Preliminary breath test definition

Preliminary breath test means a pre-arrest breath test.
Preliminary breath test means a breath test under section 69;”;
Preliminary breath test means a preliminary alcohol

Examples of Preliminary breath test in a sentence

  • Preliminary breath test (PBT) instruments are approved for use in the state of Washington as breath alcohol screening devices, subject to the requirements of RCW 46.61.506 and Chapter 448-15 WAC (ADMINISTRATION OF BREATH ALCOHOL SCREENING TEST).

  • Division 2 Alcohol testing 11 Preliminary breath test or breath analysis‌ (1) An authorised person's power under section 126 of the Rail Safety National Law (NT) to require a rail safety worker to submit to testing by means of a preliminary breath test or breath analysis (or both) is subject to this Division.

  • PBT Preliminary breath test, a test administered by a law enforcement officer at the scene of a suspected DWI, which can form the basis for an arrest, but cannot be admitted into evidence at trial.

  • Preliminary breath test laws (BREATH) indicate whether the state has authorized a breath test as establishing probable cause for DUI.

  • Preliminary breath test (PBT) can determine if alcohol is presently being consumed;2.

  • Preliminary breath test - An officer using the hand-held breath tester shall be trained.

  • In the same line, 3.1% said that passive/informal alcohol sensor is also used while 1.6% affirmed that all of the test devices are used and finally 3.1% of respondents argued that none of them are used.The reliable information shows that Preliminary breath test devices are mostly used with 92.2% while Passive or alcohol sensors are used with 3.1%.


More Definitions of Preliminary breath test

Preliminary breath test means a machine operated by an officer that measures the blood alcohol content of a person’s expired breath.

Related to Preliminary breath test

  • Witness Test means the Company’s right to witness the commissioning testing and/or Company-required Interconnecting Customer-owned communication system. Commissioning testing is defined in IEEE Standard 1547-2003.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • RDDS test Means one query sent to a particular “IP address” of one of the servers of one of the RDDS services. Queries shall be about existing objects in the Registry System and the responses must contain the corresponding information otherwise the query will be considered unanswered. Queries with an RTT 5 times higher than the corresponding SLR will be considered as unanswered. The possible results to an RDDS test are: a number in milliseconds corresponding to the RTT or undefined/unanswered.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • COVID-19 test means a viral test for SARS-CoV-2 that is:

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Percolation test means a subsurface soil test at the depth of a proposed absorption system or similar component of an OWTS to determine the water absorption capability of the soil, the results of which are normally expressed as the rate at which one inch of water is absorbed. The rate is expressed in minutes per inch.

  • Confirmation test means a drug or alcohol test on a sample to substantiate the results of a prior drug or alcohol test on the same sample and which uses different chemical principles and is of equal or greater accuracy than the prior drug or alcohol test;

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Root Cause Analysis Report means a report addressing a problem or non-conformance, in order to get to the ‘root cause’ of the problem, which thereby assists in correcting or eliminating the cause, and prevent the problem from recurring.

  • Collateral Quality Test A test satisfied as of the Effective Date and any other date thereafter on which such test is required to be determined hereunder if, in the aggregate, the Collateral Obligations owned (or in relation to a proposed purchase of a Collateral Obligation, both owned and proposed to be owned) by the Issuer satisfy each of the tests set forth below (or, after the Effective Date, if any such test is not satisfied at the time of reinvestment, the level of compliance with such test is maintained or improved as described in the Investment Criteria):

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Quantitative fit test or "QNFT" means an assessment of the adequacy of respirator fit by numerically measuring the amount of leakage into the respirator.

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Collateral Quality Tests means the Collateral Quality Tests set out in the Investment Management Agreement being each of the following:

  • Completion Rate means the percentage of an apprenticeship cohort who receives a certificate of apprenticeship completion within 1 year of the projected completion date. An apprenticeship cohort is the group of individual apprentices registered to a specific program during a 1 year time frame, except that a cohort does not include the apprentices whose apprenticeship agreement has been cancelled during the probationary period or who have transferred.

  • Fit test means the use of a protocol to qualitatively or quantitatively evaluate the fit of a respirator on an individual.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Reference evapotranspiration or “ETo” means a standard measurement of environmental parameters which affect the water use of plants. ETo is given expressed in inches per day, month, or year as represented in Appendix C of these Guidelines, and is an estimate of the evapotranspiration of a large field of four to seven-inch tall, cool-season grass that is well watered. Reference evapotranspiration is used as the basis of determining the Maximum Applied Water Allowances.

  • major non-compliance outcome notification means a notification received by a council under section 19N(3) or (4) of the Food Act 1984, or advice given to council by an authorized officer under that Act, of a deficiency that does not pose an immediate serious threat to public health but may do so if no remedial action is taken

  • Critical Test Concentration or "(CTC)" means the specified effluent dilution at which the Permittee is to conduct a single-concentration Aquatic Toxicity Test.

  • Subproject means a development activity proposed by a Beneficiary under Part A.2 (d) of the Project and financed or to be financed through a Subproject Grant (as hereinafter defined) made out of the proceeds of the Development Credit;