Examples of Required Manuals in a sentence
Contractor shall supply Owner and Operator with all of the Required Manuals (in both hard copy and electronic format, at no additional cost to Owner) which provide, either in a single manual or handbook or collectively, complete operating and maintenance instructions for each major piece of Equipment and system of the Plant.
Contractor warrants that no infringement of any patents, trademark, registered design, copyright, design right or other registerable or proprietary intellectual property right of any kind will be caused by the performance of the Work, the ownership of confidential information or the Project and the Project’s operation in accordance with the Required Manuals.
Maintenance expert training and database management including document collections are supporting the cycle to move.Major deliveries under this output were listed in Table 2-11; Table 2-11 Major Deliveries under Output 1 Table 2-12 Manuals and guidelines prepared in the project Required Manuals under PDMActual Title of Manuals (Guidelines) Figure 2-2 Schematic Image of Bridge Maintenance Cycle Output-1: The bridge maintenance cycle is established.
Use of this STC requires the following FAA approved manuals, or later FAA approved revisions:Table 1: Required Manuals for STC Aircraft ConfigurationNote: -3 Configuration is not FAA approved.
Curriculum Materials: The Required Manuals are Aquarian Teacher Textbook & Yoga Manual and Master’s Touch Book.
Contractor warrants that no infringement of any patents, trademark, registered design, copyright, design right or other registerable or proprietary intellectual property right of any kind will be caused by the performance of the Work, the ownership of confidential information or the Facility and the Facility’s operation in accordance with the Required Manuals.
Secondly, blurriness is present in all datasets but is most prominent in the reconstructed data of the ALS (Figs.
After successfully completing the Tests in accordance with Section 10.4 and submitting all Required Manuals, drawings and final cost report pursuant to Appendix Q, and after Contractor determines that all of the requirements for Final Acceptance have been completed, Contractor shall provide written notice thereof to Owner and shall submit a proposed Final Acceptance Certificate, in substantially the form attached hereto as Appendix D, to Owner.
Contractor’s warranties in Section 12.1.1 and 12.1.2 expressly exclude Defects caused by Owner’s failure to comply with the Required Manuals and manufacturers’ guidelines applicable to the Equipment.
Required Manuals: Section 017700 – Contract Closeout Requirements describes number and type of copies required for contract closeout requirements.