Site Readiness definition

Site Readiness or readiness of site means physical availability of space for installation of Equipment. Installation & commissioning and operations of VSAT.
Site Readiness means readiness of SR offices, DC, NLDC and DR site with installation of required IT and Non-IT hardware, civil works, electricity, public health, networking, required software installations etc.
Site Readiness. Means the Site complies with all the requirements specified in Appendix 1- SOR including site design, permitting and construction works.

Examples of Site Readiness in a sentence

  • Appropriate signage to identify funded entity (see Form F: Respondent Site Readiness).

  • This would provide customers and stakeholders with transparent information so they can understand how each tariff is calculated and do so in a way that does not unnecessarily impact how network businesses can respond to changes in market conditions, technology and customer preferences.

  • Other parcels that are not in the Site Readiness Program shall use the Standard Environmental and Socio-Economic Review process.

  • Standard Environmental and Socio-Economic Review: Applicants for development of parcels that are not in the Site Readiness Program or whose projects were found not to conform to the pre-approved ERF & SERF shall complete the standard ERF & SERF (found in the Forms Section of the Development Package’s Guidance Document) and provide detailed information related to the scope and scale of the project and its environmental, utility, transportation, and community impacts.

  • Installation and Commissioning of SITs: 4 weeks from the date of Delivery and Site Readiness declared from the Remote college.

  • In 2016, a Memorandum of Agreement with the Division of Planning allowed QDC to prepare a unified ERF & SERF for pre-approval of parcels included in the Site Readiness Program.

  • Expedited Environmental and Socio-Economic Review: Parcels that have been pre-permitted through the Site Readiness Program also have a pre- approved ERF & SERF.

  • Figure 3-2: Responsibilities for Telecommunications and Site Readiness for RTUs The connection to the Real Time Network for a dispatch workstation requires the participant to provide the following:a.

  • Date of Site Readiness (especially for new branches) should be mentioned in the installation reports.

  • The 2011 inventory created in Phase 1 of this Regional Industrial Site Readiness Project provided a community- wide understanding of the supply of vacant large industrial lands, the time and investment needed to get land development ready, and the severity of development constraints.

Related to Site Readiness

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Pilot or "Payment in Lieu of Tax" shall mean any payment made to the Agency or an affected tax jurisdiction equal to all or a portion of the real property taxes or other taxes which would have been levied by or on behalf of an affected tax jurisdiction with respect to a project but for tax exemption obtained by reason of the involvement of the Agency in such project, but such term shall not include Agency fees.

  • Onsite means within the Prescribed Premises boundary.

  • Pit means a tract of land from which overburden has been or is being removed for the purpose of surface mining.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Training hour means at least 50 minutes of actual learning, including, but not limited to, time devoted to lecture, learning activities, small group activities, demonstrations, evaluations, and hands-on experience.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Contractor Equipment means all appliances and things of whatsoever nature (other than temporary works) required for execution and completion of works and remedying of any defects, therein. But does not include plant, materials or other things intended to form or forming part of the permanent works.

  • Testing means that element of inspection that determines the properties or elements, including functional operation of materials, equipment, or their components, by the application of established scientific principles and procedures.

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).

  • The Site, where applicable, means the designated project place(s) named in the bidding document.

  • Work Site means the site where the Work is being performed.

  • Bulk plant means a motor fuel storage and distribution facility that is not a terminal and from

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Busy Line Verification (BLV) means a service whereby an End User requests an operator to confirm the busy status of a line.

  • Loading means the quantity of a specific substance present per unit of surface area, such as the amount of lead in micrograms contained in the dust collected from a certain surface area divided by the surface area in square feet or square meters.

  • Training Site means xxxxx://xxx.xxx.xxx/training-certification.html.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Contractor System means the information and communications technology system used by the Contractor in performing the Services including the Software, the Contractor Equipment and related cabling (but excluding the Authority System).

  • Spacecraft (9) means active and passive satellites and space probes.

  • Quality Management System means a set of interrelated or interacting elements that organisations use to direct and control how quality policies are implemented and quality objectives are achieved;

  • FPSO means a floating production, storage and offloading system used by the offshore oil and gas industry for the production or processing of hydrocarbons and for storage of hydrocarbons. FSOs and FLNGs are included within this definition. The determination as to whether a particular property constitutes an FPSO shall be at the sole determination of the Underwriter.

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Site means the place or places where the permanent Works are to be carried out including workshops where the same is being prepared.

  • Construction Services means either of the following for construction-manager-at-risk, design-build and job-order-contracting project delivery methods: