Examples of State Location in a sentence
Time period(s) will not apply where Contractor does not have access to a physical State Location and where access to the State Location is necessary for problem identification and resolution.
State Location - any physical location where the State performs work.
State Location may include state- owned, leased, or rented space.
Where there is no obvious or suspected damage, all deliveries to a State Location must be opened by the State and the contents inspected for possible internal damage not visible externally within 14 days of receipt.
The quantity of packages delivered must be recorded and any obvious visible or suspected damage must be noted at time of delivery using the shipper’s delivery document(s) and appropriate procedures to record the damage.Where there is no obvious or suspected damage, all deliveries to a State Location must be opened by the State and the contents inspected for possible internal damage not visible externally within 14 days of receipt.
The quantity of packages delivered shall be recorded and any obvious visible or suspected damage shall be noted at time of delivery using the shipper’s delivery document(s) and appropriate procedures to record such.Where there is no obvious or suspected damage, all deliveries to a State Location must be opened by the State and the contents inspected for possible internal damage not visible externally within fourteen (14) days of receipt.
County and State staff have been provided instructions and training on reviewing cases for federal data reporting purposes.
If a Deliverable includes installation at a State Location, then Contractor must (1) perform any applicable testing, (2) correct all material deficiencies discovered during the quality assurance activities and testing, and (3) inform the State that the Deliverable is in a suitable state of readiness for the State’s review and approval.
However, they must be reviewed and approved by the VDOT State Location and Design Engineer for projects off the National Highway System, and also by FHWA for projects on the National Highway System.
The final determination of need for a Location Public Hearing is made by the State Location and Design Engineer upon careful evaluation of public interest and the concurrence of FHWA on Federal-aid projects.