Examples of Schematic Design Documents in a sentence
Based on its analysis, Construction Manager shall deliver, and meet with Owner Parties to discuss, its formal opinion of the constructability of the major systems and components of the Work, promptly after Design Professional issues the [Schematic Design Documents and the Construction Drawings and Specifications] and in accordance with the Project Schedule.
If Construction Manager’s reconciled Schematic Design Documents cost estimate exceeds the applicable Target GMP, Construction Manager shall promptly furnish Owner Parties with Value Engineering proposals that will cause the estimate to meet or be less than that Target GMP.
Construction Manager shall furnish Owner Parties with cost reduction and Value Engineering analysis on all significant cost components of the Project by conducting a series of Value Engineering workshops during [the Schematic Design Documents phase and the GMP Development process].
Within twenty-one (21) Days after Construction Manager receives the Schematic Design Documents, and based on the outcome of the cost estimating process in Section 5.5 above, Construction Manager shall meet with Owner Parties to deliver its Project scheduling, Project phasing, and constructability advice, analysis, and deliverables, all in accordance with Sections 5.3, 5.4, and 5.5, above.
The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements.