Examples of RA Work Plan in a sentence
If Settling Defendant elects to undertake Phase 2, but the Parties do not agree on an area pursuant to Paragraph 17 or the conditions in Paragraph 17 are not met, Settling Defendant shall begin the Phase 2 dredging in accordance with the applicable schedule in the EPA-approved RA Work Plan for Phase 2 Dredging and Facility Operations (or in any EPA-approved revisions and/or addenda to the RA Work Plan for Phase 1 Dredging that apply to the first complete year of Phase 2).
Upon notification by the Response Agencies of any deficiencies in the RA Work, SDs shall take all necessary steps to correct the deficiencies and/or bring the RA Work into compliance with the Remedial Design, any approved design changes, and/or the approved RA Work Plan.
This section of the SOW includes a description of contracting activities, a description of the development of a Remedial Action (RA) Work Plan for Facility Site Work Construction, and a summary of Phase 1 facility site work construction activities.
An omnidirectional antenna is used with a Spread Spectrum unit for typical multiple point-to-point or mobile applications, since a multiple point-to-point unit must communicate in various directions, and a mobile system must communicate in any direction required by its location from moment to moment.
The RA Work Plan will incorporate, by reference, pertinent aspects of the RD Work Plan.
To describe the deep water properties of the Adaman Basin, which is an enclosed basin below approximately 1500 m depth.In addition, there are a number of questions that will be addressed using data from a combination of multiple sections, VOS XBT data, Lagrangian drifter data, etc.
This Amended Remedy includes dredging in the following areas beyond those areas already identified by the 2007 RA Work Plan: re-dredge of Sub-Area POG2 and areas north of the trestle trail with residual concentrations above 5.0 ppm; 7-8 acres in Sub-Area D1; 40 acres in Sub-Areas D2N, E3 North, E3 South, E4, POG4, and F (due to capping constraints, based on a 6-foot post-cap water depth requirement); and 0.7 acres in Sub-Area E2.
GE shall complete the contracting activities described in this section to select and retain contractor(s) to assist in development of the RA Work Plan for Phase 1 Processing Equipment Installation and to install the sediment processing equipment and complete any remaining site work construction.Bid Solicitation, Contractor Selection, and Issuance of Notice(s) of Award GE shall solicit bids for the Phase 1 processing equipment installation and remaining site work based on the Phase 1 Final Design Report.
Record drawings shall be submitted to EPA after completion of facility construction activities, in accordance with the schedule provided in the RA Work Plan for Phase 2 Dredging and Facility Operations.
Upon notification by the Response Agencies of any deficiencies in the RA Work, NCR shall take all necessary steps to correct the deficiencies and/or bring the RA Work into compliance with the Remedial Design, any approved design changes, and/or the approved RA Work Plan.