Wired and Office Tested Date definition

Wired and Office Tested Date or "WOT" means the date by which all intraoffice wiring is completed, all plug-ins optioned and aligned, frame continuity established, and the interoffice facilities, if applicable, are tested. This includes the date that switching equipment, including translation loading, is installed and tested.
Wired and Office Tested Date or “WOT” means the date by which all intraoffice wiring is completed, all plug-ins optioned and aligned, frame continuity established, and the interoffice facilities, if applicable, are tested. This includes the date that switching equipment, including translation loading, is installed and tested.
Wired and Office Tested Date or “WOT” means the date by which all intraoffice

Examples of Wired and Office Tested Date in a sentence

  • This is also the order date.- Scheduled Issue Date (SID): The date that the order is to enter the Company's order distribution system.- Records Issue Date (RID): The date that all design and assignment information is to be sent to the central office and installation forces.- Wired and Office Tested Date (WOT): The date by which all intraoffice wiring is to be completed, all plug-ins optioned, aligned, and frame continuity established, and the interoffice facilities, if applicable, tested.

  • Wired and Office Tested Date (WOT): The date by which all intraoffice wiring is to be completed, all plug-ins optioned, aligned, and frame continuity established, and the interoffice facilities, if applicable, tested.

  • Cont'd)5.2 Access Order (Cont'd)5.2.3 Cancellation of an Access Order (Cont'd)(4) (Cont'd) - Wired and Office Tested Date (WOT): The date by which all intraoffice wiring is to be completed, all plug-ins optioned, aligned, and frame continuity established, and the interoffice facilities, if applicable, tested.

  • Cancellation of an Order (continued) Critical Dates (continued) Wired and Office Tested Date (WOT): The date by which all intraoffice wiring is completed, all plug-ins are optioned and aligned, and frame continuity is established.

  • Ordering Options for Switched and Special Access Service (Cont'd)5.2 Access Order (Cont'd)5.2.3 Cancellation of an Access Order (Cont'd)(B) (Cont'd)(2) (Cont'd)- Wired and Office Tested Date (WOT): The date by which all intraoffice wiring is to be completed, all plug-ins optioned, aligned, and frame continuity established, and the interoffice facilities, if applicable, tested.

  • Wired and Office Tested Date ( WOT): The date by which all intraoffice wiring is to be completed, all plug-ins optioned, aligned, and frame continuity established, and the interoffice facilities, if applicable, tested.

  • Carr, President Telephone Operations (4) (Cont'd) ⎯ Wired and Office Tested Date (WOT): The date by which all intraoffice wiring is to be completed, all plug-ins optioned, aligned, and frame continuity established, and the interoffice facilities, if applicable, tested.

Related to Wired and Office Tested Date

  • Standard reference compendia means the American Medical Association Drug Evaluations, the

  • Day-ahead Scheduling Reserves Requirement means the sum of Base Day-ahead Scheduling Reserves Requirement and Additional Day-ahead Scheduling Reserves Requirement.

  • Minimum data set means the data required by the Australian Government from Community Care service outlets, in the form prescribed by the Australian Government, which data is shared with the Queensland Government;

  • Asset Coverage Test is met if the Adjusted Aggregate Asset Amount (as defined below) shall be in an amount at least equal to the Canadian Dollar Equivalent of the aggregate Principal Amount Outstanding of the Covered Bonds as calculated on the relevant Calculation Date. For greater certainty, references in this Schedule to “immediately preceding Calculation Date” and “previous Calculation Date” are to the Calculation Period ending on the Calculation Date.

  • Minimum Capital Requirement means the Minimum Capital Requirement, the minimum group Solvency Capital Requirement or other minimum capital requirements (as applicable) referred to in the Relevant Rules;

  • Clearance System Business Day means, with respect to the Clearance System, any day (other than a Saturday or Sunday) on which the Clearance System is open for the acceptance and execution of settlement instructions.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Coverage Test means each of the Class A/B Par Value Test, the Class A/B Interest Coverage Test, the Class C Par Value Test, the Class C Interest Coverage Test, the Class D Par Value Test, the Class D Interest Coverage Test, the Class E Par Value Test and the Class E Interest Coverage Test.

  • Flood Boundary and Floodway Map (FBFM means an official map of a community, issued by the FEMA, on which the Special Flood Hazard Areas and the floodways are delineated. This official map is a supplement to and shall be used in conjunction with the Flood Insurance Rate Map (FIRM).

  • Valuation manual means the manual of valuation instructions adopted by the NAIC as specified in this section or as subsequently amended.

  • Solar alternative compliance payment or "SACP" means a

  • Day-ahead Scheduling Reserves Resources means synchronized and non-synchronized generation resources and Demand Resources electrically located within the PJM Region that are capable of providing Day-ahead Scheduling Reserves.

  • Interest Coverage Test means the Class A/B Interest Coverage Test, the Class C Interest Coverage Test, the Class D Interest Coverage Test and the Class E Interest Coverage Test.

  • Stand-Alone Test Environment or "SATE" shall have the meaning set forth in Section 12.2.9.3.2.

  • Real-time System Energy Price means the System Energy Price resulting from the Office of the Interconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.