Proof Consultant definition

Proof Consultant shall have the meaning set forth in Clause 10.2;
Proof Consultant shall have the meaning set forth in Clause 10.2; “Quality Assurance Plan” or “QAP” shall have the meaning set forth in Clause 11.2; “Re.”, “Rs.” or “Rupees” or “Indian Rupees” or “INR” means the lawful currency of the Republic of India; Contract AgreementPage 23 of 159 “Four Laning of Jhanji to Demow from Km. 491.050 to Km. 535.250 of NH-37 in the state of Assam under SARDP on Engineering Procurement and Construction (EPC) Mode. April 2022Request for Proposals” or “RFP” shall have the meaning set forth in Recital ‘C’; “Retention Money” shall have the meaning set forth in Clause 7.5; “Right of Way” means and refers to the total land required and acquired for the project, both in its width and length, together with all way leaves, easements, unrestricted access and other rights of way, howsoever described, necessary for construction and maintenance of the Project Highway in accordance with this Agreement; “Safety Consultant” shall have the meaning set forth in Clause 10.1; “Scheduled Completion Date” shall be the date set forth in Clause 10.3; “Scheduled Construction Period” means the period commencing from the Appointed Date and ending on Scheduled Completion Date; “Scope of the Project” shall have the meaning set forth in Clause 2.1; “Section” means a part of the Project Highway; “Site” shall have the meaning set forth in Clause 8.1; “Specifications and Standards” means the specifications and standards relating to the quality, quantity, capacity and other requirements for the Project Highway, as set forth in Schedule-D, and any modifications thereof, or additions thereto, as included in the design and engineering for the Project Highway submitted by the Contractor to, and expressly approved by, theAuthority; "Stage Payment Statement" shall have the meaning set forth in Clause 19.4; “Structures” means an elevated road or a flyover, as the case maybe; “Sub-contractor” means any person or persons to whom a part of the Works or the Maintenance has been subcontracted by the Contractor and the permitted legal successors in title to such person, but not an assignee to suchperson; “Suspension” shall have the meaning set forth in Article 22; “Specialised Work” means the work which requires expertise or particular skill/technique or an advanced level of knowledge in the specific field for undertaking the work as required in the Project. “Taking Over Certificate” shall have the meaning set forth in Clause 14.10; “Taxes” means any Indian taxes including GST, excise ...
Proof Consultant shall have the meaning as set forth in Clause 10.2.2; “Provisional Certificate” shall have the meaning as set forth in Clause 12.2; “Punch List”shall have the meaning as set forth in Clause 12.2.1;

Examples of Proof Consultant in a sentence

  • The Contractor shall also obtain the consent of the Authority for two (2) key personnel of the Proof Consultant who shall have adequate experience and qualifications in highways and bridges respectively.

  • The Authority shall, within 15 (fifteen) days of receiving a proposal from the Contractor hereunder, convey its decision, with reasons, to the Contractor, and if no such decision is conveyed within the said period, the Contractor may proceed with engaging of the Proof Consultant.


More Definitions of Proof Consultant

Proof Consultant. - “Proof Consultant” shall mean a person/firm/company appointed by the department for undertaking independent proof checking of designs of this scheme to be prepared by the Consultant.
Proof Consultant means a reputed firm/ Institution engaged by the Consultant or IIT Palakkad as the case may be for undertaking independent proof checking/ vetting of drawings and designs etc. carried out by the Consultant.
Proof Consultant. "Proof Consultant” shall mean a person/firm/company approved by Engineer- in-charge for undertaking independent proof checking of designs of this scheme to be prepared by the Consultant.
Proof Consultant shall have the meaning set forth in Clause 10.2; “Quality Assurance Plan” or “QAP” shall have the meaning set forth in Clause 11.2; “Re.”, “Rs.” or “Rupees” or “Indian Rupees” or “INR” means the lawful currency of the Republic of India; Contract AgreementPage 23 of 159 “Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Km 146+230 to Km 157+460 (Design Chainage 145+712 to Km 156+502) of Dillai to Lahorijan (Package - 7) of NH-29 in the State of Assam on EPC Mode under NH(O)-NE . April 2022Request for Proposals” or “RFP” shall have the meaning set forth in Recital ‘C’; “Retention Money” shall have the meaning set forth in Clause 7.5; “Right of Way” means and refers to the total land required and acquired for the project, both in its width and length, together with all way leaves, easements, unrestricted access and other rights of way, howsoever described, necessary for construction and maintenance of the Project Highway in accordance with this Agreement; “Safety Consultant” shall have the meaning set forth in Clause 10.1; “Scheduled Completion Date” shall be the date set forth in Clause 10.3; “Scheduled Construction Period” means the period commencing from the Appointed Date and ending on Scheduled Completion Date; “Scope of the Project” shall have the meaning set forth in Clause 2.1; “Section” means a part of the Project Highway; “Site” shall have the meaning set forth in Clause 8.1; “Specifications and Standards” means the specifications and standards relating to the quality, quantity, capacity and other requirements for the Project Highway, as set forth in Schedule-D, and any modifications thereof, or additions thereto, as included in the design and engineering for the Project Highway submitted by the Contractor to, and expressly approved by, theAuthority; "Stage Payment Statement" shall have the meaning set forth in Clause 19.4; “Structures” means an elevated road or a flyover, as the case maybe; “Sub-contractor” means any person or persons to whom a part of the Works or the Maintenance has been subcontracted by the Contractor and the permitted legal successors in title to such person, but not an assignee to suchperson; “Suspension” shall have the meaning set forth in Article 22; “Specialised Work” means the work which requires expertise or particular skill/technique or an advanced level of knowledge in the specific field for undertaking the work as required in the Project. “Taking Over Certificate” shall have the meaning set forth in Clau...
Proof Consultant shall have the meaning set forth in Clause 10.2; “Quality Assurance Plan” or “QAP” shall have the meaning set forth in Clause 11.2; “Re.”, “Rs.” or “Rupees” or “Indian Rupees” or “INR” means the lawful currency of the Republic of India; “Request for Proposals” or “RFP” shall have the meaning set forth in Recital ‘C’; Contract AgreementPage 24 of 153 “Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) on EPC Mode in the State of Assam under JICA - ODA loan assistance.” Mar 2022
Proof Consultant means a reputed firm/ Institution like IITs/ NITs/Govt Engg. College engaged by the Consultant or IISER Tirupati as the case may be for undertaking independent proof checking/ vetting of drawings and designs etc. carried out by the consultant.
Proof Consultant shall have the meaning set forth in Clause 10.2; “Quality Assurance Plan” or “QAP” shall have the meaning set forth in Clause 11.2; “Re.”, “Rs.” or “Rupees” or “Indian Rupees” or “INR” means the lawful currency of the Republic of India; “Request for Proposals” or “RFP” shall have the meaning set forth in Recital ‘C’; “Retention Money” shall have the meaning set forth in Clause 7.5; “Right of Way” means and refers to the total land required and acquired for the project, both in its width and length, together with all way leaves, easements, unrestricted access and other rights of way, howsoever described, necessary for construction and maintenance of the Project Highway in accordance with this Agreement; “Safety Consultant” shall have the meaning set forth in Clause 10.1; Draft Contract AgreementPage 22 of 146 “Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur from km 43.480 near Phelong Village to km 54.180 near Azuram Village (Length- 10.700 km) (Package-4) on EPC mode.” May 2021