Storage Contract Capacity definition

Storage Contract Capacity means the actual total installed nameplate AC Capacity of the Storage Facility as determined by the then-current Storage Contract Capacity Test, as the same may be adjusted from time to time pursuant to Section 7.6(a)(iv).
Storage Contract Capacity or “Contract Capacity” means the total capacity (in MW) of the Facility initially equal to the amount set forth on the Cover Sheet, as the same may be adjusted from time to time pursuant to Section 5(a) of Exhibit B or Section 4.6 and Exhibit M to reflect the results of the most recently performed Storage Capacity Test.
Storage Contract Capacity means the total capacity (in MW) of the Storage Facility initially equal to the amount set forth on the Cover Sheet, as the same may be adjusted from time to time to reflect the results of the most recently performed Storage Capacity Test. ] 17

Examples of Storage Contract Capacity in a sentence

  • Seller shall use commercially reasonable efforts to cause the Storage Contract Capacity to be equal to or exceed the Guaranteed Storage Contract Capacity by no later than the Commercial Operation Date.

  • Technical cooperation Photo: The Donors Workshop held at the EBRD, December 2002.

  • During the Delivery Term, Seller shall maintain the Storage Facility with a Storage Contract Capacity of not less than the [•] MWAC (the “Guaranteed Storage Contract Capacity”).

  • Seller will promptly provide written notice to Buyer of any Loss Event, specifying in reasonable detail its cause, any Storage Contract Capacity affected thereby, the steps Seller plans to take to repair and restore the Project and the time required to complete such repair and restoration.

  • Id. at 319.Further, in assessing the evidence presented by the parties, and conducting any factual or legal inquiries necessary, the Third Circuit counseled that the district court should not be afraid to engage in an analysis that may overlap with the merits of the case.

  • The Parties acknowledge and agree that it is difficult or impossible to determine with precision the amount of damages that would or might be incurred by Xxxxx as a result of Seller’s failure to achieve Commercial Operation on or before the Guaranteed Commercial Operation Date or to achieve (A) a Contract Capacity equal to at least ninety- five percent (95%) of the Expected Capacity and/or (B) a Storage Contract Capacity equal to at least ninety-five percent (95%) of the Storage Expected Capacity.

  • Buyer shall have the right to require a retest of the Storage Contract Capacity Test in accordance with Appendix B.

  • Payment of Guaranteed Storage Contract Capacity LDs is Seller’s sole and exclusive liability, and Buyer’s sole and exclusive remedy, in connection with the Storage Contract Capacity being less than the Guaranteed Storage Contract Capacity for a Contract Year.

  • Both of these represent modified constraints, where the extra generation reserve or schedule slack represent tunable parameters, which may be written tXCFA(St|θ) = arg maxC(St, x), (48)tx∈X π (θ) twhere X π (θ) might be the modified linear constraints Atx = bt + Dtθ, (49)x ≥ 0.Here, θ is a vector of tunable parameters and D is an appropriate scaling matrix.

  • Seller may not modify Project’s design as set forth in Exhibit A unless such modification could not reasonably be expected to (x) have a material and adverse effect on either Party’s ability to perform its obligations under this Agreement; (y) materially move the Project’s location or the Interconnection Point; or (z) materially affect the Storage Contract Capacity, the charging rate, the Round- Trip Efficiency or the Duration of the Storage Facility during each Contract Year.


More Definitions of Storage Contract Capacity

Storage Contract Capacity. [XX] MWAC at [ ] hour discharge Guaranteed Storage Availability: [XX%] [percentage of hours each month that the Storage Facility will be available] Guaranteed Efficiency Rate: [XX]% Minimum Efficiency Rate: [XX]% Contract Price: The Contract Price shall be as follows: For any Showing Month in which Seller provided the Storage Product, the Contract Price shall be $[XX]/kW-month; and For any Showing Month in which (a) Seller provided the Storage (No FCDS) Product, or (b) Seller had intended to deliver “Storage Product” but the Storage Facility was not eligible for Full Capacity Deliverability Status, the Contract Price shall be $[XX]/kW-month. Product:
Storage Contract Capacity means the total capacity (in MW) of the Storage Facility determined in accordance with Section 4.9 and Exhibit O, as the same may be adjusted from time to time pursuant to Section 4.9 and Exhibit O.
Storage Contract Capacity. The Storage Facility will have an initial Storage Capacity of [[XX] MW for two (2) hour discharge] and [[XX] MW for four (4) hour discharge] (the “Storage Contract Capacity”).

Related to Storage Contract Capacity

  • Contract Capacity has the meaning set forth in Section 3.1(f).

  • Storage Capacity means any combination of space, injectability and deliverability.

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Excess Capacity means volume or capacity in a duct, conduit, or support structure other than a utility pole or anchor which can be used, pursuant to the orders and regulations of the Commission, for a pole attachment.

  • System Capacity means the operational capacity of the System at any applicable point in time.

  • Idle capacity means the unused capacity of partially used facilities. It is the difference between: (a) that which a facility could achieve under 100 percent operating time on a one-shift basis less operating interruptions resulting from time lost for repairs, setups, unsatisfactory materials, and other normal delays; and (b) the extent to which the facility was actually used to meet demands during the accounting period. A multi-shift basis should be used if it can be shown that this amount of usage would normally be expected for the type of facility involved.

  • RA Capacity means the maximum megawatt amount that the CAISO recognizes from a Project that qualifies for Buyer’s Resource Adequacy Requirements and is associated with the Project’s Capacity Attributes.

  • Interruptible Capacity means capacity that may be interrupted by the Operator at any time in order to fulfil shippers’ nominations under a firm capacity reservation.

  • Contracted Capacity means the capacity (in MW AC) contracted with MSEDCL for supply by the successful bidder at the Delivery Point from the Solar Power Project.

  • Nameplate capacity means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the United States Department of Energy standards.

  • Installed Capacity or 'IC’ means the summation of the name plate capacities of all the units of the generating station or the capacity of the generating station (reckoned at the generator terminals), approved by the Commission from time to time;

  • Base Capacity Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(b).

  • Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement. Generation Interconnection Customer:

  • Design capacity means the volume of a containment feature at a discharging facility that accommodates all permitted flows and meets all Aquifer Protection Permit conditions, including allowances for appropriate peaking and safety factors to ensure sustained, reliable operation.

  • Maximum Capacity or ‘Pmax’ means the maximum continuous active power which a power-generating module can produce, less any demand associated solely with facilitating the operation of that power-generating module and not fed into the network as specified in the connection agreement or as agreed between the relevant system operator and the power-generating facility owner;

  • New Capacity means a new Generator, a substantial addition to the capacity of an existing Generator, or the reactivation of all or a portion of a Generator that has been out of service for five years or more that commences commercial service after the effective date of this definition. For purposes of Section 23.4.5 of this Attachment H, “Offer Floor” for a Mitigated Capacity Zone Installed Capacity Supplier that is not a Special Case Resource shall mean the lesser of (i) a numerical value equal to 75% of the Mitigation Net CONE translated into a seasonally adjusted monthly UCAP value (“Mitigation Net CONE Offer Floor”), or (ii) the numerical value that is the first year value of the Unit Net CONE determined as specified in Section 23.4.5.7, translated into a seasonally adjusted monthly UCAP value using an appropriate class outage rate, (“Unit Net CONE Offer Floor”). The Offer Floor for a Mitigated Capacity Zone Installed Capacity Supplier that is a Special Case Resource shall mean a numerical value determined as specified in Section 23.4.5.7.5. The Offer Floor for Additional CRIS MW shall mean a numerical value determined as specified in Section 23.4.5.7.6. For the purposes of Section 23.4.5 of this Attachment H, “Non-Qualifying Entry Sponsors” shall mean a Transmission Owner, Public Power Entity, or any other entity with a Transmission District in the NYCA, or an agency or instrumentality of New York State or a political subdivision thereof.

  • Reserved Capacity means the maximum amount of capacity and energy that the Transmission Provider agrees to transmit for the Transmission Customer over the Transmission Provider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery under Tariff, Part II. Reserved Capacity shall be expressed in terms of whole megawatts on a sixty (60) minute interval (commencing on the clock hour) basis.

  • Base Capacity Resource Price Decrement means, for the 2018/2019 and 2019/2020 Delivery Years, a difference between the clearing price for Base Capacity Resources and the clearing price for Capacity Performance Resources, representing the cost to procure additional Capacity Performance Resources out of merit order when the Base Capacity Resource Constraint is binding.

  • Committed Capacity means that portion of the Capacity that is required to meet the Capacity Entitlements of Access Holders;

  • Rated Capacity means the Average Daily Flow for which the Works are approved to handle;

  • Available Capacity means the capacity from the Project, expressed in whole megawatts, that is available to generate Product. [For As-Available Product facilities only]

  • Unforced Capacity shall have the meaning specified in the Reliability Assurance Agreement.

  • Licensed capacity means the number of children the Department has determined the day care home can care for at any one time in addition to any children living in the home who are under the age of 12 years. Children age 12 and over on the premises are not considered in determining licensed capacity.

  • Load means energy consumed by Customers together with allocated losses and unaccounted for energy;

  • Nominal Capacity means the volume indicated by the manufacturer that represents the maximum recommended filling level.