Project Assumptions definition

Project Assumptions. We have made the following assumption in the preparation of this proposal: • Preliminary and ROW plan designs for the corridor are not included with this contract and will be performed with a supplemental agreement. • City will provide current AIMS data. • City will provide recent plats and pertinent right-of-way and easement data that are available and may not be reflected on AIMS. • The PES will be completed using survey as shown above. • No additional traffic operational analysis or safety analysis will be conducted or prepared with the scope of this project. All applicable traffic data will be taken/referenced from the 2022 Merriam Connected Corridor Plan. • Pavement design will follow the City of Overland Park standards for material and thickness and will not be independently developed or evaluated by Xxxxxx. • Utility relocations are currently unknown. If required, the relocations will be designed by the respective utilities or by supplemental agreement, including sanitary sewer. • No special floodzone permitting or modeling will be required other than what is specifically listed in the scope. • An individual 404 permit will not be required. • Permitting and mitigation fees will be paid by the client. • Xxxxxx will provide the Client PDF and CAD files on an online file exchange system. Exclusions: The following items, in addition to any items not specifically listed above are not included in this proposal but can be provided under a supplemental agreement: • Utility Design (electric, gas, comm/fiber) • Sanitary sewer design • Septic system design • Waterline system modeling • Concrete pavement design or joint layouts • Bridge/structural load ratings • Individual 404 permit • LOMR/CLOMR • Environmental investigation, permitting beyond those noted in the scope • Landscaping • 3D renderings and visualizations • Title work or ownership and encumbrance reports. • Right-of-way appraisals and negotiations • Construction observations, testing, and inspection • Hardscape, amenity, signage, monumentation, and sculpture design • Architectural servicesStructural design • Irrigation Designs • Any services not specifically detailed in the scope. MAN-HOUR ESTIMATE - Merriam Drive (50th Terrace to 47th Street) Preliminary Engineering Study Hourly Rate $249.00 $211.00 $212.00 $149.00 $120.00 $200.00 $160.00 $120.00 $151.00 $126.00 $95.00 Task No. Description of Work Items / Tasks Team Lead Tech Lead Sen Eng Assoc. Eng. Sen Tech SV TL SRVY (2 MC) SRVY (1 MC) Sen SV...
Project Assumptions are set forth in Appendix A – Project Assumptions attached hereto and hereby incorporated into the Contract (the “Project Assumptions”). Provider will provide, and has based its fees on satisfying, the In-Scope Services as described in the Project Assumptions. Any additional scope or system gaps not listed shall be deemed Out-of-Scope. If a new, required scope item is discovered, Provider will document the requirement, estimate and present the scope impact of addressing the new requirement to GLO, and if approved by GLO through the change control process set forth below, include it in the revised In-Scope Services. “Go-Live” refers to the date on which GLO uses the software programs specified in Software Appendix No. 3 to the MSLA (“SA 3”) in a production environment. Further assumptions about the project scope, work plan and timeline are defined within the Project Assumptions.
Project Assumptions means assumptions about the SOW. Changes in any of the assumptions will affect the scope, schedule, and/or cost of the Project.

Examples of Project Assumptions in a sentence

  • Project Schedule Table 1: Project Schedule Task Start End Jan 2018 Feb 2018 Mar 2018 Apr 2018 May 2018 Kick-off/ Data Gathering and Analysis 1/26/2018 3/5/2018 Draft Report/Exit Conference 3/5/2018 4/23/2018 Final Report/Presentation 4/23/2018 5/18/2018 Project Assumptions MCP has provided an estimated project schedule and will develop a detailed project schedule for review and modification at the kickoff meeting.

  • DocuSign Envelope ID: CA54D071-F059-46E6-9D54-8DF685B48B4D Project Assumptions The success of this engagement is dependent on the commitment and effort of both parties.

  • Post Enablement Support After data is loaded, the account configured, and users are trained the system is ready to roll-out • Support go-live – adjust configuration, provide additional training and data entry support • Review aspects of AE planned for future use • Define follow-up tasks and next steps • Define Post Launch Support point of contact Project Assumptions DSI has made the following general assumptions in this SOW to derive the estimated cost for this project.

  • Project Assumptions: Pre-planning, requirements analysis, and early development of various policy and program scenarios is a critical success factor and is required in order to quickly respond to Feds “key updates” and implement them “in an Agile and expeditious manner”.

  • Scope of Services Bend Safety Implementation Project Assumptions: • City will coordinate volunteers and City crews to implement the plan.

  • EXHIBIT A: 2 | City of Bend, Oregon Project Assumptions The project may be managed with work orders that are initiated for all or part of a task or for multiple tasks that are within budget.

  • Options to site the new call center are in the following locations: o Florida o South Carolina o North Carolina o Texas o Utah Issues and Analysis Project Assumptions:  Space Requirement Approx.

  • Eg. Configuration reuqirements for SMS, customer interfaces and language translations Prior to project start date Project Assumptions The following assumptions have been made when estimating this project and requirements.

  • Delays to dependencies or incorrect assumptions The Deliverables / Resources / Dependencies to be provided by the Client and Project Assumptions are clearly stated above.

  • Project Assumptions relevant to this Scope of Services include: • The existing well buildings will remain to house the electrical, controls and disinfection equipment.


More Definitions of Project Assumptions

Project Assumptions. The scope of this engagement is limited by the following assumptions. Requirements over and above these limitations will be defined in a mutually agreeable Change Order and may be subject to additional charges.
Project Assumptions. The assumptions in this subsection are given to aid grant administration. They represent understandings and expectations that are not included in other sections of this Funding Agreement.

Related to Project Assumptions

  • Incremental Assumption Agreement means an Incremental Assumption Agreement in form and substance reasonably satisfactory to the Administrative Agent, among the Borrower, the Administrative Agent and, if applicable, one or more Incremental Term Lenders and/or Incremental Revolving Facility Lenders.

  • Project Assets means all physical and other assets relating to (a) tangible assets such as civil works and equipment including foundations, embankments, pavements, road surface, interchanges, bridges, culverts, road over-bridges, drainage works, traffic signals, sign boards, kilometre-stones, [toll plaza(s)], electrical systems, communication systems, rest areas, relief centres, maintenance depots and administrative offices; and (b) Project Facilities situated on the Site;

  • The Project Plan means the document to be developed by the Supplier and approved by the Purchaser, pursuant to GCC Clause 19, based on the requirements of the Contract and the Preliminary Project Plan included in the Supplier’s bid. The “Agreed and Finalized Project Plan” is the version of the Project Plan approved by the Purchaser, in accordance with GCC Clause 19.2. Should the Project Plan conflict with the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Project Land means any parcel or parcels of land on which the project is developed and constructed by a promoter;

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Xxxxxx Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • New Project means (a) each facility which is either a new facility, branch or office or an expansion, relocation, remodeling or substantial modernization of an existing facility, branch or office owned by the Borrower or its Subsidiaries which in fact commences operations and (b) each creation (in one or a series of related transactions) of a business unit to the extent such business unit commences operations or each expansion (in one or a series of related transactions) of business into a new market.

  • Project Architect means the architect retained by Lessee to design and supervise construction of the Improvements.

  • Project Improvements means site improvements and facilities that are:

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Assignment and Assumption Agreement means the Assignment and Assumption Agreement in substantially the form attached hereto as Exhibit A.

  • Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.