Sabine Pass Project means the LNG terminal located in Cameron Parish, Louisiana that, as of the date hereof, is owned and operated by Sabine Pass LNG, L.P.
Sabine Pass Project means Sabine Pass and/or the LNG receiving terminal in Cameron Parish, Louisiana, featuring a regasification design capacity of approximately 2.6 billion cubic feet per day, two docks and three storage tanks with an aggregate capacity of approximately 10.1 billion cubic feet and all other facilities and activities incidental to the foregoing, to be constructed and owned by Sabine Pass but excluding the Sabine Pass Pipeline or any other pipeline outside the site.

Examples of Sabine Pass Project in a sentence

  • The only bid possibly lost on the merits was LNG tank work in the Sabine Pass Project.

  • We were able to leverage the experience we gained while developing our Sabine Pass Project, and today we are in the final stages of obtaining the required DOE and FERC authorizations.

  • Our Sabine Pass Project also includes the development of two additional trains at Sabine Pass for a total of six trains.

  • We expect to be the largest LNG exporter in the U.S. by 2016 and one of the top three largest LNG exporters in the world by 2020, representing approximately ten percent of the global LNG market.The construction of the Sabine Pass Project is well underway, nearly two years ahead of any other U.S. liquefaction project.

  • Revenue generally will commence on the SPAs as each applicable train reaches date of first commercial delivery (“DFCD”).We have entered into SPAs aggregating approximately $2.9 billion in annual fixed fees and 19.9 mtpa of volumes for the Sabine Pass Project and approximately $1.5 billion in annual fixed fees and 8.4 mtpa of volumes for the Corpus Christi Project.

  • We expect to invest over $30 billion to build nine liquefaction trains, consisting of six trains at Sabine Pass and three trains at Corpus Christi.When the Sabine Pass Project is completed, it will be the first LNG export facility to have been built in North America in over 40 years.

  • Souki, Wortley and Abiteboul and Ms. Gentle as their Milestone Awards for construction of Trains 3 and 4 of the Sabine Pass Project.

  • The first installment of 35% of the restricted stock awards vested immediately and the second and third installments of 10% and 15% of the restricted stock awards vested on August 9, 2013 and August 9, 2014, which were the first and second anniversaries, respectively, of the issuance of NTP to commence construction of Trains 1 and 2 of the Sabine Pass Project.

  • Upon the issuance of NTP to commence construction of Trains 1 and 2 of the Sabine Pass Project on August 9, 2012, Messrs.

  • A portion of their LTI Award for construction of Trains 1 and 2 of the Sabine Pass Project was granted as a cash award.

Related to Sabine Pass Project

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Solar PV Project means the solar Photo Voltaic Power project that uses sunlight for direct conversion into electricity through Photo Voltaic technology.

  • Design-build team means an entity that consists of:

  • Power Plant means a facility for the generation of

  • Generating Facility means the Generating Unit(s) comprising Seller’s power plant, as more particularly described in Section 1.02 and Exhibit B, including all other materials, equipment, systems, structures, features and improvements necessary to produce electric energy and thermal energy, excluding the Site, land rights and interests in land.

  • Design-build means a project delivery method in which the detailed design and subsequent construction is provided through a single contract with a Design-Build firm; a team, partnership, or legal entity that includes design professionals and a builder. The Design-Build Project delivery shall be implemented in accordance with Tex. Gov’t Code § 2166.2531.2

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan; and

  • Cogeneration facility means a power plant in which the heat or steam is also used for industrial or commercial heating or cooling purposes and that meets Federal Energy Regulatory Commission standards for qualifying facilities under the Public Utility Regulatory Policies Act of 1978 (16

  • Pilot project means an innovative environmental project that covers one or more designated facilities, designed and implemented in the form of an EMSA. (See Section 52.3 of the Act.)

  • Generation Interconnection Facilities Study means a Facilities Study related to a Generation Interconnection Request.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Expansion Project has the meaning set forth in Section IV.3.a of this Agreement.

  • Staging pile means an accumulation of solid, non- flowing remediation waste (as defined in this section) that is not a containment building and that is used only during remedial operations for temporary storage at a facility. Staging piles must be designated by the Director according to the requirements of § 264.554 of this regulation.

  • Plant Site (Works, Factory) means the local integration of one or more plants, with any intermediate administrative levels, which are under one operational control, and includes common infrastructure, such as:

  • New Project means (a) each facility which is either a new facility, branch or office or an expansion, relocation, remodeling or substantial modernization of an existing facility, branch or office owned by the Borrower or its Subsidiaries which in fact commences operations and (b) each creation (in one or a series of related transactions) of a business unit to the extent such business unit commences operations or each expansion (in one or a series of related transactions) of business into a new market.

  • Tanning facility means a place that provides access to tanning devices for compensation.

  • Design-Builder means the Person selected pursuant to the RFP that enters into the Contract with the Department to design and construct the Project (also referred to as the “Design-Build Team”).

  • Train Loading Infrastructure means conveyors, stockpile areas, blending and screening facilities, stackers, re‑claimers and other infrastructure reasonably required for the loading of iron ore, freight goods or other products onto the relevant Railway for transport (directly or indirectly) to a loading port; and

  • LNG facility means a terminal which is used for the liquefaction of natural gas or the importation, offloading, and re-gasification of LNG, and includes ancillary services and temporary storage necessary for the re-gasification process and subsequent delivery to the transmission system, but does not include any part of LNG terminals used for storage;

  • Dry cleaning facility means an establishment with one or more dry cleaning systems.

  • The Works/Project means the works to be executed or done under this contract.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Cannabis processing facility means a person that:

  • LNG means liquefied natural gas.