Utilization review organization means a person that conducts utilization review, other than a health carrier performing a review for its own health plans.
Application Review Start Date means the later date of either the date on which the District issues its written notice that the Applicant has submitted a completed Application or the date on which the Comptroller issues its written notice that the Applicant has submitted a completed Application and as further identified in Section 2.3.A of this Agreement.
Public safety answering point (PSAP) means a 24-hour, state, local, or contracted communications facility, which has been designated by the local service board to receive 911 service calls and dispatch emergency response services in accordance with the E911 service plan.
Municipal Separate Storm Sewer System Management Program or "MS4 Program" means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations and the Act and attendant regulations, using management practices, control techniques, and system, design and engineering methods, and such other provisions that are appropriate.
Independent review organization means an entity that is accredited to conduct independent external reviews of adverse benefit determinations.
Transportation network company driver or “driver” means an
air transport service means a service for the transport by air of persons, mails or any other thing, animate or inanimate, for any kind of remuneration whatsoever, whether such service consists of a single flight or series of flights;
Public safety answering point or “PSAP” means an answering location for 9-1-1 calls originating in a given area. A PSAP may be designated as Primary or Secondary, which refers to the order in which calls are directed for answering. Primary PSAPs respond first; Secondary PSAPs receive calls on a transfer basis only, and generally serve as a centralized answering location for a particular type of emergency call. PSAPs are staffed by employees of Service Agencies such as police, fire or emergency medical agencies or by employees of a common bureau serving a group of such entities.
Solid film lubricant means a very thin coating consisting of a binder system containing as its chief pigment material one or more of molybdenum disulfide, graphite, polytetrafluoroethylene (PTFE) or other solids that act as a dry lubricant between faying surfaces.
Bulk gasoline terminal means a gasoline storage facility which receives gasoline from its supply source primarily by pipeline, ship, or barge, and delivers gasoline to bulk gasoline plants or to commercial or retail accounts primarily by tank truck; and has an average daily throughput of more than 76,000 liters (20,000 gallons) of gasoline.
Biological safety cabinet means a containment unit suitable for the preparation of low to moderate risk agents where there is a need for protection of the product, personnel, and environment, according to National Sanitation Foundation (NSF) Standard 49.
Coordinated licensure information system means an integrated process for collecting, storing, and sharing information on nurse licensure and enforcement activities related to nurse licensure laws that is administered by a nonprofit organization composed of and controlled by licensing boards.
Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.
Utilization review plan or "plan" means a written procedure for performing review.
Radio frequency identification (RFID means an automatic identification and data capture technology comprising one or more reader/interrogators and one or more radio frequency transponders in which data transfer is achieved by means of suitably modulated inductive or radiating electromagnetic carriers.
Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.
Summary Subcontract Report (SSR) Coordinator, as used in this clause, means the individual at the department or agency level who is registered in eSRS and is responsible for acknowledging or rejecting SSRs in eSRS for the department or agency.
Asset Review Report means, with respect to any Asset Review, the report of the Asset Representations Reviewer prepared in accordance with Section 3.5.