Start construction means to issue a notice to proceed to a project’s contractor, mobilize equipment on the site, and physically commence construction/site work. It is the responsibility of the developer and contractor to ensure that all applicable local and State permits, Federal approvals, inspections, surveys and/or reports have been received before work has commenced. NJHMFA reserves the right to conduct a site inspection to ensure the timely start of construction.
Start construction means to issue a notice to proceed to a project’s contractor, mobilize equipment on the site, and physically commence construction/site work. It is the responsibility of the developer and contractor to ensure that all applicable local and State permits, Federal approvals, inspections,
Start construction. MEANS THE FIRST PLACEMENT OF PERMANENT CONSTRUCTION OF A STRUCTURE (OTHER THAN MOBILE HOME) ON A SITE, SUCH AS THE POURING OF SLABS OR FOOTINGS OR ANY WORK BEYOND THE STAGE OF EXCAVATION. PERMANENT CONSTRUCTION DOES NOT INCLUDE LAND PREPARATION, SUCH AS CLEARING, GRADING, AND FILLING, NOR DOES IT INCLUDE THE INSTALLATION OF STREETS AND/OR WALKWAYS; NOR DOES IT INCLUDE EXCAVATION FOR BASEMENT, FOOTINGS, PIERS OR FOUNDATIONS OR THE ERECTION OF TEMPORARY FORMS NOR DOES IT INCLUDE THE INSTALLATION ON THE PROPERTY OF ACCESSORY BUILDINGS, SUCH AS GARAGES OR SHEDS NOT OCCUPIED AS DWELLING UNITS OR NOT AS PART OF THE MAIN STRUCTURE. FOR A STRUCTURE) OTHER THAN A MOBILE HOME) WITHOUT A BASEMENT OR POURED FOOTINGS, THE START OF

Examples of Start construction in a sentence

  • Start construction equipment only when necessary in the mornings.

  • The Construction Manager’s Performance Bond and Labor and Materials Payment Bond(s) shall be equal to 100% of the amount of the Part B: Construction Services Agreement (contract) and 100% of the amount of any Advanced Construction Start construction amended into the Part A: Pre-Construction Services Agreement.

  • The CMAR contractor’s Performance Bond and Labor and Materials Payment Bond(s) shall be equal to 100% of the amount of the Part B: Construction Services Agreement (contract) and 100% of the amount of any Advanced Construction Start construction amended into the Part A: Pre- Construction Services Agreement.

  • Start construction works on the already approved projects like Athirappally, Kuttiady additional extension, Neriamangalam extension and others as well as the 14 micro hydel schemes under the Chinese collaboration, with a total installed capacity of nearly 400 MW.

  • Intrinsic and extrinsic motivation were believed to combine in a sort of hydraulic fashion.

  • The DQC Manager shall certify in writing that all Early Start construction work has been reviewed in accordance with the QMP and the design documents related to the Early Start construction work are in full compliance with the Design‐Build requirements.

  • Start construction of the first series of 2G plants.Plants are operational by 2015-16.

  • EstimatedConstruction Start construction start and Completioncompletion dates.

  • The DQC Manager shall certify that any Early Start construction work that is a prerequisite for later work whose design is not sufficiently advanced will not make later work non‐conforming to the Design‐Build requirements.

  • The overall project timeline includes the following milestones:• Finalize the Supplemental Environmental Impact Statement – late 2011• Obtain environmental and mining permit for modification and obtain financial close for equipment required for increase pelletizing capacity – 2012• Finish construction through taconite pellet plant and start taconite pellet production – 2013• Start construction of one DRI line and steel mill – 2013• Start steel production – 2015 1.4 Facility EmissionsTable 2.

Related to Start construction

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Original construction ’ shall mean the first or initial construction

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • Construction and demolition debris means and includes:

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Construction waste means solid waste which is produced or generated during construction, remodeling, or repair of pavements, houses, commercial buildings, and other structures. Construction wastes include, but are not limited to lumber, wire, sheetrock, broken brick, shingles, glass, pipes, concrete, paving materials, and metal and plastics if the metal or plastics are a part of the materials of construction or empty containers for such materials. Paints, coatings, solvents, asbestos, any liquid, compressed gases or semi-liquids and garbage are not construction wastes.

  • Construction means any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) which would result in a change in actual emissions.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • construction site means a workplace where construction work is being performed;

  • Construction sign means a sign which identifies the architect, engineers, contractors and other individuals or firms involved with the construction of a building, or announces the character of the building or enterprise, which is erected during the building construction period.

  • Construction Works means all works and things necessary to complete the Project in accordance with this Agreement;

  • GENERAL AND SPECIAL CONDITIONS OF CONTRACT means the instructions to Tenderer and General and special conditions of contract pertaining to the work for which above tenders have been called for.