Project Performance Test Contractor definition

Project Performance Test Contractor means [●] or such other independent, experienced, and reputable contractor for performance testing of solar photovoltaic electric generating facilities with integrated battery energy storage systems as Buyer and Seller may agree upon in a writing signed by Xxxxx and Seller.
Project Performance Test Contractor means General Physics Corporation or such other independent, experienced and reputable contractor as Seller and Purchaser may agree upon in a writing signed by Seller and Purchaser.

Examples of Project Performance Test Contractor in a sentence

  • The goals were to 1) identify and trans- mit priority research areas to SWOG leadership and investigators for their consideration within existing prioritization processes and 2) identify topic areas for development of specific comparative effective- ness research studies in collaboration with SWOG investigators.

Related to Project Performance Test Contractor

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Performance Tests means the tests to be conducted on the equipment at site for checking the performance parameters of the equipment as defined in Technical Specification.

  • Subprojects means more than one such Subproject.

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • Subproject means a development activity proposed by a Beneficiary under Part A.2 (d) of the Project and financed or to be financed through a Subproject Grant (as hereinafter defined) made out of the proceeds of the Development Credit;

  • EPC Contractor means Seller’s engineering, procurement and construction contractor or such Person performing those functions.

  • Capacity Performance Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(a).

  • Performance and Guarantee Test means all operational checks and tests required to determine and demonstrate capacity, efficiency and operating characteristics as specified in the Contract Documents.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Project Milestones means the project milestones set forth in Schedule-G;

  • Performance and Guarantee Tests , shall mean all operational checks and tests required to determine and demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Project Milestone means the project milestone set forth in Schedule-J;

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Service Level means the standard set forth below by which IBM measures the level of service it provides in this SLA.

  • Control Performance Standard or “CPS” shall mean the reliability standard that sets the limits of a Balancing Authority’s Area Control Error over a specified time period.

  • Service Levels means the service levels to be met by the Services as referenced in the Contract Letter and set out in the Specification Schedule.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Key Performance Indicator means a measure that captures the performance of a critical variable to expand and improve community-based corrections programs to promote offender success, ensure accountability, enhance public safety, and reduce recidivism.

  • Project Scope means the description or activity of work to be accomplished on the Project.

  • Performance Review means a summative evaluation of a teacher other than a beginning teacher and used to determine whether the teacher’s practice meets school district expectations and the Iowa teaching standards, and to determine whether the teacher’s practice meets school district expectations for career advancement in accordance with Iowa Code section 284.7.

  • Continuous parameter monitoring system (CPMS means all of the equipment necessary to meet the data acquisition and availability requirements of the Prevention of Significant Deterioration program, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • energy performance contracting means a contractual arrangement between the beneficiary and the provider of an energy efficiency improvement measure, verified and monitored during the whole term of the contract, where investments (work, supply or service) in that measure are paid for in relation to a contractually agreed level of energy efficiency improvement or other agreed energy performance criterion, such as financial savings;

  • Extreme performance coating means coatings designed for harsh exposure or extreme environmental conditions.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).