Examples of Water extension in a sentence
For specific information about how to best apply water-efficient landscaping principles to your geographical area, consult with your county Xeriscape garden at Denver Water extension service and local garden and nursery centers.
In accordance with Plan Conformance requirements, a Water Use and Conservation Management Plan (WUCMP) is required for the Center and further evaluation of the anticipated NJ American Water extension, or any alternate proposal, will be necessary as a part of development review.
Water extension – Gregory and Gaylene Peterson Gregory Peterson addressed the Commission:The Peterson’s own some lots out in the Hi-land Heights area and want to know when water and sewer will be extended out to that area because without water and sewer they are unable to sell the lots.Mr. Meiers addressed the issue stating that there was no work planned to extend out there at this time.
Sewer and Water extension project between KLN and Landscape, due by August.
𝐶𝐸(𝑥, 𝑦, 𝐸|δ = Ø)denotes the certainty equivalent of a neutrally framed lottery that is exactly identical in monetary terms to the control lottery.
Soil Conservation.2. Hill-side terracing.3. Plantation for Soil Conservation coffee and rubber plantation.4. Utilization of terrace land for other purposes.5. Contour banding.6. Soil erosion control works.7. Stream bank erosion control.8. Gully control measures.9. Water extension dams/water harvesting.
With Class C shares, you pay a 1% front-end sales charge and a 1% CDSC if you sell within 18 months of purchase, but the operating expenses are also higher than the expenses for Class A shares.
Water extension permits shall expire within one year of issuance if construction has not begun.
Water extension and/or connection for the creation of a lot shall be a one-time waiver, shall not be allowed to serve more than one lot, shall not be transferable, and the properties created shall not be allowed future/additional water for a period of no less than 10 years.
For thermal incinerators, all 3-hour periods of operation during which the average firebox temperature was below the minimum firebox temperature established during the most recent performance test.