Reference Resource definition

Reference Resource means a combustion turbine generating station, configured with two General Electric Frame 7FA turbines with inlet air cooling to 50 degrees, Selective Catalytic Reduction technology all CONE Areas, dual fuel capability, and a heat rate of 10.096 Mmbtu/ MWh.
Reference Resource means a combustion turbine generating station, configured with a single General Electric Frame 7HA turbine with evaporative cooling, Selective Catalytic Reduction technology all CONE Areas, dual fuel capability, and a heat rate of 9.134 Mmbtu/ MWh.
Reference Resource means a combustion turbine generating station, configured with two General Electric Frame 7FA turbines with inlet air cooling to 50 degrees, Selective Catalytic Reduction technology in CONE Areas 1, 2, 3, and 4, dual fuel capability, and a heat rate of

Examples of Reference Resource in a sentence

  • The Department maintains current documents and a summary of the latest revisions through the Design Reference Resource Center (DRRC) (xxxx://xxx.xxx.xxxxx.xx.xx/drrc/) (the DRRC page of the Department’s Website).

  • The correspondence transmitting final deliverables shall note the last revision date of the Design Reference Resource Center upon which the plans were based.

  • Program/Class Caseload Reference Resource Specialist 28 EC 56362.c* Language, Speech and Hearing Specialist 55 EC56363.3* Special Education 12 Early Intervention Program: Infant 16 Special Education ED: K-8 9 Special Education ED: High School 12 Special Education Day Class: age K-22 15 Adapted P.E. 55 All Court/Community School Classes 17 Opportunity Classes 17 Independent Study 25 EC 51745.6** Caseload in Court/Community School Classes not to exceed 17 students in attendance.

  • The letter transmitting final tracings shall note the last revision date of the Design Reference Resource Center upon which the plans were based.

  • In state fiscal years 2014 and 2015 the Providence Public Library has been selected to serve as the Statewide Reference Resource Center for Operations and Reference Services.

  • National Register of Historic Places: Listed Properties as of October 1, 2011 Reference Resource Address Resource Number Name Type 76001548 Xxxxx, Gen.


More Definitions of Reference Resource

Reference Resource means a combustion turbine generating station, configured with two General Electric Frame 7FA turbines with inlet air cooling to 50 degrees, Selective Catalytic Reduction technology, dual fuel capability, and a heat rate of 10,500 Mmbtu/ MWh.
Reference Resource means a combustion turbine generating station, configured with two General Electric Frame 7FA turbines with inlet air cooling to 50 degrees, Selective Catalytic Reduction technology in all CONE Areas, dual fuel capability, and a heat rate of 10.096 Mmbtu/ MWh.
Reference Resource means a combustion turbine generating station, configured with two General Electric Frame 7FA turbines with inlet air cooling to 50 degrees, Selective Catalytic Reduction technology in CONE Areas 1, 2, 3, and 4, dual fuel capability, and a heat rate of 10.096 Mmbtu/ MWh.” ‐ PJM OATT, Attachment DD, 2.58
Reference Resource means a combustion turbine generating station, configured with two General Electric Frame 7FA turbines with inlet air cooling to 50 degrees, Selective Catalytic
Reference Resource means a combustion turbine generating station, configured with twoa single General Electric Frame 7FA turbines7HA turbine with inlet airevaporative cooling to 50 degrees, Selective Catalytic Reduction technology all CONE Areas, dual fuel capability, and a

Related to Reference Resource

  • Energy Storage Resource means a resource capable of receiving electric energy from the grid and storing it for later injection to the grid that participates in the PJM Energy, Capacity and/or Ancillary Services markets as a Market Participant. Facilities Study:

  • Capacity Storage Resource means any hydroelectric power plant, flywheel, battery storage, or other such facility solely used for short term storage and injection of energy at a later time to participate in the PJM energy and/or Ancillary Services markets and which participates in the Reliability Pricing Model.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Day-ahead Energy Market means the schedule of commitments for the purchase or sale of energy and payment of Transmission Congestion Charges developed by the Office of the Interconnection as a result of the offers and specifications submitted in accordance with Operating Agreement, Schedule 1, section 1.10 and the parallel provisions of Tariff, Attachment K-Appendix.

  • Level 3 means Level 3 Communications, Inc., a Delaware corporation.