Examples of Project Meter in a sentence
All electric metering associated with the Project including the Project Meter, whether owned by Seller or a third party, shall be installed, operated, maintained, and tested by or on behalf of Seller in accordance with NERC, ReliabilityFirst Corporation, PJM Agreements, Good Utility Practices, and any applicable Buyer technical requirements and standards.
If the physical location of the Project Meter is not at the Point of Receipt, then, in conformance with applicable PJM rules and Good Utility Practice, revenue quality loss-compensation metering shall be used to account for any transmission or transformer losses between the Project Meter and the Point of Receipt.
These telemetry data point requirements are outlined in Buyer’s “Technical Considerations Covering Parallel Operations of Customer Owned Generation of One Megawatt or Greater and Interconnected with the Conectiv Power Delivery System.” The MWH and MVARH values that are telemetered to Buyer must originate from the Project Meter.
To support invoice settlement purposes, Seller shall provide Buyer with reasonable access to the Project Meter and all other real-time meters, billing meters and back-up meters (i.e., all metering) in accordance with the Interconnection Service Agreement.
The amount of Energy measured by the Project Meter as being delivered to the Delivery Point rounded downward to the nearest MWh shall be the basis for determining Delivered Energy and the amount of other Products delivered pursuant to this Agreement based on such Delivered Energy, subject to Buyer’s testing and audit rights.
The Seller shall install, maintain, operate, test and replace (as appropriate) the Project Meter, telemetry equipment, and other appropriate electric meters and back-up meters at its sole cost and expense to accurately determine Delivered Energy taken by Buyer under this Agreement or otherwise delivered by the Project.
The Project Meter shall measure the delivery of Products at the Delivery Point.
The actual physical location of the Project Meter is proposed to be at Seller’s on-shore switching station (near Xxxxxxx, Delaware).
Seller shall send via a means of transmission approved by the Operating Committee and consistent with Good Utility Practice and the PJM Agreements the specific telemetry data points required for the Project, as measured by the Project Meter, including: MW, MVAR, MWH, MVARH, isolation breaker open/closed status, interconnection bus voltage, and amp flow.
Started key Capital Improvement Projects (CIP) such as the Barrigada 2 Million Gallon (MG) Tank Replacement, Meter Replacement Program, Asan Springs Rehabilitation, Brigade II Booster Pump Station, SCADA Master Plan, Master Meter Project, Meter Test Facility which includes a meter test bench, and leak repair and line replacement contracts.