Ultimate load definition

Ultimate load means the limit load multiplied by the appropriate factor of safety.
Ultimate load means the absolute maximum magnitude of load that a component or system can sustain, limited only by failure.
Ultimate load means the absolute maximum magnitude of load that a component or system can sustain,

Examples of Ultimate load in a sentence

  • Principles of Working Stress methods, Design of tension and compression members, Design of beams and beam column connections, built-up sections, Girders, Industrial roofs, Principles of Ultimate load design.

  • All assemblies, components, or sub- assemblies qualifying under this test shall be subject to a continuing quali- fication testing program acceptable to HUD.(b) Ultimate load tests.

  • Principles of Working Stress methods, Design of tension and compression members, Design of beams and beam column connections, built‐up sections, Girders, Industrial roofs, Principles of Ultimate load design.

  • Ultimate load tests must be performed on a minimum of three assemblies or components to generally evaluate the structural design.

  • Ultimate load tests were carried out on the specimens to evaluate the effectiveness of the repair methods.Test results show that grout is more effective in repairing large cavity-type damages compared to resin.

  • Ultimate load tests were carried out on five full scale timber pile specimens with different levels of damage and repaired using different methods to evaluate the effectiveness of the repair methods.Test results show that grout is more effective in repairing large cavity-type damages compared to resin.

  • Concrete Structures: Working stress, Limit state and Ultimate load design concepts; Design of beams, slabs, columns; Bond and development length; Prestressed concrete; Analysis of beam sections at transfer and service loads.

  • Ultimate load test conditions selected for substantiating the strength envelope for each component of the air vehicle.

  • All assemblies, com- ponents or subassemblies qualifying under this section shall be subject to a continuing qualification testing pro- gram acceptable to the Department.(b) Ultimate load tests.

  • Area/ Sector, City to be developed.2. Details of area along with geographical map marking the proposed project in details.3. Quantum of load/ Nature of load: Details of domestic/ commercial/ Industrial etc as per Annexure H.4. Ultimate load requirement.


More Definitions of Ultimate load

Ultimate load means the load which when applied at a point 0.61 metres below the top of the pole causes failure;
Ultimate load means the limit load multiplied by the appropriate factor of safety; “UHF” means Ultra High Frequency

Related to Ultimate load

  • Eurodollar Rate Loan means a Loan that bears interest at a rate based on the Eurodollar Rate.

  • First draw sample means a one−liter sample of tap water that has been standing in plumbing pipes at least 6 hours and is collected without flushing the tap.

  • LIBO Rate Loan means a Loan bearing interest, at all times during an -------------- Interest Period applicable to such Loan, at a fixed rate of interest determined by reference to the LIBO Rate (Reserve Adjusted).

  • Drawing means the drawing or drawings specified in or annexed to the Specifications;

  • Cov-Lite Loan A Collateral Obligation the Underlying Documents for which do not (i) contain any financial covenants or (ii) require the Obligor thereunder to comply with any Maintenance Covenant (regardless of whether compliance with one or more Incurrence Covenants is otherwise required by such Underlying Documents); provided that, notwithstanding the foregoing, a Collateral Obligation shall be deemed for all purposes (other than the S&P Recovery Rate for such Collateral Obligation) not to be a Cov-Lite Loan if the Underlying Documents for such Collateral Obligation contain a cross-default or cross acceleration provision to, or such Collateral Obligation is pari passu with, another loan, debt obligation or credit facility of the underlying Obligor that contains one or more Maintenance Covenants.

  • credit meter means a meter where an account is issued subsequent to the consumption of electricity;

  • Project Preparation Advance is modified to read “Preparation Advance” and its definition is modified to read as follows:

  • Eurocurrency Rate Loan means a Loan that bears interest at a rate based on the Eurocurrency Rate. Eurocurrency Rate Loans may be denominated in Dollars or in an Alternative Currency. All Loans denominated in an Alternative Currency must be Eurocurrency Rate Loans.

  • Final Drawing has the meaning specified in Section 3.05(i).

  • Term SOFR Rate Loan means a Loan made hereunder with respect to which the interest rate is calculated by reference to Term SOFR (other than a Loan for which clause (c) of the definition of Base Rate is used to determine Base Rate).

  • Shop Drawing means any and all drawings, diagrams, layouts, explanations, illustrations, manufacturer's drawings or other written or graphic materials which illustrate any portion of the construction work.

  • Extended Letter of Credit has the meaning given that term in Section 2.3.(b).

  • Bank Guarantee means an irrevocable and unconditional undertaking by a trading bank approved by the Council to pay the Development Contribution amount on demand without an expiry or end date and containing terms and conditions acceptable to Council and in accordance with clause 9 of this Agreement;

  • Letter of Credit Disbursement means a payment made by Issuing Lender or Underlying Issuer pursuant to a Letter of Credit.

  • Line Item means a field of information (or a combination of fields of information) to be entered in a Settlement Schedule by any Participating Subscriber in relation to a Conveyancing Transaction.

  • Incremental Operating Costs means the incremental expenses incurred by the Recipient’s implementing agencies on account of Project implementation, management, and monitoring, including office space rental, utilities, and supplies, bank charges, communications, advertising, vehicle operation, maintenance, and insurance, building and equipment maintenance costs, travel and supervision costs, and salaries of supporting staff, but excluding salaries of officials of the Recipient’s civil service.

  • Letter of Credit Advance means an advance made by any Issuing Bank or any Lender pursuant to Section 2.03(c).

  • Letter of Credit Liability means the sum of (x) aggregate amount of the undrawn stated amount of all outstanding Letters of Credit plus (y) the amount drawn under Letters of Credit for which the Letter of Credit Issuer and the Lenders, or any one or more of them, have not yet received payment or reimbursement (in the form of a conversion of such liability to Loans, or otherwise) as required pursuant to Section 2.8.

  • Letter of Credit Payment means any amount paid or required to be paid by the Issuing Lender in its capacity hereunder as issuer of a Letter of Credit as a result of a draft or other demand for payment under any Letter of Credit.

  • Project Costs means all allowable costs, as set forth in the applicable Federal cost principles, incurred by a recipient and the value of the contribu- tions made by third parties in accom- plishing the objectives of the award during the project period.

  • LIBOR Rate Loan means a Loan that bears interest based on LIBOR.

  • Letter of Credit Guaranty means one or more guaranties by the Administrative Agent in favor of the L/C Issuer guaranteeing or relating to the obligations of the Borrower to the L/C Issuer under a reimbursement agreement, Letter of Credit Application or other like document in respect of any Letter of Credit.

  • Letter of Credit Liabilities means, at any time and in respect of all Letters of Credit, the sum of (a) the aggregate amount available to be drawn under all such Letters of Credit plus (b) the aggregate unpaid amount of all Reimbursement Obligations then due and payable in respect of previous drawings under such Letters of Credit.

  • Utilisation means a utilisation of the Facility.

  • Draw Request Any request by the Borrower, pursuant to Section 2.2 of this Agreement, for a disbursement of any portion of the proceeds of the Loan.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan; and