Site Acceptance Tests definition

Site Acceptance Tests mean the collective reference to the performance and reliability demonstrations specified in the Exhibits to determine whether a site meets the Specifications and other requirements of this Contract.
Site Acceptance Tests means the tests set out in the Investment Grade Proposal (or otherwise reasonably required by the Authority) which are to be carried out by the Service Provider by the Installation Completion Date;

Examples of Site Acceptance Tests in a sentence

  • The Contractor and Owner each acting reasonably shall thereafter schedule such further Site Acceptance Tests and the Contractor acknowledges and agrees that it will make Commercially Reasonable Efforts to minimise revenue loss to the Owner.

  • If the Contractor wishes to conduct further Site Acceptance Tests pursuant to Section 12.5.1, the Contractor shall so notify the Owner (which Notice shall include a detailed schedule for the performance of such tests).

  • The Contractor shall perform further Site Acceptance Tests and continue the remedial work referred to in this Section 12.5 until each element of the Site Acceptance Test is satisfied in its entirety.

  • REVIEW This review shall pertain to all subsequent SAS sites and include: a) Review of the completion of Site Acceptance Tests for all contracted SAS sites.

  • REVIEW This review shall include: a) Review of the completion of Site Acceptance Tests for all contracted sites and deliveries.

  • This includes development of engineering Drawings and supporting calculations, data sheets, procurement documentation, inspections / testing / expediting reports and schedules for Factory and Site Acceptance Tests (FAT / SAT).

  • Site Acceptance Tests are scheduled with the intention to be performed within one week to avoid delay in the deliverance of the provisional acceptance test certificate.

  • Additional Performance Tests will be performed at Charterer’s request after the completion of the Site Acceptance Tests, in order to check the proper operation of the various pumping and regasification systems all together and in various combinations.

  • FINAL SMA SYSTEM ACCEPTANCE TEST REVIEW This review shall include: a) Review of the completion of Site Acceptance Tests for all contracted sites and deliveries.

  • Detailed Commissioning Period, scopes and procedures and the exact required duration covering Site Acceptance Tests shall be discussed and developed between the Owner and the Charterer.

Related to Site Acceptance Tests

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • technical specification means, with respect to any Software, the document setting forth the technical specifications for such Software and included in the Statement of Work.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Technical Specifications means the detailed requirements for the Work furnished by the Architect and set forth in Book 3 of the Contract Documents.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • TENDER SPECIFICATION means “Specific conditions, technical specifications, appendices, site information and drawing pertaining to the work in which the tenderers are required to submit their offer. Individual specification number will be assigned to each tender specification.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Phase 2 means the second implementation phase of this section, beginning June 1, 2022 and continuing thereafter.

  • Backflow prevention device means a safety device used to prevent pollution or contamination of the water supply due to the reverse flow of water from the irrigation system.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Phase I Clinical Study means, as to a particular Licensed Product, an initial clinical study in humans with the purpose of assessing the Licensed Product’s safety, tolerability, toxicity, pharmacokinetics or other pharmacological properties.

  • Phase 2 Clinical Trial means a human clinical trial of a product in any country that would satisfy the requirements of 21 C.F.R. 312.21(b) and is intended to explore a variety of doses, dose response, and duration of effect, and to generate initial evidence of clinical safety and activity in a target patient population, or a similar clinical study prescribed by the relevant Regulatory Authorities in a country other than the United States.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;