Process Plant definition

Process Plant means the systems required to condition, liquefy or vaporise natural gas in all areas of application;
Process Plant means the existing treatment plant(s) certain of which are to be modified in connection with the Project and located in the Mining Areas, as provided for in the Mine Plan, comprising:
Process Plant means the process plant to be completed in connection with the Project, substantially as contemplated in the Mine Plan, and used to process Minerals into doré or gold-silver bearing concentrate.

Examples of Process Plant in a sentence

  • Both process operations are similar and consist of the following activities: • Wet Process Plant- ROM material from the dredge is pumped to the wet plant and the greater than 40-mesh and less than 140-mesh sand and silt material is removed.

  • The ProjectCo shall compensate the Purchaser for any disadvantage incurred or suffered by the Purchaser if and to the extent that the processing of Minerals mined, produced, extracted or otherwise recovered from the Project Real Property is adversely affected by Other Minerals being processed through the Process Plant.

  • Figure 21-2 – Process Plant area general layout indicating Stage 2 expansion.21.1.2.3 Upgrading of Support InfrastructureUtilities and support infrastructure will be expanded in a modularized fashion as necessary to support Stage 2.

  • The information in this announcement that relates to Process Design, Process Plant Capital Costs, and Process Plant Operating Costs is extracted from the Company’s ASX announcements dated September 13, 2018 and July 19, 2018 which are available to view on the Company’s website at www.piedmontlithium.com.

  • Natural gas used in the Project will be obtained from the Atacama gas pipeline that runs 50 km north-northeast of the Process Plant.

  • Process Plant Operating & Maintenance Costs Process Labour & FringesProcess labour costs were derived from a staffing plan and based on prevailing daily or annual labour rates referenced from an industry survey for Canadian wages and benefits.

  • The basis of the capital costs estimates for the Process Plant and Infrastructure are presented in Section 17 and described in further detail in Section 21.2.The mining capital cost estimates are predominantly developed of the operating costs input assumptions described in Section 21.

  • Rainy River Project Estimated Development Capital Expenditures(1) Direct Capital Costs Mining $161 On-Site Infrastructure $92 Process Plant $304 Tailings Facility $65 Access Corridor $19 Off-Site Facilities $22Total Direct Capital Costs $663Total Owners’ and Indirect Capital Costs $214Total Project Development Capital Costs $877(1)In millions.The after-tax net present value of the Rainy River Project at a 5% discount rate is projected to be $759 million.

  • Australia Fluor Daniel Diversified Plant Services Pty Ltd Australia Fluor Daniel Gas Services Pty Ltd Australia Fluor Daniel Process Plant Services Pty Ltd Australia Maritime Maintenance Services Pty Ltd Australia Fluor Daniel (Qld) Pty.

  • A contingency is included in the initial capital costs which is 15% of the sum of Directs (Process Plant, General & Site Utilities, Tailings Storage & Waste Rock Facilities, Camps), Indirects and EPCM.


More Definitions of Process Plant

Process Plant means the carbon in xxxxx process plant to be constructed in connection with the Project substantially as contemplated in the Feasibility Study and used to process Minerals into doré bars.
Process Plant means the metallurgical facility that processes the raw ore into finished products (ie copper and cobalt cathode and zinc sulfate.) Procurement Items means materials, equipment, systems, components structures and other items purchased for the Project by the EPCM Contractor acting as MMB’s agent as part of the EPCM Services.
Process Plant means the plant for processing perlite ore located on the Process Plant Land.

Related to Process Plant

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Bulk mixing plant means machinery, appliances or other similar devices that are assembled in such a manner so as to be able to mix materials in bulk for the purposes of using the mixed product for construction work;

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Processing Plant means plant systems, located on or off the Leased Premises, that include a gas processing plant, natural gasoline plant, gasoline plant, or other plant where raw unprocessed natural gas is processed to remove or extract Raw Mix from the natural gas stream to produce a Pipeline- Quality Natural Gas or Residue Gas and other products, and the Raw Mix is then either (i) separated by fractionation down to its base components prior to storage and/or transport that meets or conforms to all applicable Gas Processors Association (GPA) Standards and/or Specifications for the commercial sale of each liquefiable hydrocarbon product, or (ii) transported to another plant for separation down to its base components by fractionation prior to storage and/or transport for the commercial sale of each liquefiable hydrocarbon product. Any deductions, costs, or processing fees associated with the removal or recovery of Natural Gas Liquids is strictly limited to only that part of any Processing Plant or facility where Raw Mix is recovered, and if applicable at that plant, also fractionated to their component parts.

  • Cannabis testing facility means an entity registered by

  • Bulk plant means a motor fuel storage and distribution facility that is not a terminal and from

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Scope of Work means the description of Services and Deliverables specified in the Contract and as may be amended.

  • Design-build team means an entity that consists of:

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Installation Work means the construction and installation of the System and the Start-up, testing and acceptance (but not the operation and maintenance) thereof; all performed by or for the Power Producer at the Premises.

  • RFP Process or “Bidding Process” means the process governing the submission and evaluation of the Bids as set out in the RFP itself;

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Test means such test as is prescribed by the particulars or considered necessary by the Inspecting Officer whether performed or made by the Inspecting Officer or any agency acting under the direction of the Inspecting Officer;

  • Project Scope means the description or activity of work to be accomplished on the Project.

  • Manufacturing Facilities means facilities engaged in the mechanical or chemical transformation of materials or substances into new products and shall include:

  • Cannabis processing facility means a person that: