Pre-construction meeting definition

Pre-construction meeting means a meeting held between local government entities, owners/developers, contractors, utility companies, and/or other interested parties prior to the start of regulated activities to discuss various aspects of project coordination, inspection, construction phasing, regulatory issues, etc.
Pre-construction meeting means a meeting, coordinated by the RREM/LMI contractor, between the RREM/LMI contractor, housing advisor, and applicant to execute an Amendment to the Homeowner Grant Agreement, a Private Escrow Agreement, and sign Exhibit J of the Design/Build Agreement.
Pre-construction meeting means a meeting, coordinated by the

Examples of Pre-construction meeting in a sentence

  • Daily Reports shall be submitted daily via electronic means (via email or uploaded into e-Builder) to the County and the County’s Representatives as determined at the Pre-Construction Meeting.

  • The Contractor shall provide a sample format of the Daily Report for County review at the Pre-Construction Meeting.

  • If a tack coat is to be required, it must be noted during the Pre-Construction Meeting.

  • Add the following: “At the Pre-Award or Pre-Construction Meeting, the Contractor shall submit the name and location of the intended sources of supply for all bituminous pavement products.

  • An Application for Pole Attachment Permit (“Application”) shall contain all items required pursuant to the Joint Use Rules and Regulations, including but not limited to a Pre-Construction Meeting (if requested by either party), and detailed plans in the form specified in the Joint Use Rules and Regulations.

  • Consultant shall prepare for and attend the Pre-Construction Meeting.

  • Contractor shall coordinate the following with the GT Fire Marshal’s office: Hot Works Permit, Pre-Construction Meeting, 50, 80 and 100% inspections and fire alarm and sprinkler system work.

  • The Commission will assign an invoice target date to the Design-Builder at the Pre-Construction Meeting.

  • To facilitate inspections of critical items, a certain reasonable number of "stop points" will be identified as required at a Pre-Construction Meeting, to be chaired by an authorized representative of the Lessee.

  • Bid & Construction Phase Services (T&M) $ 6,360.00 Answer Bidder Questions & Addendum 1 2 2 2 7 $ 985.00 Attend Pre-Construction Meeting 2 2 4 $ 720.00 Review Contractor Submittals 1 1 2 2 4 10 $ 1,370.00 Answering Requests for Information 1 2 6 2 2 13 $ 2,065.00 Substantial Completion Walkthrough 2 2 4 $ 720.00 Bid & Construction Phase Expenses $ 500.00 4.


More Definitions of Pre-construction meeting

Pre-construction meeting means all work or operations required by Applicable Standards as reasonably applied by the District to determine the potential Make- Ready Work necessary to accommodate Licensee’s Attachments on a Pole. The Pre- Construction Meeting shall be coordinated with the District and include Licensee’s representative.
Pre-construction meeting means a meeting convened by CPS Energy or a Developer to confirm the Final Design and coordinate the construction schedule and process for a given Underground Project.
Pre-construction meeting means a meeting between the Development, Engineering, and Sustainability Director and an Applicant, its contractor or contractors, Design Engineer/Geotechnical Engineer, and any and all agencies and/or utility companies either directly or indirectly affected by the proposed development, whichmeeting is held prior to the start of any works or services construction.

Related to Pre-construction meeting

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. (NOTE: accessory structures are NOT exempt from any ordinance requirements) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Commencement of Construction means the initial disturbance of soils associated with clearing, grading, or excavating activities or other construction activities.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Construction means any physical change or change in the method of operation (including fabrication, erection, installation, demolition, or modification of an emissions unit) which would result in a change in actual emissions.

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.

  • Construction and demolition debris means and includes:

  • Foreign construction material means a construction material other than a domestic construction material.

  • as constructed plans means as constructed plans as defined in the Building Code;

  • Construction Change Directive means a written order prepared by Owner Parties and signed by Owner directing Contractor to perform a change in the Work prior to agreeing to a change, if any, to the Contract Time, schedule of performance of the Work, Contract Sum, or Contractor’s compensation.