Task II definition

Task II means Task II as defined by ICCAT in the ‘Field manual for statistics and sampling Atlantic tunas and tuna- like fish’ (third edition, ICCAT, 1990).
Task II means Task II as defined by the International Commission for the Conservation of the Atlantic Tunas (ICCAT) in the “Field manual for statistics and sampling Atlantic tunas and tuna-like fish” (Third edition, ICCAT, 1990).
Task II. Develop new runcuts incorporating operator breaks designed to reduce the length of splits that meet the following criteria for establishing coach operator assignments:

Examples of Task II in a sentence

  • Task II: Aquatic Resources Delineation Under the authorities of Section 404 of the Clean Water Act of 1972 (CWA), the U.S. Army Corps of Engineers (USACE) and U.S. Environmental Protection Agency regulate waters of the U.S. (WOTUS) that include, but are not limited to, wetlands, streams, rivers, and impoundments.

  • In this area, the study should encompass the following tasks only: Task II: Review and Background Documentation Relating to Existing Conditions, Task III: Inventory of Current Parking Capacity, Task IV: Assessment of Current Parking System Utilization, Task V: Supply/Demand Analysis and Projection of Future Parking Needs, Task VI: Development of Supply Side Solutions, and Task X: Recommendations and Financial Plan for Meeting Future Parking Needs.

  • Task II: Aquatic Resource Delineation Under the authorities of Section 404 of the Clean Water Act of 1972 (CWA), the U.S. Army Corps of Engineers (USACE) and U.S. Environmental Protection Agency regulate waters of the U.S. (WOTUS) that include, but are not limited to, wetlands, streams, rivers, and impoundments.

  • Expand report prepared for each CFD under Task II to include a section addressing the subsidy.

  • The Consulting Engineer hereby agrees to complete preliminary plans suitable for a public information meeting including easement and right-of-way descriptions and drawings (Task I) by January 28, 2011 and to complete all work necessary to and including preparation of final plans (Task II) by April 6, 2011.

  • The Consulting Engineer hereby agrees to complete preliminary plans suitable for a public information meeting including easement and right-of-way descriptions and drawings (Task I) by September 7, 2012, and to complete all work necessary to and including preparation of final plans (Task II) by January 10, 2013.

  • Completion time: The Consulting Engineer hereby agrees to complete preliminary plans suitable for a public information meeting including easement and right-of-way descriptions and drawings (Task I) by December 31, 2014 and to complete all work necessary to and including preparation of final plans (Task II) by October 31, 2015.

  • A cost estimate by task is provided as follows: Task I – Final Design $29,083.28 Task II – Design Submissions $28,127.60 Task III – Project Letting Support $ 4,429.20 TOTAL CONTRACT $61,640.08 COMPLETION TIME The Consulting Engineer hereby agrees to complete the project in accordance with the following schedule: 50% Plan Submission no later than December 12, 2005.

  • Upon completion and review of the functional and Architectural program and master site planning, no further work shall be done unless and until the DISTRICT has approved Task I as complete and has given a written Notice of proceed to ARCHITECT for Task II.

  • Task II projects funded through the last cooperative agreement were approximately 14% of the total dollars received.

Related to Task II

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • Project Management Plan means the management plan that (i) sets out a high level workplan to describe the manner in which the Design-Builder will manage the Project, including to address related matters such as traffic management and communications, and (ii) is prepared by or for the Design-Builder and submitted to the Owner;

  • Site Host Load means the electric energy produced by or associated with the Facility that serves electrical loads (that are not Station Use) of Seller or one or more third parties conducted pursuant to California Public Utilities Code Section 218(b).

  • Development Program means the implementation of the development plan.

  • Scope of Work means the description of Services and Deliverables specified in the Contract and as may be amended.

  • Contractor Project Manager means the employee identified in a Statement of Work as the Contractor project manager.

  • Task Order means a separate order issued under this Contract.

  • Task means the amount of work to be done by one individual worker or a gang in order to earn one day’s wage.

  • site development plan means a dimensioned plan drawn to scale that indicates details of the proposed land development, including the site layout, positioning of buildings and structures, property access, building designs and landscaping;

  • Programme of work means the Programme of work submitted by the contractor and approved by the Engineer-in-charge and includes and amendment thereto made from time to time and approved by the Engineer-in-charge;

  • Completion of work means completion of the entire contracted work. Exhaustion of quantity of any particular item mentioned in the bid document shall not imply completion of work or any component thereof.

  • Municipal Separate Storm Sewer System Management Program means a management program covering the duration of a state permit for a municipal separate storm sewer system that includes a comprehensive planning process that involves public participation and intergovernmental coordination, to reduce the discharge of pollutants to the maximum extent practicable, to protect water quality, and to satisfy the appropriate water quality requirements of the CWA and regulations, and this article and its attendant regulations, using management practices, control techniques, and system, design, and engineering methods, and such other provisions that are appropriate.

  • Design Services means architect services, engineer services or landscape architect services.

  • Key Project Personnel means the persons named in Schedule I (Key Project Personnel) and any replacement(s) approved by the City in accordance with ARTICLE 7;

  • Type of Work means (insert the type of work you expect to supply the Agency Worker into);

  • municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Project Scope means the description or activity of work to be accomplished on the Project.

  • Master subcontracting plan means a subcontracting plan that contains all the required elements of an individual subcontracting plan, except goals, and may be incorporated into individual subcontracting plans, provided the master subcontracting plan has been approved.

  • Commercial Development Plan means the written commercialization plan attached as Appendix E.

  • Development Work means the conduct of preclinical and clinical trials, the compilation of the regulatory dossier concerning Licensed Products and the conduct of other work necessary or useful for obtaining Regulatory Approval of Licensed Products.

  • PACE program means a program implemented by a municipality to stimulate energy efficiency and renewable energy projects in conformity with Act 270.

  • Development Plans has the meaning set forth in Section 3.2.

  • Cluster development means a contiguous cluster or

  • Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Construction Service Agreement means either an Interconnection Construction Service Agreement or an Upgrade Construction Service Agreement.