Examples of Primary energy source in a sentence
Primary energy source: NuclearNuclear as an input to electricity generation = 263 trillion Btu (total consumption and direct distribution to electricity generation)613.
In energy sector, following four sectors as per IPCC 2006 Guidelines are covered to track emission from energy consumption.1. Primary energy source exploration and exploitation2.
A ship, to accomplish a safe and successful journey, needs an expert navigator at thehelm, a captain who knows the capacities of the vessel, geography, meteorology, water currents, navigational astronomy, supplies management, and other related matters.
Primary energy source: CoalCoal as primary energy source = 423.1 trillion Btu (total consumption)57 Distribution of coal as a primary energy source shows: Coal as an input to electricity generation: 357.6 trillion Btu58 Coal as an input to the industrial end use sector: 63.9 trillion Btu59 Coal as an input to the commercial end use sector: 1.6 trillion Btu602.
The 12 timespace paradigm In addressing the question of a number paradigm intrinsic to the time equation 𝑡𝐵 + 1 = 𝑡𝐴 other than the golden ratio values of 𝜑 and −1, the idea of how the time equation relates with the spaceφequation needs reconsideration.
Primary energy source: Not Provided Project description: Not Provided Energy centre description: Not Provided Heat/cooling demand phasing description: Not Provided LA Name: Click here to enter text.
Funding will be sought through a myriad of sources including, but not limited to, HOPE VI, Choice Neighborhood Initiatives, Low Income Tax Credits, Historic Tax Credits, New Market Tax Credits, tax‐exempt bonds, FHA financing, and private financing.
Primary energy source" means the fuel or fuels used for the generation of electric energy.
The Project would consist of 6 wind turbine generators (3.45 MW, each), a buried submarine cable connecting the turbines (inter-array cable), and a buried submarine cable from the turbine closest to shore to the Project Substation located onshore in the City of Cleveland (export cable), totaling approximately 12 miles.
A bleeder valve shall be located at the threaded connection.The front suction shall be located on the passenger side of the bumper extension.The front suction shall be electrically operated valve with an electric control at the pump operator's panel.