Phases of the Work definition

Phases of the Work means in respect of the work, the engineering phase, procurement phase, construction phase, commissioning phase and turnover phase.

Examples of Phases of the Work in a sentence

  • A Level 2 Schedule means the Work Schedule that further defines each activity of each of the Phases of the Work, delineates major systems/facilities and other significant groupings in durations of weeks and months, as appropriate.

  • The Design-Build Firm's design personnel to be assigned during the Design Phase Phases of the Work and their duties, responsibilities, and fee schedule, and the duration of their assignments are shown on Exhibit I, which is incorporated by reference herein.

  • The term “Notice to Proceed” means a written notice provided by Judicial Council to Design Build Entity authorizing and directing Design Build Entity to begin the Work, or any Phase(s) of the Work, to the extent described in the Notice to Proceed and pursuant to the time indicated in the Notice to Proceed.

  • The Owner shall authorize and cause the Architect to provide those Additional Services described in AIA Document B141 requested by the Construction Manager which must necessarily be provided by the Architect for the Preconstruction and Construction Phases of the Work.

  • The Owner shall authorize and cause the Architect to provide those basic services, which must necessarily be provided by the Architect for the Preconstruction and Construction Phases of the Work.

  • The Owner shall retain an Architect to provide Basic Services, including normal structural, mechanical and electrical engineering services, which must necessarily be provided by the Architect for the Preconstruction and Construction Phases of the Work.

  • The Agreement sets forth the Liquidated Damages for all Phases of the Work.

  • The Contractor shall submit a detailed Project Evaluation Chart covering various key Phases of the Work such as Design, Procurement, Manufacturing, Shipment, Receiving of the Owner Supplied information (if any), and Installation activities within fifteen (15) days of the date of Award of Contract.

  • BUTLER, a Senator from the State of California, to perform the duties of the Chair.Patty Murray,President pro tempore.Ms. BUTLER thereupon assumed the Chair as Acting President pro tempore.fADJOURNMENT UNTIL THURSDAY, MARCH 28, 2024, AT 10 A.M.The ACTING PRESIDENT pro tem- pore.

  • The Owner shall authorize and cause the Architect/Engineer to provide those additional services requested by the Construction Manager which must necessarily be provided by the Architect/Engineer for the Preconstruction and Construction Phases of the Work.

Related to Phases of the Work

  • drainage work means any construction or reconstruction of or any alteration or addition to, or any work done in connection with a drainage installation but shall not include any work undertaken solely for purposes of repair or maintenance;

  • Development Site means any parcel or lot on which exists or which is intended for building development other than the following:

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • piece-work means any work the pay for which is estimated by the amount of work performed irrespective of the time occupied in its performance;

  • Cost of the Work means costs necessarily incurred by the Construction Manager in the proper performance of the Work. Such costs shall be at rates not higher than those customarily paid at the place of the Project except with prior consent of the Owner. The Cost of the Work shall include only the items set forth in this Article 6.

  • Phases in respect of the Project shall mean that the components of the Project are placed in service during more than one year during the Investment Period, and the word “Phase” shall therefore refer to the applicable portion of the Project placed in service in a given year during the Investment Period.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • Project Implementation means all steps which the Grantee undertakes in order to deliver the Project which is being supported by funding provided under this Grant Contract. Any reference to UK primary legislation (Acts) or secondary legislation (Statutory Instruments) in this Grant Contract includes reference to any changes to or replacement of those Acts or Statutory Instruments.

  • Construction Plant means appliances, machinery with necessary supply to up keep and maintenance of the works or temporary works but dose not include materials or other things intended to form part of the permanent work.

  • Excavation work means the making of any man-made cavity, trench, pit or depression formed by cutting, digging or scooping;

  • The Works/Project means the works to be executed or done under this contract.

  • Project Work means the work required to complete the Project.

  • Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:

  • Construction Activities means the disturbance of soils associated with clearing, grading, excavation activities or other construction-related activities.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project Improvements means site improvements and facilities that are:

  • Excavation means the mechanical removal of earth material.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Project site, where applicable, means the place indicated in bidding documents.

  • Renovation means altering a facility or one or more facility components in any way, including the stripping or removal of RACM from a facility component. Operations in which load-supporting structural members are wrecked or taken out are demolitions.

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • Project Site(s) means the place(s) specified in the SCC for the supply and installation of the System.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Substitute Improvements means the substitute or additional improvements of the Issuer described in Article V hereof.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;