State Construction Code means the State Construction Code adopted by:
State Construction Code means the rules promulgated by the state construction code commission under section 4 of the Stille-DeRossett-Hale single state construction code act, MCL 125.1504, R 408.30101 to R 408.31194 of the Michigan administrative code, including each part of that code that is of limited application, and any modification of or amendment to those rules.
State Construction Code means the code, as that term is defined in section 2a of the Stille-DeRossett-Hale single state construction code act, 1972 PA 230, MCL 125.1502a.

Examples of State Construction Code in a sentence

  • If the Contractor observes that any Contract Document conflicts with any Laws or the State Construction Code or any permits in any respect, the Contractor must promptly notify the Professional in writing.

  • All Works must be provided in accordance with the State Construction Code Act, 1972 PA 230, as amended, MCL 125.1501 et seg,, International Building and Residential Codes and all applicable Michigan construction codes and fire safety including but not limited to: Michigan Building Code, Michigan Residential Code, Michigan Uniform Energy Code, Michigan Electrical Code, Michigan Rehabilitation Code for Existing Buildings, Michigan Mechanical Code, Michigan Elevator Code and Michigan Plumbing Code.

  • Construct this Leased premise in accordance with all Federal, State and Local Building Codes pursuant to the State Construction Code Act, BFD, MIOSHA, Life Safety Codes, “Michigan Energy Code,” and provisions for Public Law 93-112, Section 504.

  • Except as provided in Subsections (6), (7), (9), and (10), or as expressly provided in state law, a state executive branch entity or political subdivision of the state may not, after December 1, 2016, adopt or enforce a rule, ordinance, or requirement that applies to a subject specifically addressed by, and that is more restrictive than, the State Construction Code.

  • Adoption of State Construction Code -- Amendments by commission-- Approved codes -- Exemptions.

  • Construction and setup of a modular unit shall be in accordance with the State Construction Code.

  • Upon request by a person seeking a single-family residential building permit, a chief executive officer of the municipality or county issuing the single-family residential building permit, or the chief executive officer's designee, shall, with reasonable diligence, review an inspection described in Subsection (2) to determine whether the inspection constitutes a fair administration of the State Construction Code.

  • As used in this section, "International Residential Code" means the International Residential Code as adopted under the State Construction Code.

  • A certification by a professional engineer of applicable expertise licensed in Michigan that all construction features of the tower comply with the requirements of all agencies having jurisdiction and the State Construction Code.

  • A manufactured home setup in the state shall be installed in accordance with the provisions of the State Construction Code applicable to manufactured housing installation.


More Definitions of State Construction Code

State Construction Code means the same as that term is defined in Section 15A-1-102.
State Construction Code means the rules promulgated by the state construction code commission under section 4 of the state construction code act of 1972, Act No. 230 of the Public Acts of 1972, being section 125.1504 of the Michigan Compiled Laws.
State Construction Code means a construction code adopted by the Legislature in 712 accordance with Section 58-56-4.
State Construction Code means the code adopted under Section 2 of this bill.

Related to State Construction Code

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Original construction ’ shall mean the first or initial construction

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Commencement of Construction means the initial disturbance of soils associated with clearing, grading, or excavating activities or other construction activities.

  • Acquisition and Construction Fund means the fund so designated in, and created pursuant to, Section 502 hereof.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Means and Methods of Construction means the labor, materials, temporary structures, tools, plant, and construction equipment, and the manner and time of their use, necessary to accomplish the result intended by this Contract.

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • the Constitution means the Constitution of the Republic of South Africa, 1996;