Virginia Stormwater BMP Clearinghouse website definition

Virginia Stormwater BMP Clearinghouse website means a website that contains detailed design standards and specifications for control measures that may be used in Virginia to comply with the requirements of the Virginia Stormwater Management Act and associated regulations.
Virginia Stormwater BMP Clearinghouse website means a website that contains detailed design standards and specifications for control measures that may be used in Virginia to comply with the requirements of the Virginia Stormwater Management Act and associated regulations and that is jointly created by the department and the Virginia Water Resources Research Center subject to advice to the director from a permanent stakeholder advisory committee.
Virginia Stormwater BMP Clearinghouse website means a website that contains

Examples of Virginia Stormwater BMP Clearinghouse website in a sentence

  • Design specifications and pollutant removal efficiencies for specific BMPs can be found on the Virginia Stormwater BMP Clearinghouse website at http://www.vwrrc.vt.edu/swc.

  • Design specifications and pollutant removal efficiencies for specific BMPs may be found on the Virginia Stormwater BMP Clearinghouse website.

  • Design specifications for the BMPs listed in the table can be found on the Virginia Stormwater BMP Clearinghouse website.

  • The Virginia Stormwater Management Handbook and Virginia Stormwater BMP Clearinghouse website (BMP Clearinghouse) should be used for design guidance when selecting appropriate channel geometric properties (bank and longitudinal slope, shape, etc.).

  • The Owner shall inspect the Facilities at least once every three (3) years, and the Owner’s maintenance of the Facilities must, at minimum, be in accordance with guidance provided in the latest edition of the “Virginia Stormwater Management Handbook” and at the Virginia Stormwater BMP Clearinghouse website.

  • Design specifications and pollutant removal efficiencies, other than for tPCB, for specific BMPs can be found on the Virginia Stormwater BMP Clearinghouse website at http://www.vwrrc.vt.edu/swc.

  • Design specifications and pollutant removal efficiencies for specific BMPs can be found on the Virginia Stormwater BMP Clearinghouse website.

  • Other BMPs available to comply with the stormwater requirements are listed on the new Virginia Stormwater BMP Clearinghouse website (http://www.vwrrc.vt.edu/swc).

  • Other approved BMPs available on the Virginia Stormwater BMP Clearinghouse website at http://www.vwrrc.vt.edu/swc Website may also be utilized.

  • We would like to thank Neil Wilkof and the Participants of the Fordham IP & public Policy Conference 2012, particularly those from the European Commission, for valuable comments, ideas and suggestions.


More Definitions of Virginia Stormwater BMP Clearinghouse website

Virginia Stormwater BMP Clearinghouse website means a website that contains detailed design
Virginia Stormwater BMP Clearinghouse website means a website that contains detailed design standards and specifications for control measures that may be used in Virginia to
Virginia Stormwater BMP Clearinghouse website means a website that contains detailed 646 design standards and specifications for BMPs that may be used in Virginia to comply with 647 requirements of the Virginia Stormwater Management Act and associated regulations and that is
Virginia Stormwater BMP Clearinghouse website means a state‐designated website
Virginia Stormwater BMP Clearinghouse website means a website that contains 673 detailed design standards and specifications for BMPs that may be used in Virginia to comply

Related to Virginia Stormwater BMP Clearinghouse website

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • Stormwater management system means any equipment, plants,

  • Virginia Stormwater Management Program authority or "VSMP authority" means an authority approved by the State Board after September 13, 2011, to operate a Virginia Stormwater Management Program.

  • Virginia Stormwater Management Act means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.

  • public service infrastructure means publicly controlled infrastructure of the following kinds:

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Database Management System (“DBMS”) is a computer process used to store, sort, manipulate and update the data required to provide Selective Routing and ALI.

  • Database Management System (DBMS) A system of manual procedures and computer programs used to create, store and update the data required to provide Selective Routing and/or Automatic Location Identification for 911 systems. Day: A calendar day unless otherwise specified. Dedicated Transport: UNE transmission path between one of CenturyLink’s Wire Centers or switches and another of CenturyLink’s Wire Centers or switches within the same LATA and State that are dedicated to a particular customer or carrier. Default: A Party’s violation of any material term or condition of the Agreement, or refusal or failure in any material respect to properly perform its obligations under this Agreement, including the failure to make any undisputed payment when due. A Party shall also be deemed in Default upon such Party’s insolvency or the initiation of bankruptcy or receivership proceedings by or against the Party or the failure to obtain or maintain any certification(s) or authorization(s) from the Commission which are necessary or appropriate for a Party to exchange traffic or order any service, facility or arrangement under this Agreement, or notice from the Party that it has ceased doing business in this State or receipt of publicly available information that signifies the Party is no longer doing business in this State.

  • Electronic toll collection system means a system of collecting tolls or charges which is capable of charging an account holder the appropriate toll or charge by transmission of information from an electronic device on a motor vehicle to the toll lane, which information is used to charge the account the appropriate toll or charge.

  • Small municipal separate storm sewer system or "small MS4" means all separate storm sewers that are (i) owned or operated by the United States, a state, city, town, borough, county, parish, district, association, or other public body (created by or pursuant to state law) having jurisdiction over disposal of sewage, industrial wastes, stormwater, or other wastes, including special districts under state law such as a sewer district, flood control district or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under § 208 of the CWA that discharges to surface waters and (ii) not defined as "large" or "medium" municipal separate storm sewer systems or designated under 4VAC50-60-380 A 1. This term includes systems similar to separate storm sewer systems in municipalities, such as systems at military bases, large hospital or prison complexes, and highway and other thoroughfares. The term does not include separate storm sewers in very discrete areas, such as individual buildings.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Air-to-ground radiotelephone service means a radio service, as that term is defined in 47 CFR 22.99, in which common carriers are authorized to offer and provide radio telecommunications service for hire to subscribers in aircraft.

  • energy management system means a set of interrelated or interacting elements of a plan which sets an energy efficiency objective and a strategy to achieve that objective;

  • Municipal Separate Storm Sewer System Management Program or "MS4 Program" means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations and the Act and attendant regulations, using management practices, control techniques, and system, design and engineering methods, and such other provisions that are appropriate.

  • distribution system operator means a natural or legal person responsible for operating, ensuring the maintenance of and, if necessary, developing the distribution system in a given area and, where applicable, its interconnections with other systems and for ensuring the long-term ability of the system to meet reasonable demands for the distribution of electricity;

  • Network means the participating providers described in the Provider Directory.

  • Nuclear pharmacy means a pharmacy providing radio-pharmaceutical service.

  • CAISO Global Resource ID means the number or name assigned by the CAISO to the CAISO- Approved Meter.