Schematic Design Phase definition

Schematic Design Phase means that Phase during which the Schematic Design Documents are being prepared by the Trade Contractor.
Schematic Design Phase has the meaning set out in Section 4.2(b)(1) of Schedule 2 [Design and Construction Protocols];
Schematic Design Phase means the first of three phases of the Scope of Work. The scope of the Schematic Design Phase is further defined in the RFP.

Examples of Schematic Design Phase in a sentence

  • Further refinement of Schematic Design Phase development of on and off site utility systems for sewer, electrical, water, storm drain and fire water.

  • The Design Professional shall obtain the written approval of the Owner of the Schematic Design Phase before proceeding with the next phase.

  • Further refinement of Schematic Design Phase roadways, walkways, parking and storm drainage improvements.

  • Based on survey and topography data provided by the District, input into computer and develop existing conditions base for the Schematic Design Phase.

  • Reconciled Construction Cost Estimates shall be prepared at the conclusion of the Schematic Design Phase, at the conclusion of the Design Development Phase, when Construction Documents are approximately 50% complete and prior to the submission of the Guaranteed Maximum Price Proposal.


More Definitions of Schematic Design Phase

Schematic Design Phase means that Phase in the development of the Design Documents during which Architect determines the scale and relationship of the Project components.
Schematic Design Phase means the Services described in Section 7(x) below together with such Additional Services as directed by the Owner.
Schematic Design Phase. Ten percent (10%) Design Development Phase: Twenty percent (20%) Construction Documents Phase: Forty percent (40%) Bidding or Negotiation Phase: Five percent (5%) Construction Administration Phase: Twenty percent (20%) <or adjust percentages as necessary for the specific project to the negotiated amounts. Increase Schematic Design Phase to 15% if no Programming Phase is included> Payment to minor sub-consultants whose work proceeds or completes in substantially different timing than the remainder of the Consultants, may be made upon actual billing by other mutually agreed upon schedule.
Schematic Design Phase means that phase of the Design Services required to fulfill the Project, that is managed by the Design-Build Firm, with continuous oversight, and performed by its DPOR, and that includes the DPOR s’ preliminary evaluation of approaches to designing the Project and culminates in the completion of the Design Deliverables required in the Contract Data Requirements List (Exhibit 10) for this phase, including a schematic design package based on the input from Owner and its representatives, including the Program Manager and the Architectural Representative, and based on the DCP, and consisting of preliminary drawings and other documents illustrating the scale and relationship of the Project components, including a site plan and preliminary building plans, sections and elevations, study models, perspective sketches and/or digital modeling, material selections and other Design Phase deliverables as described in the Contract Data Requirements List (Exhibit 10).
Schematic Design Phase means that phase of a Project that follows the Conceptual Design Phase, culminating in the preparation of preliminary drawings and other documents including a site plan and preliminary building plans, sections and elevations, study models, perspective sketches, or digital modeling, alternative material selections, all as approved by Owner.
Schematic Design Phase means that phase of the Project that follows the Project Definition Phase, generally precedes the preparation of Design Development Documents, and during which the basic floor plans showing all room locations, building elevations, and sections, are developed and systems and materials are selected.
Schematic Design Phase. The portion of the work during which the Schematic Design Documents are created.