the Agreement, the PLO shall inform the Government of Israel of the names of the members of the Palestinian Authority in a letter that shall be provided within a week of signing the Agreement.

  • Further Work Arising from the Spatial Saturation Experiments..........................

  • The Contractor must implement further changes to the design, through a Work Arising, as agreed upon and documented in approved meeting minutes.

Related to Work Arising

  • Work area means a room or defined space in a workplace where hazardous chemicals are produced or used, and where employees are present.

  • The Work means each and every activity required for the successful performance of the services described in Section II, the Terms of Reference.

  • Work means all Services to be performed, goods to be delivered, and any appurtenant actions performed, and items produced, conceived, or developed, including Deliverables.

  • Work crew means a program of partial confinement

  • Work Site means the site where the Work is being performed.

  • Network Area means the 50 mile radius around the local school campus the Named Insured is attending.

  • Construction Work means any work in connection with⎯

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • New Work means any Services/Deliverables outside the scope of the Contract and not specifically provided under any Statement of Work, that once added will result in the need to provide the Contractor with additional consideration.

  • Project Work means the work required to complete the Project.

  • Extra Work means any work which is determined by City to be necessary for the proper completion of the Project, but which the Parties did not reasonably anticipate would be necessary at the execution of this Agreement. Consultant shall not perform, nor be compensated for, Extra Work without written authorization from City’s Representative.

  • demolition work means a method to dismantle, wreck, break, pull down or knock down of a structure or part thereof by way of manual labour, machinery, or the use of explosives;

  • Shift Work is defined as the same work performed by two or more employees or two or more successive sets or groups of employees working successive periods.

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • Completion of work means completion of the entire contracted work. Exhaustion of quantity of any particular item mentioned in the bid document shall not imply completion of work or any component thereof.

  • Demolition works means any physical activity to tear down or break up a structure (or part thereof) or surface, or the like, and includes the loading of demolition waste and the unloading of plant or machinery.

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • piece-work means any work the pay for which is estimated by the amount of work performed irrespective of the time occupied in its performance;

  • job work means any treatment or process undertaken by a person on goods belonging to another registered person and the expression “job worker” shall be construed accordingly;

  • Project Architect means the architect retained by Lessee to design and supervise construction of the Improvements.

  • Scope of Work means the description of Services and Deliverables specified in the Contract and as may be amended.