SCOPE OF WORK AND RESPONSIBILITIES Sample Clauses

SCOPE OF WORK AND RESPONSIBILITIES. 1. Interconnection Customer’s Scope of Work and Responsibilities The Interconnection Customer will design, construct, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, the System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Xxxxxxxxx Solar Project provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), as such specifications shall be modified as a result of the Interconnection Customer’s post Facilities SERVICE AGREEMENT NO. 2557 Study modifications to the Interconnection Customer’s Interconnection Facilities, and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with the Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The metering of any redundant or standby station service provisions at the Xxxxxxxxx Solar Collector Substation shall be added in accordance with the Connecting Transmission Owner’s retail tariff, P.S.C. No. 220, and the Connecting Transmission Owner’s ESB 750. As per the Project Specific Specifications, the Interconnection Customer will install the RTU provided by Connecting Transmission Owner in accordance with Connecting Transmission Owner’s ESBs, indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. (Note: If no indoor facility is available, then installation of the RTU and revenue metering equipment in a dedicated, weatherproof, heated cubicle (accessible only to Connecting Transmission Owner) is acceptable.) For the revenue metering, the Interconnection Customer shall install a meter panel in accordance with the...
AutoNDA by SimpleDocs
SCOPE OF WORK AND RESPONSIBILITIES. 1. Interconnection Customer’s Scope of Work and Responsibilities SERVICE AGREEMENT NO. 2554 The Interconnection Customer will design, construct, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and
SCOPE OF WORK AND RESPONSIBILITIES. Existing Facility: The Connecting Transmission Owner will design and construct the line tap at the Point of Interconnection to the Xxxxxxxxx-South Dow Line #859. The Connecting Transmission Owner will provide, install, test and commission the revenue metering in the Interconnection Customer’s GSU Transformer Station. The Connecting Transmission Owner will wire in the Meter RS-485 communication loop to the RTU, make final termination of the Telco circuit into the Communication Gateway, and test and commission the RTU.
SCOPE OF WORK AND RESPONSIBILITIES. Scope of Work and Responsibilities for the Existing Facility In conjunction with the Chautauqua Line, the Connecting Transmission Owner will design and construct the distribution underbuild, where it is necessary to relocate and underbuild the existing distribution circuit to accommodate the Chautauqua Line. The Connecting Transmission Owner will design and construct the installation of the sectionalizing switches on the Xxxxxxxxx-South Dow Line #859 and complete all work associated with the Xxxxxxxxx Substation and the South Dow Substation. Scope of Work and Responsibilities for the New Facility None. There are no System Upgrade Facilities for the New Facility.
SCOPE OF WORK AND RESPONSIBILITIES. 1. Interconnection Customer’s Scope of Work and Responsibilities The Interconnection Customer will design, construct, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, the System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Xxxxx Solar Project provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”) as such specifications shall be modified as a result of the Interconnection Customer’s post Facilities Study modifications to the Interconnection Customer’s Interconnection Facilities, and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with the Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications.
SCOPE OF WORK AND RESPONSIBILITIES. 1. Interconnection Customer’s Scope of Work and Responsibilities The Interconnection Customer’s Interconnection Facilities shall be designed, constructed, operated, and maintained by the Interconnection Customer in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the NYISO OATT, or applicable NYISO Procedures: NYISO requirements, industry standards and specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric-Specifications, the Project SERVICE AGREEMENT NO. 2549
SCOPE OF WORK AND RESPONSIBILITIES. 1. Interconnection Customer’s Scope of Work and Responsibilities
AutoNDA by SimpleDocs
SCOPE OF WORK AND RESPONSIBILITIES. Engineering, procurement and construction of all System Upgrade Facilities at Connecting Transmission Owner’s Florida and Ephratah Substations shall be completed by Connecting Transmission Owner.
SCOPE OF WORK AND RESPONSIBILITIES. Engineering, procurement and construction of all System Upgrade Facilities at Connecting Transmission Owner’s Johnstown Substation shall be completed by Connecting Transmission Owner.
SCOPE OF WORK AND RESPONSIBILITIES a. HPTE shall provide the Study Services set forth in Exhibit A.