Transmission Interconnection Feasibility Study definition

Transmission Interconnection Feasibility Study means a study conducted by the Transmission Provider in accordance with Tariff, Part IV, section 36.2.
Transmission Interconnection Feasibility Study means a study conducted by the Transmission Provider in accordance with Section 36.2 of the Tariff.
Transmission Interconnection Feasibility Study means a study conducted by the Transmission Provider in accordance with Section 36.2 of the Tariff. Transmission Interconnection Request:

Examples of Transmission Interconnection Feasibility Study in a sentence

  • Either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • To be assigned a PJM Queue Position pursuant to Tariff, Part VI, Preamble, section 201, a Transmission Interconnection Customer must submit a complete and fully executed Transmission Interconnection Feasibility Study Agreement, a form of which is located in the Tariff, Attachment S.

  • The Interconnection Customer must submit a complete and fully executed Transmission Interconnection Feasibility Study Agreement (Tariff, Attachment S) to the Transmission Provider by March 10 for the New Services Queue ending March 31, and by September 10 for the New Services Queue ending September 30.

  • Pursuant to Section 36.2 or Section 205 of the PJM Tariff, Transmission Provider has completed a Generation or Transmission Interconnection Feasibility Study or an Initial Study (as applicable) and a System Impact Study and has provided the results of those studies to New Service Customer.

  • Pursuant to Tariff, Attachment S, section 9, Cost Responsibility, of the Transmission Interconnection Feasibility Study Agreement, if the Transmission Provider anticipates that the actual study costs will exceed the refundable portion of the required deposit, the Transmission Provider shall provide the Interconnection Customer with an estimate of the additional study costs.

  • Pursuant to Section 9, Cost Responsibility, of the Transmission Interconnection Feasibility Study Agreement (Tariff, Attachment S), if the Transmission Provider anticipates that the actual study costs will exceed the refundable portion of the required deposit, the Transmission Provider shall provide the Interconnection Customer with an estimate of the additional study costs.

  • To be assigned a PJM Queue Position pursuant to Section 201, a Transmission Interconnection Customer must submit a complete and fully executed Transmission Interconnection Feasibility Study Agreement, a form of which is located in the Tariff, Attachment S.

  • This Transmission Interconnection Feasibility Study Agreement, dated as of, is entered into, by and between (“Interconnection Customer”) and PJM Interconnection, L.L.C. (“Transmission Provider”) pursuant to Part IV of the PJM Interconnection, L.L.C. Open Access Transmission Tariff (“PJM Tariff”).

  • In the event that the Transmission Provider is unable to complete the Transmission Interconnection Feasibility Study within the time period set forth in Tariff Section 36.2, the Transmission Provider shall notify the Interconnection Customer and explain the reasons for the delay.

  • Pursuant to section 9, Cost Responsibility, of the Transmission Interconnection Feasibility Study Agreement (Tariff, Attachment S), if the Transmission Provider anticipates that the actual study costs will exceed the refundable portion of the required deposit, the Transmission Provider shall provide the Interconnection Customer with an estimate of the additional study costs.

Related to Transmission Interconnection Feasibility Study

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Transmission Interconnection Customer means an entity that submits an Interconnection Request to interconnect or add Merchant Transmission Facilities to the Transmission System or to increase the capacity of Merchant Transmission Facilities interconnected with the Transmission System in the PJM Region or an entity that submits an Upgrade Request for Merchant Network Upgrades (including accelerating the construction of any transmission enhancement or expansion, other than Merchant Transmission Facilities, that is included in the Regional Transmission Expansion Plan prepared pursuant to Operating Agreement, Schedule 6).

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • Generation Interconnection Customer means an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region. Generation Interconnection Request:

  • Generation Interconnection Request means a request by a Generation Interconnection Customer pursuant to Tariff, Part IV, subpart A, to interconnect a generating unit with the Transmission System or to increase the capacity of a generating unit interconnected with the Transmission System in the PJM Region.

  • Transmission Owner Interconnection Facilities means all Interconnection Facilities that are not Customer Interconnection Facilities and that, after the transfer under Tariff, Attachment P, Appendix 2, section 5.5 to the Interconnected Transmission Owner of title to any Transmission Owner Interconnection Facilities that the Interconnection Customer constructed, are owned, controlled, operated and maintained by the Interconnected Transmission Owner on the Interconnected Transmission Owner’s side of the Point of Interconnection identified in appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System or interconnected distribution facilities. Transmission Provider: The “Transmission Provider” shall be the Office of the Interconnection for all purposes, provided that the Transmission Owners will have the responsibility for the following specified activities:

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Generation Interconnection Agreement means the generation interconnection agreement to be entered into separately between Seller and PGE, providing for the construction, operation, and maintenance of interconnection facilities required to accommodate deliveries of Seller's Net Output.

  • Interconnection is As Defined in the Act.

  • Interconnection Customer means a Generation Interconnection Customer and/or a Transmission Interconnection Customer.

  • Interconnection Provider means PacifiCorp Transmission.

  • Interregional Transmission Project means transmission facilities that would be located within two or more neighboring transmission planning regions and are determined by each of those regions to be a more efficient or cost effective solution to regional transmission needs.

  • Interconnection Facilities means the Transmission Owner Interconnection Facilities and the Customer Interconnection Facilities.

  • Large Facility Interconnection Procedures or “LFIP”) shall mean the interconnection procedures applicable to an Interconnection Request pertaining to a Large Generating Facility that are included in Attachment X of the NYISO OATT. Standard Large Generator Interconnection Agreement (“LGIA”) shall mean this Agreement, the form of interconnection agreement applicable to an Interconnection Request pertaining to a Large Generating Facility, that is included in Attachment X of the NYISO OATT. System Deliverability Upgrades shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to Byways and Highways and Other Interfaces on the existing New York State Transmission System and Distribution System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard at the requested level of Capacity Resource Interconnection Service. System Protection Facilities shall mean the equipment, including necessary protection signal communications equipment, required to (1) protect the New York State Transmission System from faults or other electrical disturbances occurring at the Large Generating Facility and (2) protect the Large Generating Facility from faults or other electrical system disturbances occurring on the New York State Transmission System or on other delivery systems or other generating systems to which the New York State Transmission System is directly connected. System Upgrade Facilities shall mean the least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff shall mean the NYISO Open Access Transmission Tariff (“OATT”), as filed with the Commission, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Developer is engaged in on-site test operations and commissioning of the Large Generating Facility prior to Commercial Operation.

  • Interconnection Service means the physical and electrical interconnection of the Customer Facility with the Transmission System pursuant to the terms of Tariff, Part IV and Tariff, Part VI and the Interconnection Service Agreement entered into pursuant thereto by Interconnection Customer, the Interconnected Transmission Owner and Transmission Provider. Interconnection Service Agreement:

  • Merchant Transmission Facilities means A.C. or D.C. transmission facilities that are interconnected with or added to the Transmission System pursuant to Tariff, Part IV and Tariff, Part VI and that are so identified in Tariff, Attachment T, provided, however, that Merchant Transmission Facilities shall not include (i) any Customer Interconnection Facilities, (ii) any physical facilities of the Transmission System that were in existence on or before March 20, 2003 ; (iii) any expansions or enhancements of the Transmission System that are not identified as Merchant Transmission Facilities in the Regional Transmission Expansion Plan and Tariff, Attachment T, or (iv) any transmission facilities that are included in the rate base of a public utility and on which a regulated return is earned. Merchant Transmission Provider:

  • Interconnected Transmission Owner means the Transmission Owner to whose transmission facilities or distribution facilities Customer Interconnection Facilities are, or as the case may be, a Customer Facility is, being directly connected. When used in an Interconnection Construction Service Agreement, the term may refer to a Transmission Owner whose facilities must be upgraded pursuant to the Facilities Study, but whose facilities are not directly interconnected with those of the Interconnection Customer.

  • Interconnection Service Agreement means an agreement among the Transmission Provider, an Interconnection Customer and an Interconnected Transmission Owner regarding interconnection under Tariff, Part IV and Tariff, Part VI.

  • Customer Interconnection Facilities means all facilities and equipment owned and/or controlled, operated and maintained by Interconnection Customer on Interconnection Customer’s side of the Point of Interconnection identified in the appropriate appendices to the Interconnection Service Agreement and to the Interconnection Construction Service Agreement, including any modifications, additions, or upgrades made to such facilities and equipment, that are necessary to physically and electrically interconnect the Customer Facility with the Transmission System.

  • Transmission Facilities shall have the meaning set forth in the Operating Agreement. Transmission Injection Rights:

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Interconnection Activation Date means the date that the construction of the joint facility Interconnection arrangement has been completed, trunk groups have been established, joint trunk testing is completed and trunks have been mutually accepted by the Parties.

  • Transmission Facility means a facility for transmitting electricity, and includes any structures, equipment or other facilities used for that purpose as defined in the Parties respective XXXXx.