Examples of Underground Services in a sentence
Contractor may not begin excavation until it has obtained and submitted to Engineer an inquiry identification number from Underground Services Alert.
The CONTRACTOR shall notify Underground Services Alert (USA Dig) at 1-800-227-2600, and NV Energy, Truckee Meadows Water Authority (TMWA), SBC, Charter Communications and other cable companies not less than five (5) working days prior to the start of construction to verify the location and depths of utilities.
Government Code § 4216.2 requires that, except in an emergency, Contractor must contact the appropriate regional notification center, or Underground Services Alert, at least two working days, but not more than 14 calendar days, before starting any excavation if the excavation will be conducted in an area that is known, or reasonably should be known, to contain subsurface installations.
PS.2.2 Proving Underground Services This clause must be read in conjunction with Clause DB.5.1.2, the requirements of which shall be extended to cover all earthworks operations whether for trenching or bulk earthworks, in the vicinity of underground services.
The contractor shall contact Underground Services Alert (USA) prior to excavation.
Government Code § 4216.2 requires that, except in an emergency, Contractor mustcontact the appropriate regional notification center, or Underground Services Alert, at least two working days, but not more than 14 calendar days, before starting any excavation if the excavation will be conducted in an area that is known, or reasonably should be known, to contain subsurface installations.
Extensions 1 Underground Services The insurance by this Section is extended to include accidental Damage to underground service pipes and cables at the Premises for which You are responsible as tenant but not as owner.
Extensions 1 Underground Services The insurance by this Section is extended to include accidental Damage to underground service pipes and cables at the Premises for which You are responsible as owner of the Premises.
The Corridor Manager must, in consultation with owners of any affected Utility Structures, approve the specific location of underground Utility Structures prior to their installation and as early as possible.2. Underground Utility Structures must be of minimal size to meet functional requirements.3. Duct colours for the different Utility Structures must be in accordance with the guidelines as specified in Clause 34 of the Department of Labour Guide for Safety with Underground Services (2002).
The CONTRACTOR shall notify Underground Services Alert (USA Dig) at 1-800-227-2600, and NV Energy, Truckee Meadows Water Authority (TMWA), SBC, Charter Communications and other cable companies not less than five (5) working days prior to the start of patching activities to verify the location and depths of utilities.