Turnaround Times definition

Turnaround Times. The process is one that is heavily reliant on precision, length of queue, and a little bit of luck. Once your order form, music, and deposit have been received, it can take roughly eight weeks for your test pressings to be shipped. Once you approve your tests and all of the components 0ackets, inserts, stickers, etc.) have been received, it typically takes another eight weeks for your order to be completed. It is possible for sooner but just as possible for later as there are limits to the control we have on 1960's technology. The only promise we make on turn times is that we'll try our best as that's the only thing we can truly control. Quantities: All Orders are considered COMPLETE if final shipment is within 10% plus or minus the amount ordered, customer is responsible for the costs of any overrun manufactured within 10% of the order.
Turnaround Times means the elapsed time between receipt of an order for a workable product and the time of receipted delivery of all the finished units of the complete order by the delivery point designated by WMI.
Turnaround Times means , in relation to the production of Test results, the relevant ‘turn-around-time’ from receipt of the Sample to making the Test result available for each individual service, as set out in Schedule 2;

Examples of Turnaround Times in a sentence

  • A list of accessories eligible for replacement pursuant to the foregoing is available at the URL: xxxx://xxx.xxxxxxxxxx.xxx/apps/PICAccessoryCoverage/landing.jsp Expedited Turnaround Times WA will use reasonable efforts to repair a Covered Device and return it to Customer within 5-7 business days (excluding WA holidays) from the date of its receipt by WA.

  • Paper Check – Turnaround Times Payment Type Average TAT from claim paid date EFT-Direct Deposit 3-4 days Paper Checks 3-4 days to drop to mail plus mail time, average 11 days Contact your Provider Services Representative for assistance in confirming your last Molina check and billing address of record.

  • Turnaround Times Prices are based on turnaround times as set forth below.

  • During any period 547 in which the Contractor does not have a system in place for determining actual vehicle 548 Turnaround Times, the actual vehicle Turnaround Times will be determined for transfer vehicles 549 based on the recorded inbound and outbound scale house times, which will necessitate the 550 transfer vehicle drivers stopping at the scale house at both facility arrival and departure times.

  • Turnaround Times: Xxxx Rapid Analysis – Next Business Day (from receipt of samples & submission form) Other Analyses and Packages – Depending on sample receipt, analyses needed and lab capacity, the sample testing takes between 3 – 10 business days.

  • Time of Flight Mass Spectrometry Improve Turnaround Times in the Clinical Microbiology Laboratory: a Retrospective Analysis.

  • A list of accessories eligible for replacement pursuant to the foregoing is available at the URL: xxxx://xxx.xxxxxxxxxx.xxx/apps/PICAccessoryCoverage/landing.jsp Expedited Turnaround Times WA will use reasonable efforts to repair a Covered Device and ship to Customer within 5-7 business days (excluding local holidays) from the date of its receipt by WA.

  • Delivery for PME repair items is expressed in Turnaround Times (TAT) which is defined as beginning with the date of receipt of funded order and repairable item—whichever is later, and ending when all repair actions are completed and the item is made available for pick-up by NGC.

  • All Turnaround Times and expected delivery dates are estimates, and do not constitute a guaranteed commitment by BASIC LAB.

  • Following execution of this Agreement the Customer agrees not to stockpile failed units and accepts that Aviat Networks will not be required to meet the Turnaround Times outlined in this Agreement if the units are not returned to Aviat Networks on receipt of an RMA Number or if they are stockpiled.

Related to Turnaround Times

  • Turnaround means the procedure of shutting a refinery unit down after a run to do necessary maintenance and repair work and putting the unit back on stream.

  • Real-time System Energy Price means the System Energy Price resulting from the Office of the Interconnection’s dispatch of the PJM Interchange Energy Market in the Operating Day.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Modular building manufacturer means a person or corporation who owns or operates a

  • Project Scope means the description or activity of work to be accomplished on the Project.

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Day-ahead System Energy Price means the System Energy Price resulting from the Day- ahead Energy Market.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Minimum Hourly Work Requirement means the work hours over a given time period that are required of you by your Employer in order to be eligible for coverage. Your Minimum Hourly Work Requirement is specified in the Schedule of Benefits.

  • Project Start Date means the first Milestone Start Date specified in Schedule B;

  • Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.

  • As built plans means drawings depicting conditions as they were actually constructed.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.

  • Service Specifications means the following documents, as applicable to the Services under Your order:

  • Spares means a part or a sub-assembly or assembly for substitution which is ready to replace an identical or similar part or sub-assembly or assembly including a component or an accessory;

  • Exit Point means a border control post or any other place designated by a Member State where animals, falling within the scope of Regulation (EC) No 1/2005, leave the customs territory of the Union;

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Electric System Upgrades means any Network Upgrades, Distribution Upgrades, or Interconnection Facilities that are determined to be necessary by the CAISO or Participating Transmission Owner, as applicable, to physically and electrically interconnect the Project to the Participating Transmission Owner’s electric system for receipt of Energy at the Point of Interconnection (as defined in the CAISO Tariff) if connecting to the CAISO Grid, or the Interconnection Point, if connecting to a part of the Participating TO’s electric system that is not part of the CAISO Grid.

  • Lowest Achievable Emission Rate (LAER means, for any source, the more stringent rate of emissions based on the following:

  • Scheduled Commissioning Date or “SCD” of the Project shall mean [Insert Date];

  • Standard Specifications means a compilation in book form of specifica- tions approved for general application and repetitive use;

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;