Examples of Type rating in a sentence
BAETC provides basic aircraft engineering training, specialized aircraft Type rating courses, as well as ground operations training.
Type, rating, material construction accessories & installation work shall be as per schedule of work & relevant chapter of General specifications for Civilworks Part- v (wet riser & sprinkler system) 2006, amended to date.
Pilot-In-Command (Airplanes) 800 hrs Pilot hours in the preceding 12-months 100 hrs¹ ¹ Or performed as an AKC in the past 12-months on a minimum of 10 dispensing sorties or received a Type rating (or PPE) in the make and model to be flown in the past 12-months.
Type, rating, material construction accessories & installation work shall be as per schedule of work & relevant chapter of General specifications for electrical works Part- v (wet riser & sprinkler system) 2006, amended to date.
The Project is to consist of one (1) 480 V STAMFORD GENERATOR, Type: PE 734 E2 with Type rating of 2300 KVA and a rated output of 1426 KW at 100 % pf and 1416 KW at 80% pf.
Type rating training courses approved before the approval of the minimum syllabus of pilot type rating training in the operational suit ability data for the relevant type of aircraft in accordance with Regulation (EU) No 748/2012 shall include the mandatory training elements not later than 18 December 2017 or within two years after the operational suitability data was approved, whichever is the latest.
Type rating training courses approved before the approval of the minimum syllabus of pilot type rating training in the operational suit ability data for the relevant type of aircraft in accordance with Regu lation (EU) No 748/2012 shall include the mandatory training elements not later than 18 December 2017 or within two years after the opera tional suitability data was approved, whichever is the latest.
Type rating training courses approved before the approval of the minimum syllabus of pilot type rating training in the operational suit ability data for the relevant type of aircraft in accordance with Regu lation (EU) No 748/2012 shall include the mandatory training elements not later than 18 December 2017 or within two years after the oper ational suitability data was approved, whichever is the latest.
South Africa is a middle-income country with per capita GNI (Gross National Income) of $2750 (2003) whilst Mozambique is a low income country with per capita GNI of $210 (2003) [5].
Type, rating, material construction accessories & installation work shall be as per schedule of work & relevant chapter of General specifications for Civil works Part- v (wet riser & sprinkler system) 2006, amended to date.