REESS charging mode coupled to the power grid definition

REESS charging mode coupled to the power grid means the normal charging operation mode of the vehicle and/or charging system."
REESS charging mode coupled to the power grid means the normal charging operation mode of the vehicle and / or charging system. 3.0 APPLICATION FOR APPROVAL 3.1 Approval of a Vehicle Type 3.1.1 The application for approval of a vehicle type, with regard to its electromagnetic compatibility, shall be submitted by the vehicle manufacturer. 3.1.2 The technical specifications to be submitted at the time of applying for type approval are as given in Annex 1A. 3.1.3 The vehicle manufacturer shall draw up a schedule describing all relevant vehicle electrical / electronic systems or ESAs, body styles, variations in body material, general wiring arrangements, engine variations, and wheelbase versions. Relevant vehicle electrical / electronic systems or ESAs are those which may emit significant broadband or narrowband radiation and/ or those which are involved in immunity related functions of the vehicle (see paragraph 2.12.) and those which provide coupling systems for charging the REESS. 3.1.4 A vehicle representative of the type to be approved shall be selected from this schedule by mutual agreement between the manufacturer and the Test Agency. The choice of vehicle shall be based on the electrical / electronic systems offered by the manufacturer. One or more vehicles may be selected from this schedule if it is considered by mutual agreement between the manufacturer and the Test Agency that different electrical / electronic systems are included which are likely to have a significant effect on the vehicle's electromagnetic compatibility compared with the first representative vehicle.

Examples of REESS charging mode coupled to the power grid in a sentence

  • This method concerns only ESA other than those involved in "REESS charging mode coupled to the power grid".

  • This method concerns only the configuration of the vehicle other than "REESS charging mode coupled to the power grid".

  • This test is intended to measure the level of harmonics generated by vehicle in configuration "REESS charging mode coupled to the power grid" through its AC power lines in order to ensure it is compatible with residential, commercial and light industrial environments.

  • This test is intended to measure the level of harmonics generated by an ESA in configuration "REESS charging mode coupled to the power grid" through its AC power lines in order to ensure it is compatible with residential, commercial and light industrial environments.

  • This test is intended to measure the level of voltage changes, voltage fluctuations and flicker generated by ESA in configuration "REESS charging mode coupled to the power grid" through its AC power lines in order to ensure it is compatible with residential, commercial and light industrial environments.

  • This test is intended to measure the level of voltage changes, voltage fluctuations and flicker generated by vehicle in configuration "REESS charging mode coupled to the power grid" through its AC power lines in order to ensure it is compatible with residential, commercial and light industrial environments.

  • This test is intended to measure the level of radio frequency conducted disturbances generated by vehicle in configuration "REESS charging mode coupled to the power grid" through its AC or DC power lines in order to ensure it is compatible with residential, commercial and light industrial environments.

  • This test is intended to measure the level of radio frequency conducted disturbances generated by ESA in configuration "REESS charging mode coupled to the power grid" through its wired network port in order to ensure it is compatible with residential, commercial and light industrial environments.

  • This test is intended to measure the level of radio frequency conducted disturbances generated by ESA in configuration "REESS charging mode coupled to the power grid" through its AC or DC power lines in order to ensure it is compatible with residential, commercial and light industrial environments.

  • This method concerns only the configuration of the vehicle with "REESS charging mode coupled to the power grid".

Related to REESS charging mode coupled to the power grid

  • Assigned Annual Special Tax means the Special Tax of that name described in Section D.

  • Anticipated total county revenue availability per student means the anticipated total county revenue availability for the county divided by the average daily membership of the county.

  • CAFRA Centers, Cores or Nodes means those areas with boundaries incorporated by reference or revised by the Department in accordance with N.J.A.C. 7:7-13.16.

  • Anticipated total county revenue availability means the sum of the:

  • Available RP Capacity Amount means the amount of Restricted Payments that may be made at the time of determination pursuant to Sections 6.04(a)(ii)(D), (a)(vii) and (a)(x) minus the aggregate amount of the Available RP Capacity Amount utilized by the Borrower or any Restricted Subsidiary to (a) make Investments pursuant to Section 6.06(q)(ii), (b) make Restricted Debt Payments pursuant to Section 6.04(b)(iv)(B) or (c) incur Indebtedness pursuant to Section 6.01(ll).

  • Peak tube potential means the maximum value of the potential difference across the x-ray tube during an exposure.

  • Daily Unforced Capacity Obligation means the capacity obligation of a Load Serving Entity during the Delivery Year, determined in accordance with Reliability Assurance Agreement, Schedule 8, or, as to an FRR entity, in Reliability Assurance Agreement, Schedule 8.1. Day-ahead Congestion Price: “Day-ahead Congestion Price” shall mean the Congestion Price resulting from the Day-ahead Energy Market. Day-ahead Energy Market:

  • Mining overburden returned to the mine site means any material overlying an economic mineral deposit which is removed to gain access to that deposit and is then used for reclamation of a surface mine.

  • Total Evaluated CRIS MW means the Additional CRIS MW requested plus either (i) if the Installed Capacity Supplier previously received an exemption under Sections 23.4.5.7.2(b), 23.4.5.7.6(b), 23.4.5.7.7 or 23.4.5.7.8, all prior Additional CRIS MW since the facility was last exempted under Sections 23.4.5.7.2(b), 23.4.5.7.6(b), or 23.4.5.7.8, or (ii) for all other Installed Capacity Suppliers, all MW of Capacity for which an Examined Facility obtained CRIS pursuant to the provisions in ISO OATT Sections 25, 30, or 32 (OATT Attachments S, X, or Z). For purposes of Section 23.4.5 of this Attachment H, “UCAP Offer Reference Level” shall mean a dollar value equal to the projected clearing price for each ICAP Spot Market Auction determined by the ISO on the basis of the applicable ICAP Demand Curve and the total quantity of Unforced Capacity from all Installed Capacity Suppliers in a Mitigated Capacity Zone for the period covered by the applicable ICAP Spot Market Auction. For purposes of Section 23.4.5 of this Attachment H, “Unit Net CONE” shall mean localized levelized embedded costs of a specified Installed Capacity Supplier, including interconnection costs, and for an Installed Capacity Supplier located outside a Mitigated Capacity Zone including embedded costs of transmission service, in either case net of likely projected annual Energy and Ancillary Services revenues, and revenues associated with other energy products (such as energy services and renewable energy credits, as determined by the ISO, translated into a seasonally adjusted monthly UCAP value using an appropriate class outage rate. The Unit Net CONE of an Installed Capacity Supplier that has functions beyond the generation or transmission of power shall include only the embedded costs allocated to the production and transmission of power, and shall not net the revenues from functions other than the generation or transmission of power.

  • Capacity Utilization Factor or “CUF” Shall have the same meaning as provided in CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 as amended from time to time. Here, the CUF is expressed in AC terms.

  • Final RTO Unforced Capacity Obligation means the capacity obligation for the PJM Region, determined in accordance with RAA, Schedule 8. Financial Close:

  • Applicable Utilization Fee Rate means, as of any date, the percentage rate per annum at which Utilization Fees accrue on all Revolving Credit Advances at such time as set forth in the Pricing Schedule.

  • Non-Performing High Yield Securities means High Yield Securities other than Performing High Yield Securities.

  • Cubic foot of gas means the amount of gas required to fill a cubic foot of space when the gas is at an absolute pressure of fourteen and seventy-three hundredths (14.73) pounds per square inch at a temperature of sixty (60) degrees Fahrenheit.

  • Cathode ray tube or “CRT” means a vacuum tube, composed primarily of glass, which is the visual or video display component of an electronic device. A “used, intact CRT” means a CRT whose vacuum has not been released. A “used, broken CRT” means glass removed from its housing or casing whose vacuum has been released.

  • Open burning means the combustion of any material without the following characteristics:

  • Showing Month shall be each day of each calendar month of the Delivery Period that is the subject of the Compliance Showing, as set forth in the CPUC Decisions and outlined in the CAISO Tariff. For illustrative purposes only, pursuant to the CAISO Tariff and CPUC Decisions in effect as of the Execution Date, the monthly Compliance Showing made in June is for the Showing Month of August.

  • Borrowing Base Utilization Percentage means, as of any day, the fraction expressed as a percentage, the numerator of which is the sum of the Revolving Credit Exposures of the Lenders on such day, and the denominator of which is the Borrowing Base in effect on such day.

  • Gross Vehicle Weight Rating (GVWR) means the maximum weight of the vehicle, as specified by the manufacturer. GVWR includes total vehicle weight plus fluids, passengers, and cargo.

  • Applicable Utilization Fee means, as of any date that the aggregate Advances exceed 33% of the aggregate Commitments, a percentage per annum determined by reference to the Public Debt Rating in effect on such date as set forth below: -------------------------------- ----------------------------- Public Debt Rating Applicable S&P/Moody's Utilization Fee -------------------------------- ----------------------------- Level 1 BBB+ or Baa1 or above 0.125% -------------------------------- ----------------------------- Level 2 BBB or Baa2 0.250% -------------------------------- ----------------------------- Level 3 BBB- and Baa3 0.000% -------------------------------- ----------------------------- Level 4 BBB- or Baa3 0.000% -------------------------------- ----------------------------- Level 5 BB+ and Ba1 0.000% -------------------------------- ----------------------------- Level 6 Lower than Level 5 0.000% -------------------------------- -----------------------------

  • Gross vehicle weight rating means the weight specified by the manufacturer as the loaded weight of a single vehicle.

  • Full Capacity Deliverability Status or “FCDS” has the meaning set forth in the CAISO Tariff.

  • Respective Part of the Project means, for the Recipient and for any Project Implementing Entity, the part of the Project specified in the Legal Agreements to be carried out by it.

  • Backup Annual Special Tax means the Special Tax of that name described in Section E.

  • fruitless and wasteful expenditure means expenditure that was made in vain and would have been avoided had reasonable care been exercised;

  • Base Capacity Demand Resource Price Decrement means, for the 2018/2019 and 2019/2020 Delivery Years, a difference between the clearing price for Base Capacity Demand Resources and Base Capacity Energy Efficiency Resources and the clearing price for Base Capacity Resources and Capacity Performance Resources, representing the cost to procure additional Base Capacity Resources or Capacity Performance Resources out of merit order when the Base Capacity Demand Resource Constraint is binding.