Production potential definition

Production potential means the estimated amount of milk, expressed in litres, that a producer can ship on a daily basis without exceeding the allotted quota.
Production potential means the capacity of a well to produce oil, gas or water, calculated or measured in accordance with generally accepted procedures;
Production potential means the capacity of a well to produce oil, gas or water, calculated

Examples of Production potential in a sentence

  • This statute requires advanced consideration be given and notice be made for follow-on OT for Production potential.

  • Andrefouet (2009).Planning the use of fish for food security in the Pacific, Marine Policy, Volume 33, Issue 1, January 2009.Notes:• Data in this table from Bell et al (2009): Planning the use of fish for food security in the Pacific, Marine Policy, Volume 33, Issue 1, January 2009.• Estimated sustainable Production potential is based on 3 t/ sq.

  • Production potential of castor intercropping with legumes under rainfed conditions.

  • In 5 years, 18 million vaccine shots were supplied .– Production potential for foreign markets.

  • Production potential of different moth bean [Vigna aconitifolia (Jacq.) Marechal] varieties under north Gujarat condition.

  • Production potential of 36 poplar clones grown at medium length rotation in Denmark.

  • If, in the opinion of the Corporation, there was not sufficient Production potential before the occurrence of loss or damage by hail or fire or both to warrant leaving the Field, or any portion thereof, of the Insured Crop for crop production, no Yield Loss Indemnity shall be payable, and hail insurance on that Field, or any portion thereof, of that Insured Crop shall be deemed terminated on the day before the day on which the loss or damage occurred.

  • Production potential and chemical composition of elephant grass (Pennisetum purpureum Schum.) at different ages for energy purposes.

  • Production, potential and consumption in Norway:There is no production of gallium in Norway and no data indicating imports.

  • Therefore, reviewing Coffee farming, Production potential and constraints was used to develop appropriate technology for productivity improvement and inform policy makers to identify gap.


More Definitions of Production potential

Production potential of new oil and gas well(s) means the calculated fair market value of potential production of oil and gas reserves in New Mexico as determined by a qualified professional engineer based on evaluation of proven reserves.

Related to Production potential

  • Peak tube potential means the maximum value of the potential difference across the x-ray tube during an exposure.

  • Injection Point means the Electric Interconnection Point.

  • Connection Point means an exit point or an entry point or a bidirectional point identified or to be identified as such in an access contract.

  • Destination Point means the delivery point(s) on Carrier’s System where Product is delivered to Shipper, as such points are specified in Section III of this tariff.

  • Development Location Point means a single point selected by the Applicant on the proposed Development site that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development. For a Development which consists of Scattered Sites, this means a single point on the site with the most units that is located within 100 feet of a residential building existing or to be constructed as part of the proposed Development.

  • Process weight means the total weight of all materials introduced into any source operation. Solid fuels charged will be considered as part of the process weight, but liquid and gaseous fuels and combustion air will not.

  • Inter-connection Point means interface point of renewable energy generating facility with the transmission system or distribution system, as the case may be:

  • Interconnection Point means the point(s) of connection(s) at which the project is connected to the grid i.e. it shall be at 11 / 22 kV bus bar level of substation of MSEDCL.

  • Demarcation Point means the point where Qwest owned or controlled facilities cease, and CLEC, End User Customer, premises owner or landlord ownership or control of facilities begin. "Designed, Verified and Assigned Date" or "DVA" means the date on which implementation groups are to report that all documents and materials have been received and are complete.

  • Collection Point means the collection point for the Vehicle specified in the Confirmation and/or Rental Agreement;

  • Valuation Point means such time as shall be specified in the relevant Supplement for each Fund.

  • COGSA means the Carriage of Goods by Sea Act of the United States of America approved on 16th April 1936.

  • Downtime means the Total Minutes in the Month during which the Cloud Service (or Servers for Server Provisioning) does not respond to a request from SAP’s Point of Demarcation for the data center providing the Cloud Service (or Server for Server Provisioning), excluding Excluded Downtime.

  • Operating Margin Customer means a Control Area purchasing Operating Margin pursuant to an agreement between such other Control Area and the LLC.

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Postproduction means an activity related to the finishing or duplication of a medium described in Subsection 59-12-104(54)(a).

  • Contract Quantity means the quantity of Gas to be delivered and taken as agreed to by the parties in a transaction.

  • Blended learning means the delivery of instruction in a combination of time in a supervised physical location away from home and online delivery whereby the student has some element of control over time, place, path, or pace of learning.

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Product Group or “the Group” means a group of lotteries that has joined together to offer a product pursuant to the terms of the Multi-State Lottery Agreement and the Product Group’s own rules.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Production Area means that part of the animal feeding operation that includes the animal confinement area, the manure storage area, the raw materials storage area, and the waste containment areas. The animal confinement area includes, but is not limited to, open lots, housed lots, feedlots, confinement houses, stall barns, free stall barns, milkrooms, milking centers, egg washing or egg processing areas, areas used for the storage and disposal/treatment of mortalities, cowyards, barnyards, medication pens, walkers, animal walkways, and stables. The manure storage area includes, but is not limited to, lagoons, runoff ponds, storage sheds, stockpiles, under-house or pit storages, liquid impoundments, static piles, and composting piles. The raw materials storage area includes, but is not limited to, feed silos, and silage bunkers. The waste containment area includes, but is not limited to, settling basins and areas within berms and diversions which separate uncontaminated stormwater.

  • Mis-procurement means public procurement in contravention of any provision of Sindh Public Procurement Act, 2010, any rule, regulation, order or instruction made thereunder or any other law in respect thereof, or relating to, public procurement;

  • Raw material means any unprocessed material in its raw or natural state that is intended to become part of the components of a cannabis product.

  • Non-Methane Hydrocarbons (NMHC means the sum of all hydrocarbon air pollutants except methane.

  • Service Switching Point (SSP) is a telephone central office switch equipped with a Signaling System 7 (SS7) interface.