Storage Capacity Demonstration Test definition

Storage Capacity Demonstration Test means a test of the Storage Facility to demonstrate the maximum Storage Available Capacity based on Energy output, as measured at the Electric Interconnection Point, conducted in accordance with Accepted Industry Practices and the terms and conditions of this Agreement, including Section 3.12 and the procedures set forth in Schedule 3.12.

Examples of Storage Capacity Demonstration Test in a sentence

  • The final results of the then most recent Capacity Demonstration Test or Storage Capacity Demonstration Test that was performed in circumstances required by this Section 3.12 shall be used for purposes of determining satisfaction of the conditions to Commercial Operation.

  • If Seller causes a Capacity Demonstration Test or Storage Capacity Demonstration Test to be conducted according to this Section 3.12 and thereafter the Commercial Operation Date occurs more than thirty (30) Days after the Capacity Demonstration Test or the Storage Capacity Demonstration Test, Seller shall cause a new Capacity Demonstration Test or Storage Capacity Demonstration Test, as the case may be, to be conducted in accordance with this Section 3.12.

  • If Seller causes a Net Generation Capacity Calculation or Storage Capacity Demonstration Test to be conducted according to this Section 3.12 and thereafter the Commercial Operation Date occurs more than thirty (30) Days after the Net Generation Capacity Calculation or Storage Capacity Demonstration Test, Seller shall cause a new Net Generation Capacity Calculation or Storage Capacity Demonstration Test, as the case may be, to be conducted in accordance with this Section 3.12.

  • The final results of the then most recent Net Generation Capacity Calculation or Storage Capacity Demonstration Test that was performed in circumstances required by this Section 3.12 shall be used for purposes of determining satisfaction of the conditions to Commercial Operation.

  • The final results of the then most recent Net Generation Capacity Calculation or Storage Capacity Demonstration Test that was performed in circumstances required by this Section 3.12 shall be used for purposes of determining satisfaction of the conditions [to Commercial Operation]122 [in Section 2.3(b)]123.

  • If Seller causes a Capacity Demonstration Test or Storage Capacity Demonstration Test to be conducted according to this Section 3.12 and thereafter the Commercial Operation Date occurs more than thirty (30) Days after the Capacity Demonstration Test or Storage Capacity Demonstration Test, Seller shall cause a new Capacity Demonstration Test or Storage Capacity Demonstration Test, as the case may be, to be conducted in accordance with this Section 3.12.

Related to Storage Capacity Demonstration Test

  • Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement. Generation Interconnection Customer:

  • Storage Capacity means any combination of space, injectability and deliverability.

  • Potential electrical output capacity means, with regard to a unit, 33 per- cent of the maximum design heat input of the unit.

  • Nameplate Capacity Rating means the maximum capacity of the Facility as stated by the manufacturer, expressed in kW, which shall not exceed 10,000 kW.

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Contract Capacity has the meaning set forth in Section 3.1(f).

  • Start-Up Testing means the completion of applicable required factory and start-up tests as set forth in Exhibit C.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Penetration Testing means security testing in which assessors mimic real-world attacks to identify methods for circumventing the security features of an application, system, or network. (NIST SP 800-115)

  • Interruptible Capacity means capacity that may be interrupted by the Operator at any time in order to fulfil shippers’ nominations under a firm capacity reservation.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Daily Unforced Capacity Obligation means the capacity obligation of a Load Serving Entity during the Delivery Year, determined in accordance with Reliability Assurance Agreement, Schedule 8, or, as to an FRR entity, in Reliability Assurance Agreement, Schedule 8.1. Day-ahead Congestion Price: “Day-ahead Congestion Price” shall mean the Congestion Price resulting from the Day-ahead Energy Market. Day-ahead Energy Market: