Examples of Raw water reservoir in a sentence
Raw water reservoir will be constructed within power plant to store the pumped water from the river to supply water throughout the year to the power station and the storage is envisaged for 20 days.
A pipeline will be laid to the project site from the proposed intake pump house to Raw water reservoir.
Reviewing customer satis- faction is possible as both a single service event and overall satisfaction.
For CW sump level, Raw water reservoir level, Turbine oil tank, coal bunkers, Ash Silo, LDO/HFO tank, DM water tanks, CS tank, Acid and alkali applications, only non contact type level transmitters like Acoustic, Ultrasonic, Radar based shall be provided by bidders as specified in NIT and as approved by owner.
Apart from the Underground Conveyance System, Reservoirs i.e. Main Raw water reservoir, main pump house, Block Level Raw water reservoirs and pump houses & Diggi, and pump houses , administrative & residential buildings are other main components of the project, in Churu and Jhunjhunu districts of Rajasthan.
Civil & Structurals: Complete Civil Engineering and Design for Power Plant covering Earth works Design (including Grading & Levelling), Foundation of Equipment including TG & Boiler foundation; Power House and Technological buildings; non plant buildings; roads, drains and paving; Raw water reservoir, Chimneys, Ash Ponds; Structural & Architectural works etc.
Floating Solar panel at IOCL Panipat Naphtha Cracker unitThe floating solar plant of 100 KWp, Land-neutral, Floating (fixed tilt type), On-grid Solar Power Plant is installed at Raw water reservoir using suitably designed modular and pre- fabricated floatation device.
Start-up power availability completed on 29.01.2021, DCS was commissioned, Raw water reservoir compartment-2 was completed & raw water was taken in reservoir on 12-03-2021, NDCT-1 shell erection was completed and Unit-1 chimney flue can erection was completed.
Raw water reservoir & pumping facility at township, raw water pipeline and associated facilities for transfer of raw water to Refinery Site.
Results of the formative and summative evaluations will be used to define program goals and objectives and to determine the overall effectiveness ofthe project.(c) Quality ofthe Management PlanAdequacy ofthe management plan to achieveprogram objectives on time and with in budgetMCSD has a permanent staff of administrators, teachers, and district level professionals who are dedicated to and will maintain the validity and reliability of Project MCSD#345.