Thames Tideway Tunnel Project definition

Thames Tideway Tunnel Project means the specified infrastructure project described in schedule 1 to the Thames Tideway Tunnel Project Specification Notice; and
Thames Tideway Tunnel Project means the project specified in the Project Specification Notice.” an "unmeasured supply" is one where none of the charges for that supply is based on measured quantities of volume;
Thames Tideway Tunnel Project means the infrastructure project which has been specified under regulation 4(1) of the SIP Regulations in the Thames Tideway Tunnel Project Specification Notice; and

Examples of Thames Tideway Tunnel Project in a sentence

  • The Principal has become a party to a shareholders' direct agreement dated 2015 (the "Agreement") in relation to the Government Support Package for the Thames Tideway Tunnel Project and is obliged, pursuant to clause 19.3 of the Agreement, to deliver to the Secretary of State for Environment, Food and Rural Affairs (the "Secretary of State") a power of attorney in the form of this Deed.

  • The Principal has become a party to a discontinuation agreement dated 2015 (the "Agreement") in relation to the Government Support Package for the Thames Tideway Tunnel Project and is obliged, pursuant to clause 6.5 of the Agreement, to deliver to the Secretary of State for Environment, Food and Rural Affairs (the "Secretary of State") a power of attorney in the form of this Deed.

  • Governors suggested that there could perhaps be ways in which the Thames Tideway Tunnel Project could be embraced as a learning opportunity for students.

  • The Steering Board acknowledges the need for the provision of adequate security and commits itself to provide the necessary staffing and funding to carry out the tasks set out above.

  • The role of the Board of Bazalgette Tunnel Limited (the “Company”) is to govern the Company and hence the Thames Tideway Tunnel Project (the “Project”), such that the Company delivers on its objectives, including the successful delivery of the Project.

  • The Thames Tideway Tunnel Project (The Project) is authorised under Thames Water Utilities Limited Development Consent Order 2014 (DCO).

  • Save as is specifically set out in this Notice, the Incumbent Undertaker must not undertake the Thames Tideway Tunnel Project.

  • Signed Parliamentary Under Secretary of State for Natural Environment and Science on behalf of the Secretary of State for Environment, Food and Rural Affairs 4 June 2014Schedule 1‌‌ Preparatory work permitted or required to be undertaken by the Incumbent Undertaker in relation to the Thames Tideway Tunnel Project Interpretation1.—Defined terms are set out in paragraph 15.

  • This policy applies to Bazalgette Tunnel Limited, CH2M1 (“Tideway”) and anyone working on the Thames Tideway Tunnel Project (“The Project”).

  • Note that a further update report will be provided in November on the Thames Tideway Tunnel Project which will contain a draft response to the second consultation, which is due to start in September.


More Definitions of Thames Tideway Tunnel Project

Thames Tideway Tunnel Project means the infrastructure project described in Schedule 1 to this Notice; and
Thames Tideway Tunnel Project means the project specified in the Project Specification Notice.”

Related to Thames Tideway Tunnel Project

  • Green building strategies means those strategies that minimize the impact of development on the environment, and enhance the health, safety and well-being of residents by producing durable, low-maintenance, resource-efficient housing while making optimum use of existing infrastructure and community services.

  • Ultra Low Sulfur Diesel Fuel means diesel fuel that has a sulfur content of no more than fifteen parts per

  • Uppermost aquifer means the geologic formation nearest the natural ground surface that is an aquifer, as well as lower aquifers that are hydraulically interconnected with this aquifer within the facility's property boundary.

  • Bulk gasoline plant means a gasoline storage and distribution facility with an average daily throughput of 20,000 gallons (76,000 liters) of gasoline or less on a 30-day rolling average.

  • The Works/Project means the works to be executed or done under this contract.

  • Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.

  • Suction outlet means the opening or fitting through which the water under negative pressure is drawn from the pool or spa.

  • Tourism destination project means a qualified non-gaming

  • Train Loading Infrastructure means conveyors, stockpile areas, blending and screening facilities, stackers, re‑claimers and other infrastructure reasonably required for the loading of iron ore, freight goods or other products onto the relevant Railway for transport (directly or indirectly) to a loading port; and

  • Cannabis processing facility means a person that:

  • Temporary clean coal technology demonstration project means a clean coal technology demonstration project that is operated for a period of five years or less and that complies with the SIP and other requirements necessary to attain and maintain the national ambient air quality standards during the project and after the project is terminated.

  • Dry cleaning facility means an establishment with one or more dry cleaning systems.

  • licensed water supplier means a company which is the holder for the time being of a water supply licence under Section 17A(1) of the 1991 Act(f);

  • Train Unloading Infrastructure means train unloading infrastructure reasonably required for the unloading of iron ore from the Railway to be processed, or blended with other iron ore, at processing or blending facilities in the vicinity of that train unloading infrastructure and with the resulting iron ore products then loaded on to the Railway for transport (directly or indirectly) to a loading port. Company to obtain prior Ministerial in-principle approval

  • business vertical means a distinguishable component of an enterprise that is engaged in the supply of individual goods or services or a group of related goods or services which is subject to risks and returns that are different from those of the other business verticals.

  • Transboundary movement means any movement of hazardous wastes or other wastes from an area under the national jurisdiction of one State to or through an area under the national jurisdiction of another State or to or through an area not under the national jurisdiction of any State, provided at least two States are involved in the movement;

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Cannabis testing facility means an entity registered by

  • Diatomaceous earth filtration means a process resulting in substantial particulate removal in which a precoat cake of diatomaceous earth filter media is deposited on a support membrane (septum), and while the water is filtered by passing through the cake on the septum, additional filter media known as body feed is continuously added to the feed water to maintain the permeability of the filter cake.

  • Cold Weather Alert means the notice that PJM provides to PJM Members, Transmission Owners, resource owners and operators, customers, and regulators to prepare personnel and facilities for expected extreme cold weather conditions.

  • Micro wireless facility means a small cell facility that is not larger in dimension than 24 inches in length, 15 inches in width, and 12 inches in height and that has an exterior antenna, if any, not longer than 11 inches.

  • Moving beam radiation therapy means radiation therapy with any planned displacement of radiation field or patient relative to each other, or with any planned change of absorbed dose distribution. It includes arc, skip, conformal, intensity modulation and rotational therapy.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Radiation therapy simulation system means a radiographic or fluoroscopic x-ray system intended for localizing the volume to be exposed during radiation therapy and confirming the position and size of the therapeutic irradiation field.

  • Rechargeable Electrical Energy Storage System (REESS) means the rechargeable energy storage system that provides electric energy for electrical propulsion.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.